L-95-132, Provides Requested Verification of 1993 Radioactive Effluent Release Data for Plant

From kanterella
Jump to navigation Jump to search
Provides Requested Verification of 1993 Radioactive Effluent Release Data for Plant
ML17228B122
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/27/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To: Tichler J
BROOKHAVEN NATIONAL LABORATORY
References
L-95-132, NUDOCS 9505090143
Download: ML17228B122 (8)


Text

i c~

P RIC)RI"EY ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9505090143 DOC.DATE: 95/04/27 NOTARIZED: NO FACXL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power

& Light Co.

RECXP.NAME RECIPIENT AFFILIATION TICHLER,J.

Brookhaven National Laboratory DOCKET g

05000335 05000389

SUBJECT:

Provides requested verification of 1993 radioactive effluent release data for plant.

DISTRIBUTION CODE:

IE48D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.36a(a)(2)

Semiannual Effluent Release Reports NOTES:

RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL: ACRS NRR/DOTS/TERB/B RGN2 FILE EXTERNAL BNL TICHLERIJ NRC PDR COPIES LTTR ENCL 2

2 1

1 1

1 1

1 1

"1 1

1 1

1 RECIPIENT ID CODE/NAME

'PD2-1 PD FILE CENTER 01 ADRS S/RPB LXTCO AKERS I D COPIES LTTR ENCL 1

1 1

1 2

2 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE!CONTACl THE DOCU!ii!ENTCO!i TROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlihIINATE YOUR NA!iIEPRO!il DISTRIBUTIONLISTS I'OR DOC LMEN'I'S YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 13

Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954.0128 FPL April 27, 1995 L-95-132 Ms. Joyce Tichler Brookhaven National Laboratory Analytical Sciences Division Building 490D P.O.

Box 5000

Upton, NY 11973 Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 es onse to B ookhave ational Laborator e uest for 1993 Radioactive E

lue t Release Data Verification This letter is being submitted in response to Brookhaven National Laboratory letter dated April 4, 1995, which requested verification of 1993 radioactive effluent release data for the St. Lucie Plant.

Attached are the marked-up data pages that require correction and/or additional information.

If there should be any questions please contact us.

Very truly yours, Qi@~

D. A.

ager Vice P esident St.

ie Plant DAS/PTQ cc:

USNRC'Document Control Desk, Washington, DC Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Stephen Klementowicz, USNRC, Washington, DC Attachments 9505090143 950427

'DR

'ADOCK 05000335 R

  • '" 'DR an FPL Group company

4 ill v ~

I

Corrections to Brookhaven National Lab for St. Lucie 1993 Effluent Summary Reference Brookhaven Page Numbers:

Page 1 for Unit Number 1, the line Thermal Power...

as found:

Thermal Power(MWH) 1.74E+07 Net Electrical Power(MWH) 5.43E+06 change to:

Thermal Power(MWH) 2.26E+07 Net Electrical Power(MWH) 7.14E+06 Page 1 for Unit Number 2, the line Thermal Power...

as found:

Thermal Power(MWH) 1.56E+07, Net Electrical Power(MWH) 4.71E+06 change to:

Thermal Power(MWH) 1.73E+07 Net Electrical Power(MWH) 5..43E+06 Page 22 for line FE-59 should read:

Unit Continuous Mode Nuclide Released Ci Quarter Quarter 1

2 FE-59 Batch Mode Quarter Quarter 1

2 5.74E-05 2.61E-03 Page 29 for line "5. Minimum Time Period for a Batch release(min) should read:

First Six Second Six Months Months

5. Minimum Time Period for a Batch release(min) - 2.65E+02 2.43E+02

li

Page 41 for lines Y-92 and ZR-95(following SR-91):

as found on Brookhaven:

Unit Continuous Mode Nuclide Released Ci Quarter Quarter 1

2 SR-91 Y-92 ZR-95 Make changes as follows:

Delete the ZR-95 line with 2.84E-03, then Change the symbol Y-92 to ZR-95 so that it Batch Quarter 1

1.74E-03 2 '4E-03 reads:

Mode Quarter 2

7 '7E-05 1 '5E-02 Unit Nuclide Released Ci SR-91 ZR-95 Continuous Mode Quarter Quarter 1

2 Batch Quarter 1

1 '4E-03 Mode Quarter 2

7.27E-05 1.15E-02 Page 42 for lines ZR-97 and NB-97(following NB-95):

as found on Brookhaven:

Unit Continuous Mode Nuclide Released Ci Quarter Quarter 1

2 NB-95 ZR-97 NB-97 RU-103 Batch Quarter 1

2 '4E-03 5.16E-04 Mode Quarter 2

1.94E-02 4.42E-03 3.17E-04 Make changes as follows:

Delete the ZR-97 line, then Change the NB-97 line such that the sequence reads as follows:

Unit Continuous Mode Nuclide Released Ci Quarter Quarter 1

2 NB-95 NB-97 RU-103 Other items to convey to Brookhaven:

Batch Quarter 1

2.84E-03 5.16E-04 Mode Quarter 2

1.94E-02 4 '2E-03 3.17E-04 1.

Pages 9,

10, and 11 describe the Abnormal Release Breakdown for Release Number 1, Type of Release Liquid etc.

Comment only: These Nuclides and their Activity Released quantities are already included in the summations of Page 21, and as Continuous Mode Quarter 3 Nuclide's Released on Pages 26 and 27.

The Abnormal Release.

Breakdown quantities should be used for reference only.

2.

Page 8

Line

. B. Gaseous

etc, where one Abnormal Release was reported.

Comment only: It was noted that Brookhaven did not include an Abnormal Release Breakdown for this event.

In case this was an oversight, St. Lucie provides:

a)

The Abnormal Release Breakdown for this event b)

The comment that these Nuclides and their Activity Release quantities are already included in the summations of Page 12 and as Batch Mode Quarter 1 Nuclides Released on Page 14.

The Abnormal Release Breakdown quantities that follow should be used for reference only.

If applicable to Brookhaven requirements, to be inserted after Page No.

11 as:

For St. Lucie Unit Number 1

Abnormal Release Breakdown Release Number 2

Type of Release Gaseous Annual Nuclide Released KR-85 XE-131M XE-133 XE-133M XE-135 Unit Ci Activity Released 4.78E-03 7.80E-04 7.60E-02 7 '9E-04 1.36E-04

f C

I