Duke Energy Corporation Catawba Nadear Station
=
4800 Concord Road York, SC 29745 (803) 831-4251 omCE
- ]
(803) 831-3426Mx January, 16, 1999 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555-0001
SUBJECT:
Duke Energy Corporation Catawba Nuclear Station Units 1 and 2
~
Docket Nos.:
50-413 and 50-414 Emergency Plan, Revision 99-1 Enclosed for NRC staff use and review is Revision 99-1 to the Catawba Nuclear Station Emergency Plan.
This revision is effective on January 16, 1999.
This revision is being submitted in accordance with 10CFR50.54 (q)
'and does not decrease the effectiveness of the Emergency Plan.
A detailed revision description is provided as Attachment 1.
The 10CFR50. 54 (q) Evaluation is provided as Attachment 2.
All changes have been specifically highlighted (side-barred) to facilitate review.
By copy of this letter, two copies of this letter are being provided to the NRC, Region.
If there are any questions, please call Steve Christopher at 803-831-4027.
Very Tr ly rs
,,4$5IE G.
R.
Peterson Vice President Attachments:
1.
Detailed Revision Description 2.
10CFR50. 54 (q) Evaluation 3.
Plan Update Instructions
/'
250029 (c)L, )
4.
elan Changes 99012502O2 990116 E PDR ADOCK 05000413!
F PM2
_ -_- a
L.
l U.
S. Nuclear Regulatory Commission
. October 20, 1998
(
Page Two.
1 1
xc:
w/ attachment L. A. Reyes U.S. Nuclear Regulatory Commission J
Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 l
' Atlanta, GA 30303 (w/o attachments):
l.
P.
S. Tam NRC Senior Project Manager (CNS)
U.S. Nuclear Regulatory Commission Mail Stop O-14H25 washington, DC 20555-0001 i
D.
J. Roberts Senior Resident. Inspector (CNS)
L LU.S. Nuclear Regulatory Commission Catawba Nuclear Site l
1 3
I 1
i U.
S. Nuclear Regulatory Commission October 20, 1998 Page Three
)
bxc (with attachments):
Electronic Licensing Library, EC050 bxc (w/o. attachments):
Saluda River Electric Corporation
)
2 P. O. Box 929 Laurens, SC 29630
' North Carolina. Municipal Power Agency Number 1 P..O. Box 29513 Raleigh, NC 27626-0513 NC Electric Membership Corporation T.-R.
Puryear CNO30G Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651 S.
R. Christopher, CN04EP G.
D. Gilbert, CN01RC K.
E. Nicholson, CN01RC RGC Licensing File, CN01RC CN-750.25 l
4
l Catwaba Nuclear Station l
Emergency Plan Revision 99-1 l
Detailed Revision Description TABLE OF CONTENTS j
No changes.
LIST OF FIGURES. TABLES. ATTACIIMENTS No changes.
INTRODUCTION No changes.
SECTION A - ASSIGNMENT OF RESPONSIBILITY No changes.
SECTION H - SITE EMERGENCY ORG ANIZATION No changes.
SECTION C - EMERGENCY RESPONSE SUPPORT AND RESOURCES No changes.
SECTION D - EMERGENCY CLASSIFICATION SYSTEM NOTE: The technical specifications provide the technical basis for many of the Catawba Nr: lear Station EALs. This EAL scheme was based on the EAL descriptions contained in NUREG-0654. To maintain compliance with NUREG-0654 and Emergency Plan commitments, Catawba has had to revise the EALs to match the implemented Improved Technical Specifications. The revisions to the EALs described below have been reviewed and approved by state and local officials. This revision to the EALs was necessitated because of the basis for the EALs was revised.
1.
Section D Replace "3.4.6.2" with "3.4.13" on the following pages in Section D. This revision reflects the numbering format used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
D-4, D-5, and D-6 Page 1 of 6
Cctwsb2 Nucles Station Emergency Plan Revision 99-1 Attachment I l
Detailed Revision Description 2.
Page D-5, Second EAL Replace "0.4 gpm" with "576 gpd" in the second EAL on Page D-5. This revision reflects the units used in the Improved Technical Specifications. The improved Technical Specifications have been implemented at Catawba Nuclear Station.
i l
3.
Page D-6, Second EAL Replace " controlled NC System leakage at 2235 psig in Modes 1through 4" with " reactor coolant pump seal injection flow with NV pump operating and the charging valve full open in Modes 1 through 3"in the second EAL on Page D-6. This revision reflects the units used in the Improved Technical Specifications. The Improved Technical j
Specifications have been implemented at Catawba Nuclear Station.
4.
