Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279B196 + (11:15:31, 8 January 2025)
- ML17279B195 + (11:15:31, 8 January 2025)
- 05000400/LER-1987-032, :on 870602,radiation Monitor REM-21WL-3541 Sample Chamber Instead of REM-21WS-354 Drained for Disconnection Leaving Monitor Inoperable.Caused by Personnel Error.Procedure HPP-495 Prepared + (11:15:34, 8 January 2025)
- EPID:L-2017-EPR-0001 + (11:15:36, 8 January 2025)
- ML17279B177 + (11:15:36, 8 January 2025)
- SECY-18-0015, Enclosure 3 - Outreach and Summary of Public Comments + (11:15:37, 8 January 2025)
- ML17279B145 + (11:15:37, 8 January 2025)
- ML17279B124 + (11:15:40, 8 January 2025)
- ML17279B122 + (11:15:41, 8 January 2025)
- ML17279B121 + (11:15:42, 8 January 2025)
- ML17279B119 + (11:15:43, 8 January 2025)
- 05000397/LER-1988-016, :on 880518,reactor Protection Sys Actuation Ocurred.Caused by Error in Plant Design.Event Discussed in Mechanics Shop Meeting & Article Describing Event to Be Included in Prefuelling Outage Bulletin + (11:15:44, 8 January 2025)
- 05000397/LER-1988-015, :on 880515,loss of Power to Reactor Protection Sys (RPS) Ocurred Due to Flooding of Reactor Cavity.Caused by Inadvertent Removal of Power to MC-7A.RPS Switched to Alternate Power Supply & RHR Cooling Restored + (11:15:45, 8 January 2025)
- ML17279B115 + (11:15:47, 8 January 2025)
- ML17279B113 + (11:15:48, 8 January 2025)
- IR 05000397/1988018 + (11:15:49, 8 January 2025)
- ML17279B110 + (11:15:50, 8 January 2025)
- 05000397/LER-1988-013-01, :on 880512 & 13,loss of Power Occurred on Reactor Protection Sys (Rps).Caused by phase-to-ground Faults Due to Lightning.Rps Alternate Supply Electrical Protection Assembly Breaker & Logic Reset + (11:15:51, 8 January 2025)
- ML17279B100 + (11:15:52, 8 January 2025)
- ML17279B099 + (11:15:53, 8 January 2025)
- 05000397/LER-1988-012, :on 880606,potential Existence of Unmonitored Radiological Effluent Release Path During Certain Emergency Conditions Determined.Cause Unknown.Fan Disabled.Part 21 Related + (11:15:54, 8 January 2025)
- ML17279B096 + (11:15:55, 8 January 2025)
- GO2-88-136, Informs That Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Rescheduled for Completion from 880515 to 880715 Due to Unavailability of Supporting Resources + (11:15:56, 8 January 2025)
- GO2-88-131, Responds to NRC 880527 Request for Addl Info Re Violations Noted in Insp Rept 50-397/88-02.Details of Overall Assessment of Plant Quality & Program Changes to Improve Quality of Design Mods Will Be Provided at 880607 Meeting + (11:15:57, 8 January 2025)
- 05000397/LER-1988-011-02, :on 880501,reactor Protection Sys Actuation Occurred as Result of Reactor Pressure Vessel Low Water of +13 Inches.Caused by Personnel Error & Inadequate Design. Individual Involved Counseled + (11:15:59, 8 January 2025)
- 05000397/LER-1988-010, :on 880430,nuclear Steam Supply Shutoff Sys Group 1 Isolation Occurred.Caused by Low Pressure in Main Steamlines W/Reactor Mode Switch in Run Position.Valve RFW-FCV-10B Repaired + (11:16:00, 8 January 2025)
- IR 05000397/1988006 + (11:16:02, 8 January 2025)
- ML17279B079 + (11:16:04, 8 January 2025)
- ML17279B082 + (11:16:04, 8 January 2025)
- ML17279B075 + (11:16:05, 8 January 2025)
- TAC:67381 + (11:16:06, 8 January 2025)
- ML17279B070 + (11:16:06, 8 January 2025)
- GO2-88-121, Informs That Meeting Stipulated Date for Response to Request for Info Not Possible.Info Will Be Submitted by 880624 Per 880517 Telcon W/Rb Samworth & Pl Powell + (11:16:07, 8 January 2025)
- IR 05000397/1988013 + (11:16:10, 8 January 2025)
- ML17279B064 + (11:16:12, 8 January 2025)
- PNO-V-88-032, on 880512,radiation Alarm Caused by Improper Valve Lineup Resulted in Spill of Radioactive Spent Resins to Radwaste Area Floor.No Offsite Release Occurred. Inadequate Controls Permitted 3/4 Inch Drain Valve to Open + (11:16:13, 8 January 2025)
- GO2-88-117, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-02.Corrective Actions:Plant Switchgear Inspected, W/Exception of Main Generator Voltage Regulator Panel,No Addl Filters Discovered + (11:16:14, 8 January 2025)
- GO2-88-116, Clarifies 880307 Application for Amend to License NPF-21 Re Single Loop Operation.Application Not in Conflict W/ 10CFR51.52,Paragraph (a)(3) Requirements in That Discharged Fuel Will Conform to 10CFR51.52 Assumptions + (11:16:15, 8 January 2025)
- TAC:67538 + (11:16:15, 8 January 2025)
- GO2-88-115, Advises That Util Response to Suppl 1 to IE Bulletin 85-003 Will Be Submitted Following BWR Owners Group Submittal.Util Will Complete Any Addl Activities as Result of Suppl by End of Spring 1989 Refueling Outage + (11:16:17, 8 January 2025)
- GO2-88-068, Advises That Mutual Resolution to Open Items & Concerns Re Re Emergency Action Levels Achieved,Per 880304 Telcon. Emergency Plan Changes Consistent W/Procedural Rev & Being Readied for Submittal + (11:16:18, 8 January 2025)
- IR 05000397/1988010 + (11:16:21, 8 January 2025)
- GO2-88-113, Requests Exemption from 10CFR20,App a, Use of GMR-I Canisters for Protection Against Radioiodine. Proposed Limitations,Usage Restrictions & Applicable Controls for Use of GMR-I Canister Specified in Encl + (11:16:23, 8 January 2025)
- ML17279B044 + (11:16:23, 8 January 2025)
- ML17279B041 + (11:16:30, 8 January 2025)
- ML17279B039 + (11:16:31, 8 January 2025)
- ML17279B037 + (11:16:31, 8 January 2025)
- TAC:65232 + (11:16:32, 8 January 2025)
- ML17279B035 + (11:16:32, 8 January 2025)
- GO2-88-112, Augmented Application for Amend to License NPF-21,deleting Organization Charts from Tech Specs & Adding Text to Tech Spec Sections 6.2.1 & 6.2.2.Fee Paid + (11:16:33, 8 January 2025)
- ML17279B031 + (11:16:37, 8 January 2025)