Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18041A031 +
- ML18011B136 +
- ML18101A400 +
- ML18101A397 +
- ML18101A395 +
- ML18064A508 +
- ML18064A506 +
- ML20082B920 +
- ML20080G066 +
- ML20080D043 +
- ML20080D025 +
- JPN-94-066, Transmits Response to NRC RAI Re Design of Plant Core Shroud Preemptive Repair.Encl Response Contains Info That MPR Assoc Inc Maintains in Confidence & Withholds from Public Disclosure.Encl Withheld +
- ML20080C909 +
- ML20080C695 +
- ML20078S577 +
- ML20078R240 +
- ML20078R092 +
- ML20078Q924 +
- ML20078Q915 +
- ML20078Q913 +
- ML20078Q893 +
- ML20078Q706 +
- ML20078Q576 +
- ML20078Q527 +
- ML20078Q523 +
- ML20078Q369 +
- ML20078P917 +
- ML20078P906 +
- ML20078P809 +
- ML20077Q382 +
- ML20077G090 +
- ML20135B179 +
- ML20149K173 +
- IR 05000317/1994033 +
- ML20149H892 +
- ML20217N965 +
- TAC:M72174 +
- ST-HL-AE-4948, Forwards Rev 11 to Operations QA Plan +
- 3F1294-18, Informs of Changes Made to Surveillance Procedure for Refueling Interval Integrated Plant Response to Engineered Safeguards Actuation +
- NG-94-4401, Responds to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shroud Bwrs. Insp Plan & Plans of Evaluation Encl +
- RBG-41094, Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl +
- LIC-94-0253, Forwards Rev 1 to EPIP FC-EPF-21, Fort Calhoun Station Sector Map & Revised Index.Procedure Revised to Add Locations for Power Outlets,Security Stations,Fire Protection Equipment & Hazardous Matl Storage +
- HL-4741, Responds to RAI Re GL 92-08, Thermo-Lag Fire Barriers. Gpc Will Complete Required Evaluations & Mods to Resolve Thermo- Lag Fire Barrier Issue for Plant by Startup of Unit 2 from Fall 1998 Refueling Outage +
- NRC-94-4351, Forwards WCAP-14216 & WCAP-14215, AP600 Core Makeup Tank Test Analysis & Request for Withholding WCAP-14215 from Public Disclosure +
- ML20266E125 +
- 05000373/LER-1994-013-05, :on 941114,RCIC Sys Declared Inoperable.Caused by Failure of sub-component within Speed Controller.Repairs & Component Replacements Made on RCIC Turbine Speed & Flow Control Sys +
- 05000457/LER-1994-009-10, :on 941113,discovered That Monthly SI Accumulator Isolation Valve Surveillance Not Performed Due to Personnel Error.Limited Personnel W/Capability to Change/ Delete Predefines +
- ML20079A024 +
- ML20135B486 +
- ML20080C786 +