ML20079H413

From kanterella
Jump to navigation Jump to search
Discusses Quarterly Status Rept Re Facility Const Activities.W/O Encl
ML20079H413
Person / Time
Site: Washington Public Power Supply System
Issue date: 10/01/1991
From: Reynolds N
WINSTON & STRAWN
To: Bloch P, Bright G, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#491-12266 OL, NUDOCS 9110110076
Download: ML20079H413 (1)


Text

..

l$Y WINSTON & STRAWN J" '

FAEDER'CK N W'NSTN 0853 tene)

  • 400 L STREET N W n.cu.o cme

$iLA1 M STR AWN t-93uS46i WASH +.GTON DC 20005-350g as west wgatm carve

,,wo wuo s me, mmeo

'91 DCT -3 n 53 ses.m $3n wsa 7,',",' "," f,,,y, J

~,..m..,

October 1, 199$"

n Peter B.

Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University 1

- U.S. Nuclear Regulatory College Station, Texas 77843-Commission Washington, D.C.

20555 Mr. Glenn O.

Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Subj:

Washington Public Power Supply System (WPPSS Nuclear Project No. 1) Dgeket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1983', Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report regarding construction' activities at WNP-1.

During the third quarter of 1991, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort was continuing.

We do not anticipate any change in this level of activity during the next

.several months.

Sincer ly Nicholds S.

_ynolds Coensel or A plicant V

cc:

Service List 9110110076 911001 47 PDR ADOCK 05000460 go l

C PDR Q

L

\\

.,