Notifies of Intent Not to Perform Large Load Reduction Test Prior to 871130,in Response to NRC 870908 Ltr.Test Performance Discussion Continues.Conclusion & Revised Schedule Will Be Provided When Determined
ML17279B195
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/06/1987
From: Waston R
CAROLINA POWER & LIGHT CO.
To: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-585 HO-870512-(), HO-870512-(0), NUDOCS 8710160173
Download: ML17279B195 (2)


Text

Rr 2't "i *i I'NFORlIATlQN DISTRIBUTIQI YSTEM (RIDS)

ACCESSION NBR: 87iaihai73 DOC. DATE: 87/10/06 NOTAR?iED: NO DOCKET FACIL: 50-400 Shea". on Harv ' Nuc1ea- Power Planti Unit iI Carolina osaaa~ao AUTH. NAME AUTHOR AFF I L 1'AT I O'i WASTON> R. A. Carolina Power '.c Light Co.

RECIP. NAME RECIP IEN; AFFILIATION HERDT> A. R. Region 2. Of f i ce of Director

SUBJECT:

Notifies of intent not to perform large load reduction test prior to 87Ii30I in response to NRC 8705'08 ltr. Test perf ormance discussion continues. Conclusion LLc revised schedule will be pTovided when determined.

DISTRIBUTION CODE:

TITLE: General IEOID COPIES RECEIVED: LTR (50 Dkt)-Insp Rept/Notice of Violation l ENCL Q SIZE:

Response

NOTES: Application for permit renewal filed.. asoooeoo RECIPIENT CQPlES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD -'-.i PD BUCKLEYI 8 INTERNAL: AEOD i DEDRQ

'RR t IQR I SSEAUr D i 'RR/DOEA DIr. i NRR/DREP/EPB NRR/DREP/RPB NRR/DRIS DIR i NRR/PMAS/ILRB i QE - <RMAN J 1 QGC/HDSi i REG FILE i RES DEPY GI i RG FILE Oi i LPDR 'XTERNAL:

NRC PDR NSIC O.

TOTAL NUMBER OF CQP IES REQUIRED: LTTR 20 ENCL

Carolina Power & Light Company HARRIS NUCLEAR PROST I3 P. 0. Box 165 New Hill, North Carolina 27562 October 6, 1987 File Number.'SHF/10-10000 NRC-585 Letter Number'. HO-870512 (0)

Mr. Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety Office of Inspection and Enforcement, Region II United States Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, GA 30323 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 LARGE LOAD REDUCTION FROM 100X POWER TEST

Dear Mr. Herdt:

In response to your letter dated September 8, 1987, this is to inform you that Carolina Power & Light Company (CP&L) does not intend to perform the Large Load Reduction Test (from 100/ power) prior to November 30, 1987. -

CP&L is currently discussing performance of this test with the Nuclear Regulatory Commission staff at the Office of Nuclear Reactor Regulation. Mr. F. Jape of the Region II staff has been advised of the situation.

We will keep you informed of the conclusions reached and provide you with our revised schedule as soon as it is determined.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project RAW/ONH/skm

'Dr.

cc. J. Nelson Grace (NRC-RII)

Mr. B. C. Buckley (NRR)

Mr. G. F. Maxwell (NRC-SHNPP)

NRC Document Control Desk 87101b0173 87100b PDR ADOCK 05000400 MEM/HO"8705120/1/OS1 P PDR