Advises That Second Inservice Insp/Test Interval Being Extended to 931014 to Account for 296 Day Outage.Final Type a Test of Second Interval Remains Scheduled for Spring 1992 Outage,Per 10CFR50,App J III D (a)
ML18153C769
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/01/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-551, NUDOCS 9110100206
Download: ML18153C769 (2)


Text

'\\ -

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October l, 1991 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 NOTIFICATION OF ASME SECTION XI INTERVAL EXTENSION AND INSPECTION/TEST SCHEDULE Serial No.91-551 NO/ETS:vlh Docket No.

50-280 License No.

DPR-32 During the period September 14, 1988 through July 7, 1989, Unit 1 was shutdown for an extended outage, when numerous maintenance and modification activities were performed. ASME Section XI 1980 Edition, Winter 1980 Addendum, Subparagraph IWA-2400(c), states "For power units that are out of service continually for 6 months or more, the inspection interval during which the outage occurred may be extended for a period equivalent to the outage." Therefore, pursuant to ASME Section XI, the second lnservice Inspection Interval for Surry Unit 1 is being extended to account for the 296 day outage. The end date for the second interval will now be October 14, 1993 and, correspondingly, the third interval October 14, 2003.

Currently, Surry Unit 1 is in the third period of the second 1 O year interval. In addition to the interval extension noted above, applying the grace period in accordance with ASME Section XI, Subparagraph IWA-2400(c) will allow Unit 1 to complete its second 1 O year lnservice Inspection requirements over the next two refueling outages. These refueling outages are currently scheduled for the Spring of 1992 and Spring of 1994.

The final Type A test of the second interval remains scheduled for the Spring 1992 outage as required by 1 O CFR 50 Appendix J Ill D (a).

If you have any questions, please contact us.

Very truly yours,

,- (,.-\\.. Q

\\;J l) \\Q.J'\\\\

W. L. Stewart Senior Vice President - Nuclear

,,~s=,1:1. 010(>2(>6 --9110 fr~

PDR ADIJ-~V r)~-.oc*1,-,~~()

F'

.... r-............... i::.o..

PDR

e cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station e