Notification of 980220 Meeting W/Util in Arlington,Tx to Discuss Three Apparent Violations Re Activities Associated W/Removal of Unit 1 Borated Water Storage Tank Vacuum Relief Valve
ML20199H450
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/30/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9802050049
Download: ML20199H450 (4)


Text

.

a ps tac % UNIT E D ST ATES y- \

f, NUCL EAR REGULATORY COMMISSION f ,

REOtONeV

  • - . 611 RY AN PLAFA DRIVE, SulTE 4t*

9 ARLINGTON, TE XA5 760118064 NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc.

Name of Facility: Arkansas Nuclear One, Units 1 and 2 Docket: 50-313; 50-368 D EA No.: 97-574 Date and Time Friday, February 20,1998 @ 1 p m.

ofLeeting:

Location of Meeting: NRC Region IV Office, Arlington, Texas -

4th Floor, Training Conference Room Purpose of Meeting: Predecisional enforcement conference to discuss three apparent violations concerning activities associated with ine removal of the Unit 1 borated water storage tank vacuum relief valve.

NRC Attendees: James Dyer, Deputy Regional Administrator Dwight Chamberlain, Deputy Director, Division of Reactor Safety Pat Gwynn, Director, Di,ision of Reactor Projects Gary Sanbom, Enforcement Officer Elmo Collins, Chief, Project Branch O Thomas Stetka, Acting Chief, Engineering Branch Michael Runyan, Reactor inspector Paula Goldberg, Reactor inspector Licensee Attendees: Randy Hutchinson, Vice President, Operations Dwight Mims, Director, Licensing Rick Lane, Director, Design Engineering Charlie Zimmerman, Plant Manager, Unit 1 i Charles Turk, Manager, Mechanical / Civil /Stuctural Engineering Randy Fuller, Manager, Operations, Unit 1 Joe Kowalewski, Manager, System Engineering, Unit 1 Pine Dietrich, Manager, Maintenance, Unit 1 NOTE:

(1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify M. F. Runyan at (817) 860-8142 by COB on Febuary 17,1998.

/

1 Approved By: a -

Arthur T. {owell 111, DirTctdr Division orReactor Safety

/g , h .

/

9002050049 900130 PDR ADOCK 05'X)O313 .

l o

Enteigy Operations, Inc. 2-

- Meeting February 20,1998 DISTRIBUTION:

C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967 Executive Vice President

& Chief Operating Officer Entergy Operatinns, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc. ,

P.O. Box 31995 Jackson, Mississippi 39286 Mcnager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 David D. Snellings, Jr., Director Divisica cf Radiation Control and Emegency Management Arkar.sas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852

Entergy Operations, Inc. 3-Meeting February 20,1998 E-Mall To; EQB

,3 (JED1, DDC, TPG, EEC, TFS, MFR, PAG)NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR 2 ACT Acting, ADT/NRR

] RPZ GK ADP/NRR G. Kalman, Project Manag a, NRR OE MAILD/OE LJC OGC KMK K. Kennedy, Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanbom, EO

] BWH KEP B. Henderson, PAO Ken Perkins, Director, WCFO JAC1,CJG RA Secretaries JT,DLF DRo Division CLG,LMS,NLH DRS Division '

WSW DNMS Division LSO Linda Ousley cc:

DMB (iE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV Fila DOCUMENT NAME: R:\_ANO\AN721MN.MFR To receive copy of document. Indicate in bax:"C" = Copy wMhout enclosures "E" =, Copy with enclosures "N" = No copy RIV:EB: SRI MAC:EB ,

PAO @ RSLO (% PBC )_ D:DRjig M MFRunyan/lfiib TFStetka# BHenderson CAHackney EECollind" ATHdQ 01BW98 01/v/98 01Ap98 01M98 017f28 OW8 OFFICIAL RECORD COPY

n i

4 Entergy Operations, Inc. 3-Meeting February 20,1998 E-Mail To: EQB (JED1, DDC, TPG, EEC,1.CS, MFR, PAG)NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR ACT Acting, ADT/NRR RPZ ADP/NRR GK G. Kalman, Project Manager, NRR OE MAILD/OE LJC OGC KMK K. Kennedy, Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO KEP Ken Perkins, Director, WCFO JAC1,CJG RA Secretaries LAT,DLF DRP Division CLG, LMB, NLH DRS Division WSW DNMS Division LSO Linda Ousley I-cc:

.gggy)n r OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DOCUMENT NAME: R:\_ANO\AN721MN.MFR To receive copy of document, indicate in box:"C" = Copy wthout endosures "E" tr Copy wth enclosures "N" = No copy RIV:EB: SRI # AC:EB ,

PAO @ RSLO % PBC )_ D:DRh /

MFRunyan/ifEb TFStetka# BHenderson CAHackney EEColliatfF ATHFlelf l 01Bt(98 01/o/98 t 01$98 01 U98 017)dD8 o'F2198 i OFFICIAL RECORD COPY 1

.