Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228B189 + (18:37:02, 8 January 2025)
- ML17228B190 + (18:37:02, 8 January 2025)
- L-95-134, Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks + (18:37:03, 8 January 2025)
- ML17228B184 + (18:37:06, 8 January 2025)
- ML17228B181 + (18:37:07, 8 January 2025)
- ML17228B183 + (18:37:07, 8 January 2025)
- ML17228B180 + (18:37:08, 8 January 2025)
- L-95-148, Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs + (18:37:09, 8 January 2025)
- ML17228B179 + (18:37:09, 8 January 2025)
- L-95-176, Special Rept:On 950517,1B EDG Engine Start Failure Alarm Sounded 30 Min Into Surveillance Run.Caused by Failure of One cylinder.1B EDG Declared Out of Svc.Failed Governer Assembly Replaced.Failed Assembly Sent Out for Insp + (18:37:11, 8 January 2025)
- DD-95-10, Notice of Directors Decision (DD-95-10) Re Request for Enforcement Action Against FPL for Allegedly Violating Antitrust License Conditions Applicable to Plant.Due to NRC Resolution,No Proceeding Re Petition Will Be Instituted + (18:37:14, 8 January 2025)
- IR 05000320/2004028 + (18:37:29, 8 January 2025)
- ML17228B165 + (18:37:31, 8 January 2025)
- ML17228B163 + (18:37:32, 8 January 2025)
- L-95-171, Monthly Operating Repts for May 1995 for St Lucie + (18:37:33, 8 January 2025)
- ML17228B159 + (18:37:35, 8 January 2025)
- L-95-153, Responds to BNL Requesting Joint Frequency Distribution of Wind Direction,Speed & Stability at St Lucie Plant for CY94.Info Encl + (18:37:36, 8 January 2025)
- L-95-161, Informs That on 950503,upon Completion of Scheduled Annual Emergency Drill,Including Full Scale Siren Activation & Sounding,Notifications Received from Public That Siren Not Heard.Siren Sys Checked & Deemed Operational on 950505 + (18:37:38, 8 January 2025)
- L-95-149, Discusses RG 1.97 Re Proposed Mod to Wide Range SG Level Instrument + (18:37:39, 8 January 2025)
- ML17228B152 + (18:37:42, 8 January 2025)
- ML17228B150 + (18:37:43, 8 January 2025)
- ML17228B149 + (18:37:44, 8 January 2025)
- TAC:M83506 + (18:37:45, 8 January 2025)
- ML17228B148 + (18:37:46, 8 January 2025)
- ML17228B147 + (18:37:46, 8 January 2025)
- L-95-139, Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation + (18:37:47, 8 January 2025)
- L-95-140, Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update + (18:37:52, 8 January 2025)
- ML17228B144 + (18:37:52, 8 January 2025)
- L-95-146, Monthly Operating Repts for Apr 1995 for St Lucie + (18:37:54, 8 January 2025)
- ML17228B139 + (18:38:02, 8 January 2025)
- ML17228B137 + (18:38:04, 8 January 2025)
- ML17228B135 + (18:38:05, 8 January 2025)
- 05000389/LER-1995-003-01, :on 950410,TS Scheduled Surveillance Was Missed Due to Procedural Deficiency.Performed Airlock Leak Test within 24 H Deferral Interval of TS 4.0.3 + (18:38:06, 8 January 2025)
- ML17228B133 + (18:38:07, 8 January 2025)
- ML17228B132 + (18:38:08, 8 January 2025)
- L-95-127, Forwards St Lucie Unit 2 Annual Environ Operating Rept for 1994,Vols I & II + (18:38:09, 8 January 2025)
- IR 05000335/1995006 + (18:38:14, 8 January 2025)
- ML17228B127 + (18:38:16, 8 January 2025)
- ML17228B125 + (18:38:20, 8 January 2025)
- ML17228B123 + (18:38:21, 8 January 2025)
- L-95-132, Provides Requested Verification of 1993 Radioactive Effluent Release Data for Plant + (18:38:22, 8 January 2025)
- ML17228B121 + (18:38:24, 8 January 2025)
- L-95-126, Requests Review & Appeal of Fees Assessed by Invoice SS0455-95,dtd 950417.Util Disagrees W/Prescribed Fee J2080 for Listed Amount on Invoice + (18:38:26, 8 January 2025)
- ML17228B119 + (18:38:26, 8 January 2025)
- ML17228B117 + (18:38:30, 8 January 2025)
- L-95-123, Forwards Rev 0 to PSL-100-AOA-95-1, St Lucie Unit 1 Second ISI Interval Request for Authorization of Alternative Exam + (18:38:31, 8 January 2025)
- ML17228B113 + (18:38:35, 8 January 2025)
- ML17228B110 + (18:38:49, 8 January 2025)
- ML17228B109 + (18:38:51, 8 January 2025)
- ML17228B108 + (18:38:52, 8 January 2025)
- 05000335/LER-1994-008-01, :on 941104,inadvertent Cis Caused by Failed B Instrument Inverter Concurrent W/Channel D Cis in Tripped Condition.Cis Was Reset + (18:38:53, 8 January 2025)