P RIORIT'Y Z
~
~ .Q.r~
l
ACCESSION NBR:9506190430
DOC.DATE: 95/06/06
NOTARIZED: NO
FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
6 Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power !'ight Co.
AUTH.NAME
AUTHOR AFFILIATION
CASTOiC.
Region
2 (Post
820201)
REC1P.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
SUBJECT:
Forwards insp repts
50-335/95-05
& 50-389/95-05
on
950320-0428
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000335
05000389
wz7
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
.NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN2
FILE
01
TERNAL: LITCO BRYCE,J
H
NRC .PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRISiJ
AEOD/DEIB
-Lg~CE
9.
NRR/DORS/OEAB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
YOTE TO ALL"RIDS" RECIPIENTS:,
PLEASE HELP US TO REDUCE iVASTE!COYTACTTHE DOCL'MENTCONTROL
DESk, ROOM PI-37 (EYT. 504-2083
) TO ELIMIYATE5'OL>R MARIE FROi!
DISTRIBI.'TIOYLISTS FOR DOCUMEYTS YOU DON"I'NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
June 6, 1995
Florida Power
and Light Company
ATTN:
Mr. J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
SUBJECT:
(NRC
INSPECTION
REPORT
NO. 50-335/95-05
AND 50-389/95-05)
Gentlemen:
This refers to the inspection
conducted
by M. Thomas of this office on
March 20-24,
1995, April 10-14,
1995,
and April 24-28,
1995.
The inspection
included
a review of activities authorized for your St.
Lucie facility.
At
the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
Areas. examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the licensee
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because it represents
an
instance
where design
requirements
were not adequately
implemented.
In
addition, the enclosed
Inspection
Report identifies activities that violated
NRC requirements
that will not be subject to enforcement
action
because
the
licensee's
efforts in identifying and/or correcting the violation meet the
criteria specified in Section VII.B. of the Enforcement Policy.
You are required to respond to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosure will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No.96-511.
9506190430
950606
ADQCK 05000335
6
FPKL
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Docket Nos.
50-335,
50-389
License
Nos.
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
D.
A.. Sager
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
H.
N.
Paduano,
Manager
Licensing
and Special
Programs
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
C.
L. Burton
Plant General
Manager
St.
Lucie Nuclear Plant
P.
0.
Box 128
Ft. Pierce,
FL
34954-0128
Robert
E.
Dawson
Plant Licensing Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0218
J.
R.
Newman,
Esq.
Morgan,
Lewis
8 Bockius
1800
M Street,
NW
D.
C.
20036
Charles
A. Casto,
Chief
Engineering
Branch
Division of Reactor Safety
John T. Butler,
Esq.
Steel,
Hector
and Davis
4000 Southeast
Financial
Center
Miami,
FL
33131-2398
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
(cc w/encls cont'd
- See
page
3)
(cc w/encls cont'd)
Thomas
R.
L. Kindred
County Administrator
St.
Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
3300
Rockville,
20852
Distribution
w encls:
K. Landis,
RII
J. Norris,
G.
A. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U.S. Nuclear Regulatory
Comm.
7585 South Highway A1A
Jensen
Beach,
FL
34957-2010
OFFICE
RII:DRS
RII:DRS
RII:DRP
RII:DRS
RII:
P
MThomas
GMacdonal
MMiller
RMathew
MSh mloc
KLandi
COPY7
NO
YES
NO
E
NO
YE
NO
E
NO
NO
OFFICIAL RECORD
COPY
DOCUMENT NAME:S:iDRSiEB STL 505L.MT