Page D-7 EAL, First Condition
)
Replace the first condition of the EAL on page D-7 with " Leakage from any NC pressure isolation valve greater than Tech Spec 3.4.14 Limit in Modes I through 4". This revision reflects the conditions stated in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
5.
Page D-7 Replace "3.4.6.2" with "3.4.14" on page D-7. This revision reflects the numbering format used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
6.
Page D-11, Reference 6 Replace "NUREG 065" with "NUREG 0654". This revision corrects a typographical error from a previous revision.
7.
Section D Replace "3.4.8" with "3.4.16" on the following pages in Section D. This revision reflects the numbering format used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
D-21, D-22, and D-24 8.
Pages D-21 and D-22 Replace " Modes 1 through 5" with " Modes 1,2 and 3 with NCS average temperature >
500 F" on pages D-21 and D-22. This revision reflects the applicability modes used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
9.
Page D-21, Second EAL Replace " Figure 3.4-1" with " Figure 3.4.16-1" on page D-21. This revision reflects the numbering format used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
Page 2 of 6
1 1
l Catwaba Nuclear Station Emergency Plan Revision 99-1 t
Attachment I l
Detailed Revision Description I
10.
Page D-45, Reference 1 Replace " Tech Spec 3.3.3.1" with " Selected Licensee Commitments 16.7-10" on page D-
- 45. The information contained in Tech Spec 3.3.3.1 was moved to the Selected Licensee i
Commitments with the implementation of the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
1 11.
Section D Replace:
1 "3/.4.8.1" with "3.8.1" "3/.4.8.2" with "3.8.2" "3/.4.8.3" with "3.8.3" e
"3.8.1.1" with "3.8.1" e
e "3.8.1.2" with "3.8.2" "3.8.2.1" with "3.8.4" e
"3.8.2.2" with "3.8.5" e
"3.8.3.1" with "3.8.3" e
e "3.8.3.2" with "3.8.3" On the following pages in Section D. This revision reflects the numbering format used in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
D-67, D-68, D-69, D-70, D-71, D-72, D-73, D-74, D-75, D-76, 12.
Section D Replace " Tech Specs 3.11.2.1,3.11.2.2,3.11.2.3 and 3.11.2.4" with " Selected Licensee Commitments 16.7 10" on the following pages in Section D. The information contained in Tech Spec 3.3.3.1 was moved to the Selected Licensee Commitments with the implementation of the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
D-88 and D-89 13.
Section D Replace " Tech Spec 3.7.5" with " Tech Spec 3.7.9" on the following pages in Section D.
The information contained in Tech Spec 3.3.3.1 was moved to the Selected Licensee Commitments with the implementation of the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
D-95 and D-107 14.
Page D-100, Basis, Last Sentence Add "that" following "Also, the evacuation of any plant area" in the last sentence of the basis paragraph on page D-100. This revision corrects a typographical error from a previous revision.
1 Page 3 of 6
l Cetw ba Nuclear Station Emergency Plan Revision 99-1 Detailed Revision Description 14.
Page D-113, Second EAL Add "LCO" following "... Technical Specification" in the second EAL on Page D-113.
This revision reflects the proper title of this section in the Improved Technical Specifications. The Improved Technical Specifications have been implemented at Catawba Nuclear Station.
SECTION E - NOTIFICATION METIlODOLOGY No changes.
SECTION F - EMERGENCY COMMUNICATIONS No changes.
SECTION G - PUBLIC EDUCATION AND INFORMATION 1.
Page G-5, Figure G-1 This revision provides the 1999 Emergency Planning calendar.
SECTION H - EMERGENCY FACILITIES AND EOUIPMENT No changes.
SECTION I-ACCIDENT ASSESSMENT 1.
Page I-2,Section I.3.a/I. 3.b, First Sentence Replace "HP/0/B/1009/025" with "SH/0/B/2005/001" in the first sentence of Section 1.3.a/I.3.b on page D-I-2. SH/0/B/2005/001 is now used to perform off site dose projections in the TSC and EOF and has replaced HP/0/B/1009/025.
SECTION J - PROTECTIVE RESPONSE l
No changes.
l l
SECTION K - RADIOLOGICAL EXPOSURE CONTROL No changes.
Page 4 of 6
Catw:.lu Nuclear St: tion Emergency Plan Revision 99-1 Detailed Revision Description SECTION L-MEDICAL AND PUBLIC IIEALTil SUPPORT No changes.
SECTION M - RECOVERY AND REENTRY PLANNING AND POST ACCIDENT OPERATIONS No changes.
SECTION N - EXERCISES AND DRILLS 1.
Page N-3, Section N.4 Add the following as a second paragraph to Section N.4 on page N-3.
