Notice of Violation from Insp on 950320-0428.Violation Noted:Installed Overload Heaters Less Conservative than Model Number Required by Pc/M
ML17228B165
Person / Time
Site: Saint Lucie  
Issue date: 05/06/1995
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17228B164 List:
References
50-389-95-05, 50-389-95-5, NUDOCS 9506190441
Download: ML17228B165 (1)


See also: IR 05000320/2004028

Text

e

NOTICE OF VIOLATION

Florida Power

& Light Co.

St.

Lucie Nuclear Plant Unit 2

Docket Nos.

50-389

License

Nos.

NPF-16

During an

NRC inspection

conducted

on March

20 - April 28,

1995,

a violation

of NRC requirements

was identified.

In accordance

with the "General

Statement

of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C,,the violation is listed below:

10 CFR 50, Appendix B, Criterion III, as

implemented

by Florida Power

and

Light (FPIEL) Topical Quality Assurance

Report

(FPLTQAR 1-76A), Revision 38,

requires,

in part,

design control

measures

which assure

the suitability of

application of materials

and parts that are essential

to the safety-related

functions of the structures,

systems,

and components.

Plant

change

and modification

(PC/M) package

039-294,

required that overload

heaters

with the model

number

123F114C

be installed in motor control center

(MCC) 2A5, Compartment

No.

DR3, for Battery Charger

2AA.

Contrary to the above,

as of April 26,

1995, design control measures

did not

assure

that the required overload heaters

were installed in that,

overload

heaters

with the model

number

123F104C

were installed in

MCC 2A5, Compartment

No.

DR3 for Battery Charger

2AA instead of the required

model

number

123F114C.

The installed overload heaters

were less conservative

than the model

number,

required

by the

PC/M.

This is

a Severity Level

IV violation (Supplement I).

Pursuant

to the provisions of 10

CFR 2.201, Florida Power

8 Light Co. is

hereby required to submit

a written statement

or explanation to the U.S.

Nuclear Regulatory

Commission,

ATTN:

Document Control

Desk,

Washington,

D.C.

20555 with a copy to the Regional Administrator,

Region II, and

a copy to the

NRC Resident

Inspector at the facility that is the subject of this Notice,

within 30 days of the date of the letter transmitting this Notice of Violation

(Notice).

This reply should

be clearly marked

as

a "Reply to

a Notice of

Violation" and should include for each violation:

(1) the reason for the

violation, or, if contested,

the basis for disputing the violation, (2) the

corrective steps that

have

been taken

and the results

achieved,

(3) the

corrective steps that will be taken to avoid further violations,

and

(4) the

date

when full compliance will be achieved.

Your response

may reference

or

include previous docketed

correspondence if the correspondence

adequately

addresses

the required

response.

If an adequate

reply is not received within

the time specified in this Notice,

an order or Demand for Information may be

issued

as to why the license

should not be modified, suspended,

or revoked,

or

why such other action

as

may be proper should not be taken.

Where good cause

is shown, consideration will be given to extending the response

time.

Dated at Atlanta, Georgia

this

6

day of May 1995

Enclosure

1

950hi9044i

950606

PDR

ADQCK 05000389

8

PDR