ML17279B119

From kanterella
Jump to navigation Jump to search

Amend 60 to License NPF-21,revising License Condition 2.c.(16) to Extend Fourth Refueling Outage Deadline for Implementing Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring.Neutron Flux Monitor Must Be Qualified
ML17279B119
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/10/1988
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17279B120 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-66889, NUDOCS 8806230094
Download: ML17279B119 (4)


Text

~P,S SEgI P0 Cy 0

C O

Vl0 Op Vr+

gO W**y4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

60 License No.

NPF-21 1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),

dated December 23, 1987 as supplemented by letter dated January 15, 1988 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance >>ith the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Sg0gP30094 85000397 80610 pDR

>DOCH, 0 pDR P

f kf

2.

Accordingly, Paragraph 3.(b) of Attachment 2 to Facility Operating License No.

NPF-21 (as referenced in License Condition 2.C(16)) is hereby amended to read as follow:

(b)

The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the fourth refueling outage.

3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION George W. Knighton, Director

~

~

~

~

Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Date of Issuance:

June 10, 1988