" Critiques are held after each drill. Drill critiques are open to all drill participants, drill evaluators and drill observers."
This revision clarifies that critiques are held afler all drills as well as aner exercises.
SECTION O - RADIOLOGICAL EMERGENCY RESPONSE TRAINING No changes.
SECTION P - RESPONSIBILITY FOR TIIE PLANNING EFFORT 1.
Pages P-5 Figure P-2
)
Revise P-5 to reflect the replacement (deletion) of Hp/0/B/1009/025 with SH/0/B/2005/001. This revision reflects the development of a standard procedure for performing off site dose projections in the TSC and EOF.
2.
Pages P-5 Figure P-2 Add "SH/0/B/2005/002 Protocol for the Field Monitoring Coordinator During Emergency Conditions Section P. This revision reflects the development of a new procedure for the Field Monitoring Coordinator.
APPENDIX 1 - DEFINITIONS No changes.
APPENDIX 2 - METEOROLOGICAL PROGRAM Ncchanges.
Page 5 of 6 l
l
Catwzba Nuclear Station Emergency Plan Revision 99-1 Detailed Revision Description APPENDIX 3-ALERT AND NOTIFICATION SYSTEM DESCRIPTION No changes.
APPENDIX 4 - EVACUATION TIME ESTIMATES No changes.
APPENDIX 5 - AGREEMENT LETTERS 1.
Agreement Letter No. 4 Replace Agreement Letter No. 4 (York County Emergency Management) dated January 9,1996, with the new Agreement Letter No. 4 dated December 15,1998. This revision provides the latest agreement letter.
2.
Agreement Letter No. 5 Replace Agreement Letter No. 5 (Charlotte-Mecklenburg Emergency Management) dated December 12,1995, with the new Agreement Letter No. 5 dated November 30,1998.
This revision provides the latest agreement letter.
I Page 6 of 6
...-..... _. ~
Catawba Nuclear Station Emergency Plan Revision 99-1 i
t 10CFR50.54(q) EVALUATION CHECKLIST l
SITE:
EVALUATION CliECKLIST APPLICABLE TO:
l
@ Catawba Nuclear Site Emergency Plan Revision No: 99-1 I
McGuire Nuclear Site Emergency Plan implementing Procedure No:
Oconee Nuclear Site N/A Emergency Planning Functional Area Manual Section Number:
f N/A Other Document :
- 1. Does the change / revision decrease the efTectiveness of the plan resulting in the loss of reasonable assurance that adequate protection can and will be taken in the event of a radiological emergency as required by 10CFR50.47(a)?
YES NO Justification for Answer (Attach additional pages as needed):
(Explain how the change / revision maintains reasonable assurance of adequate protective actions. An explanation may be based on an assessment ofits effects on public health and safety, a review of applicable plans, procedures, and resources, or by demonstration of the affected capabilities in a drill or exercise. Consideration should be given to any applicable site-specific planning needs.)
See attached Justification for Answers to Questions 1 and 2
- 2. Does the change / revision result in the lon of ability to meet any of the standards or applicable requirements i
described in 10CFR50.47(b) and the requirements in 10CFR50 Appendix E or any NRC approved alternatives to L
those standards and requirements? (See page 2 of 2)
YES NO i
Justification for Answer (Attach additional pages as needed):
(Explain any change that reasonably brings into question the ability to meet any of the sixteen standards described in 10CFR50.47(b), and any applicable requirements of 10CFR50.47(d) or any NRC approved alternatives to those requirements.)
See attached Justification for Answers to Questions 1 and 2
- 3. Does this change / revision delete or contradict any regulatory requirement?
YES @ NO Justification for Answer (Attach additional pages as needed):
As described in the attached sheets, this change does not change, revise, delete or contradict any regulatory requirement nor does it change any emergency plan commitments without an equivalent change in the basis for the
]
commitment.
1 h/h Prepared By:
Date:
u yv Reviewed By:
h[
b M, p
!N Date:
l j
1 i -
l Attach description of proposed change.
l l
Revision 0 (09/30/98)
Page 1 of 5 l
l
l Catawba Nuclear Station Emergency Plan Revision 99-1 10CFRSO.54(q) EVALUATION CilECKLIST 10CFR50.47 (b) Review i
Does this change afTect any of the following subject areas of 10 CFR 50.47(b)?
1.
Assignment of ERO responsibilities
[
Yes Z
No 2.
Assignment of on-shift ERO personnel Z
Yes Z
No 3.
Arrangement for utilizing State or local resources and staff 8
Yes
[
No 4.
EALs Yes
[
No 5.
