Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199H471 + (09:34:15, 8 December 2024)
- ML20199H469 + (09:34:17, 8 December 2024)
- ML20199H466 + (09:34:18, 8 December 2024)
- ML20199H467 + (09:34:18, 8 December 2024)
- ML20199H464 + (09:34:19, 8 December 2024)
- ML20199H462 + (09:34:20, 8 December 2024)
- ML20199H460 + (09:34:21, 8 December 2024)
- A97071, Provides Response to Request for Addl Info for Evaluation of Third 10-yr Interval Insp Program Plan Request for Relief CR-25,per NRC + (09:34:22, 8 December 2024)
- ML20199H459 + (09:34:22, 8 December 2024)
- ML20199H456 + (09:34:23, 8 December 2024)
- ML20199H453 + (09:34:24, 8 December 2024)
- ML20199H450 + (09:34:29, 8 December 2024)
- ML20199H451 + (09:34:29, 8 December 2024)
- ML20199H448 + (09:34:30, 8 December 2024)
- ML20199H442 + (09:34:40, 8 December 2024)
- ML20199H440 + (09:34:41, 8 December 2024)
- A97067, Provides Detailed Response as Committed to in Util Ltrs to NRC & 1103 Re Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Corrective Actions:Sys Engineering Personnel Briefed on Need to Ensure Offsite Svc + (09:34:48, 8 December 2024)
- ML20199H433 + (09:34:54, 8 December 2024)
- 05000313/LER-1997-004-04, :on 971021,two Remotely Operated Reactor Bldg Isolation Valves Were Not Tested as Required.Caused by Misinterpretation of TS Surveillance requirements.SV-1440 & SV-1443 Were Successfully Stroke Tested + (09:34:56, 8 December 2024)
- ML20199H430 + (09:34:57, 8 December 2024)
- ML20199H429 + (09:34:58, 8 December 2024)
- ML20199H428 + (09:34:59, 8 December 2024)
- ML20199H425 + (09:35:00, 8 December 2024)
- ML20199H426 + (09:35:00, 8 December 2024)
- ML20199H424 + (09:35:01, 8 December 2024)
- 05000424/LER-1997-010-01, :on 971019,manual RT During CR Drop Time Testing Was Noted.Caused by Failed Detector/Encoder Card in Dpri B Data Cabinet.Crs Were Withdrawn,Selecting Data a Only W/No Valid Rod Deviations Indicated + (06:42:12, 9 December 2024)
- ML20199H420 + (06:42:19, 9 December 2024)
- ML20199H417 + (06:42:22, 9 December 2024)
- ML20199H416 + (06:42:23, 9 December 2024)
- ML20199H413 + (06:42:31, 9 December 2024)
- ML20199H409 + (06:42:32, 9 December 2024)
- ML20199H407 + (06:42:33, 9 December 2024)
- ML20199H406 + (06:42:34, 9 December 2024)
- ML20199H400 + (06:42:35, 9 December 2024)
- ML20199H399 + (06:42:35, 9 December 2024)
- ML20199H392 + (06:42:36, 9 December 2024)
- ML20199H390 + (12:17:35, 10 December 2024)
- 05000373/LER-1997-038, :on 971020,inadequate Calibr of HR Instrumentation Was Noted.Caused by Misinterpretation of Ts. Channel Functional Testing Requirements for HR Sys Will Be Corrected Through Procedure Changes + (12:17:40, 10 December 2024)
- ML20199H386 + (12:17:41, 10 December 2024)
- NRC-98-0016, Forwards Certified Copies of Listed Nuclear Liability Insurance Documents + (12:17:42, 10 December 2024)
- ML20199H381 + (12:17:43, 10 December 2024)
- ML20199H379 + (12:17:48, 10 December 2024)
- ML20199H378 + (12:17:48, 10 December 2024)
- 05000213/LER-1986-011, :on 860228,discovered That Fire Protection Water Sys Line & Sprinkler Line Inadvertently Isolated on 860226.Caused by Misinterpretation of Tech Specs.Hourly Fire Watch Established + (12:17:51, 10 December 2024)
- ML20199H375 + (12:17:54, 10 December 2024)
- ML20199H374 + (12:17:56, 10 December 2024)
- ML20199H371 + (12:17:57, 10 December 2024)
- ML20199H373 + (12:17:57, 10 December 2024)
- ML20199H369 + (12:18:14, 10 December 2024)
- ML20199H368 + (12:18:15, 10 December 2024)
- ML20199H367 + (12:18:15, 10 December 2024)