Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038A485 +
- ML18036A393 +
- ML18096A303 +
- ML18153C769 +
- ML20085K837 +
- ML20085H643 +
- ML20085E092 +
- ML20083F355 +
- ML20079J234 +
- ML20079H433 +
- ML20079H413 +
- BECO-91-123, Requests NRC Review & Approval of Encl Engineeing Evaluation of Elevated Tailpipe Temp on Safety Relief Valve 203-3D Discovered on 910814.Operation W/Leakage Will Not Cause Setpoint Drift in Excess of Drift Permitted by Tech Specs +
- ML20079G796 +
- ML20079G584 +
- ML20079G576 +
- ML20079G510 +
- ML20079G447 +
- ML20079G217 +
- ML20079F192 +
- ML20079E772 +
- ML20079E762 +
- ML20079E671 +
- ML20094D130 +
- ML20091J115 +
- ML20091D767 +
- ML20262A477 +
- TAC:M68613 +
- RBG-35705, Forwards Rev 13 to Physical Security Plan,Reflecting Current Activities of Station Security Program.Rev Withheld (Ref 10CFR73.21) +
- TAC:80059 +
- B13930, Submits Evaluation of 910323 Inadvertent Pressurization of Isolated Portion of RCS Loop B,Causing Excursion Outside Normal Operating Pressure/Temp Limits.Results Indicated Integrity of Affected Components Not Compromised +
- BECO-91-124, Forwards Anticipated Operator Licensing Exam Schedule,Per Generic Ltr 91-12, Operator Licensing Natl Exam Schedule, +
- B13937, Requests Extension of one-yr Requirement Up to Two Addl Months for Submittal of Rept Re Reactor Vessel Matl Irradiation Surveillance Capsule W-104 on or Before 911204 +
- ML20261K189 +
- ML20217D433 +
- ELV-03148, Requests That Supplemental Response to NRC Demand for Info Be Withheld from Placement in PDR Per 10CFR2.790 Until Decision Is Made in Matter & Responds to Questions Not Previously Addressed +
- 05000346/LER-1991-002, :on 910901,determined That Surveillances Tests for source-range Neutron Flux & Rate Intruments Not Performed Prior to Entry Into Mode 3.Caused by Inadequate Administrative Controls.Procedure Revised +
- 05000278/LER-1991-014-03, :on 910905,HPCI Sys Discovered Inoperable When HPCI Flow Control Loop Power Supply Inverter Inadvertently Turned Off by Installation Workers (non-util;non-licensed). Inverter Will Be Relocated +
- 05000416/LER-1991-005, :on 910617,fault Occurred on B-phase of Breaker J5232 (500 Kv).Caused by Inadequate Maint Practices.High Pressure Tank Replaced & Three Adjacent High Pressure Tanks within B-phase Inspected & Cleaned +
- ML20035D755 +
- ML20035A886 +
- ML20085K419 +
- IR 05000280/1991025 +
- ML18096A308 +
- IR 05000250/1991032 +
- 05000250/LER-1990-020, :on 901013,surveillance Interval of Tech Spec 4.8.2.1 Exceeded Due to Personnel Error.Personnel Involved Counseled & Procedure 4-OSP-201.3 Revised +
- IR 05000315/1991023 +
- ML17329A251 +
- ML16341G291 +
- IR 05000269/1991023 +
- ML14188A826 +