Notifications to off-site agencies, the ERO or the public
[
Yes Z
No 6.
Communications between off-site agencies, the ERO, or the public
[
Yes Z
No 7.
Dissemination of public information
[.
Yes 8
No j
8.
Adequacy of emergency facilities and equipment
[
Yes
,8 No l
9.
Methods, systems, and equipment for off-site response to a radiological
[]
Yes R
No emergency
- 10. Protective Action Recommendations / Determination
[l Yes
-8 No
- 11. Emergency Worker radiological control Z
Yes Z
No
- 12. Medical services for contamination injured personnel
[
Yes Z
No
- 13. Re-entry / Recovery plans Yes Z
No
- 14. Drills and exercises 8
Yes
[
No
- 15. Radiological emergency response training
[
Yes Z
No
- 16. Plan development, review and distribution
[
Yes 3
No 10CFR50. Appendix E Review Does this change effect any of the following subject areas of 10 CFR 50, Appendix E7 (i)(ii)(iii) Emergency plans as described in the FSAR O
Yes Z-No (iv) A. Organization for coping with radiological emergencies
[
Yes Z
No (iv) B. Assessment of radiological emergencies 8
Yes
[
No (iv) C. Classifications EALs and ERO activation Yes
[
No (iv) D. Notification of Federal, State and local agencies and the public
[
Yes 8
No (iv) E. ERFs, equipment, and communications
[
Yes Z
No (iv) F. Training, drills, and exercises Z
Yes
[
No (iv) G. Plans and procedures and surveillance of equipment and supplies Z
Yes
[
No (iv) 11. Re-entry and Recovery following an accident
[
Yes Z'
No Comments:
l See attached Justification for Answers to Questions I and 2 l
l l
Revision 0 (09/30/98)
Page 2 of 5
Catawba Nuclear Station Emergency Plan Revision 99-1 Justification for Answer to Ouestion 1:
Catawba Nuclear Station Emergency Plan Revision 99-1 contains the following categories of revisions. Note: These revisions are described in detail in Attachment I and in the Justification for Answer to Question 2.
1.
Miscellaneous editorial revisions to:
Correct previous typographical and grammatical errors Reflect Technical Specification numbering format changes due to implementation of Improved Technical Specifications Update EAL references in Section D Update the Emergency Planning calendar to the current version e
Reflect the replacement of HP/0/B/1009/025 with Sil/0/B/2005/001 Reflect the development of a new procedure for the Field Monitoring coordinator position, SH/0/B/2005/002 Update York County and Charlotte-Mecklenburg Emergency Management agreement letters.
2.
Revised certain EAL descriptions and references due to the implementation of the Improved Technical Specifications. The new Technical Specifications provide the technical basis for many of the Catawba Nuclear Station EALs. This EAL scheme was based on the EAL descriptions contained in NUREG-0654. To maintain compliance with NUREG-0654 and Emergency Plan commitments, Catawba has had to revise the EALs to match the implemented Improved Technical Specifications. The revisions to the EALs have been reviewed and approved by state and local officials. The Improved Technical specifications were reviewed and approved by the NRC. The revisions to the EALs were necessitated because of the basis for the EALs was revised.
3.
Added statements in Section N.4 that clearly state that critiques are conducted following drills as well as exercises. This revision does not make any technical changes but only clarifies the site's policy for drill critiques.
The changes described above do not have an adverse impact on the ability of Catawba or any off-site agencies to reasonably assure that adequate protection can and will be taken in the event of a radiological emergency, therefore, these changes are not considered to decrease the effectiveness of the Emergency Plan.
Page 3 of 5 1
(
Catswba Nuclear Station Emergency Plan Revisioz 99-1 i
Justification for Answer to Ouestion 2 The answer to Question 2 is determined by evaluating the questions listed in the chart provided on Page 2. The following provides the evEluation of the questions on Page 2.
There are no Emergency Plan changes included in Revision 99-1 that affect the assignment of ERO responsibilities.
i 2.
There are no Emergency Plan changes included in Revision 99-1 that affect the assignment j
of on-shift ERO personnel.
3.
Question 3 was answered Yes because the York County and the Charlotte-Mecklenburg Emergency Management agreement letters with Catawba were updated.
4.
Question 4 was answered Yes because certain EALs were revised due to the implementation of new Technical Specifications at Catawba. This revision is discussed in detail in the JusGrication for the Answer to Question 1.
5.
There are no Emergency Plan changes included in Revision 99-1 that affect the notifications to off site agencies, the ERO or the Public.
6.
There are no Emergency Plan changes included in Revision 99-1 that affect the communications between off site agencies, the ERO or the Public.
7.
