Forwards Corporate Nuclear Safety Rept 94-03-NAPS-A, SWS Operational Performance (Swsop) Assessment... & C/A Schedule for self-assessment of SWS Performance,Per NRC Granting Request for Reduced Swsop Insp
ML20078P917
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/13/1994
From: Bowling M
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078P922 List:
References
94-684, NUDOCS 9412210023
Download: ML20078P917 (2)


Text

,--

i VruoixxA ELecruzc Ann Pownn Comiwxy Hicn M own, Vino rn A count December 13, 1994 U. S. Nuclear Regulatory Commission Serial No.

94 684 Attention: Document Control Desk NL&P/MAE R1 Washington, D.C. 20555 Docket Nos.

50-1 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 REDUCED SCOPE FOR THE SERVICE WATER OPERATIONAL PERFORMANCE INSPECTION Virginia Electric and Power Company was granted its request for a reduced scope Service Water Operational Performance Inspection at North Anna as documented in NRC's letter dated November 25, 1994.

The approval was based on a self-assessment of North Anna's Service Water System performance. The NRC requested a copy of the final assessment report and the associated corrective actions schedule.

Those items are included as Attachments 1 and 2, respectively, to this letter.

If you have any questions, please contact us.

Very truly yours, j

M. L Bowling, Manager Nuclear Licensing and Programs Attachments cc:

U. S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station I

9412210023 941213 PDR ADOCK 05000338 F

PDR N

q t

4 u

r ATTACHMENT 1 i

~

NORTH ANNA SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE ASSESSMENT h

--,,