ML17279B075
| ML17279B075 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/23/1988 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17279B076 | List: |
| References | |
| NUDOCS 8806030058 | |
| Download: ML17279B075 (4) | |
Text
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
57 License No.
NPF-21 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),
dated November 12, 1986 and November 18, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8806030058 880523 PDR ADOCH, 05000397 P
2.
Accordingly, paragraph 2.E of Facility Operating License No. NPF-58 is hereby amended to read as follows:
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:
"WNP-2 Physical Security Plan," with revisions submitted through November 18, 1987; "WNP-2 Guard Training and gualification Plan,"
with revisions submitted through September 26, 1986; and "WNP-2 Safeguards Contingency Plan," with revisions submitted through March 27, 1985.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION George
. Knigh
, Director Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Date of Issuance:
Nay 23, 1988