There are no Emergency Plan changes included in Revision 99-1 that affect the dissemination of public information.
8.
There are no Emergency Plan changes included in Revision 99-1 that affect the adequacy of emergency facilities and equipment.
9.
There are no Emergency Plan changes included in Revision 99-1 that affect the methods, systems and equipment for off site response to a radiological event.
10.
There are no Emergency Plan changes included in Revision 99-1 that affect Protective Action Recommendations or Determinations.
I 1.
There are no Emergency Plan changes included in Revision 99-1 that affect emergency worker radiological control.
12.
There are no Emergency Plan changes included in Revision 99-1 that affect the medical services for contamination injured personnel.
13.
There are no Emergency Plan changes included in Revision 99-1 that affect the reentry / recovery plans.
Page 4 of 5
Catawba Nuclear Station Emergency Plan Revision 99-1 14.
Question 14 was answered Yes because Section N.4 of the Emergency Plan was revised to clearly state that critiques shall be conducted following both drills and exercises.
15.
There are no Emergency Plan changes included in Revision 99-1 that affect the radiological emergency response training.
16.
There are no Emergency Plan changes included in Revision 99-1 that affect the plan development, review and distribution.
10CFR50 Appendix E (i)(ii)(iii)
There are no Emergency Plan changes included in Revision 99-1 that affect the Emergency Plan as described in Section 13.3 of the FSAR.
l 1
(iv)
A.
There are no Emergency Plan changes included in Revision 99-1 that affect the 1
organization for coping with radiological emergencies.
(iv)
B.
This question was answered Yes because the procedure for performing off-site Radiological Dose Projections was replaced with a new procedure.
(iv) C.
See the response to 10CFR50.47(b) Question 4 above.
(iv)
D.
There are no Emergency Plan changes included in Revision 99-1 that affect the notification of federal, state, and local agencies and the public.
(iv) E.
There are no Emergency Plan changes included in Revision 99-1 that affect the ERFs, equipment and communications.
(iv) F.
See the response to 10CFR50.47(b) Question 14 above.
(iv) G.
This question was answered Yes because the procedure for performing off-site Radiological Dose Projections was replaced with a new procedure and a new Field Monitoring Coordinator was generated.
(iv) 11.
There are no Emergency Plan changes included in Revision 98-3 that affect the reentry / recovery plans.
Page 5 of 5
Catwaba Nuclear Station Emergency Plan Revision 99-1 Plan Update Instructions Replace Revision 98-3 Cover Sheet with Revision 99-1 Cover Sheet 1
Table of Contents No Changes List of Figures, Tables, Attachments No Changes Introduction No Changes Tab A - Assignment of Responsibility i
No Changes i
. Tab B - Onsite Emergency Organization No Changes 1
Tab C - Emergency Response Support & Resources No Changes Tab D - Emergency Classification System Replace Pages:
D-4 through D-7 e D-Il e D-21
- D i e D-24
- D-31 e D-45 D-67 through D-76
- D-88
- D-89 e D-95 e D-100 i
e D-107
)
- D-ll3 Tab E - Notification Methods & Procedures No Changes Tab F-Emergency Communications No Changes Page 1 of 3 l
I r
-.. -. - - _ = _
Catwcba Nuclear Station Emergency Plan Revision 99-1
' Attachment 3 Plan Update Instructions Tab G - Public Education & Information l
Replace Page G-5 and Figure G-1 (1999 Emergency Planning Calendar)
{
i Tab H - Emergency Facility & Equipment No Changes Tab I-Accident Assessment Replace Page 12 i
i Tab J - Protective Responsc j
No Changes j
Tab K - Radiological Exposure Control No Changes Tab L - Medical & Public Health Support No Changes
~ Tab M - Recovery & Re-entry Planning No Changes' Tab N - Exercises & Drills Replace Page N Tab O - Radiological Emergency Response Training No Changes Tab P - Development, Periodic Review & Distribution of Emergency Plans
' Replace Page P-5 Tab Q - Appendices Appendix 1 - Definitions No Changes Appendix 2 - Meteorological Systems No Changes Appendix 3 - Alert & Notification System No Changes Appendix 4 - Evacuation Time Estimates No Changes i
Page 2 of 3 l
l
Catweba Nuclear Station Ea.
- y Plan Revision 99-1 Plan Update Instnutions Appendix 5 - Agreement Letters Replace Agreement Letters
. - Number 4 Number 5 e
Page 3 of 3
y I
e i
l l
l l
I i
I 1
1
\\
i i
i l
l l
1 Catawba Nuclear Station Emergency Plan Revision 99-1 Plan Changes i
l i
l I
1 l
I
-m7x:-