ML17279B110
| ML17279B110 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/06/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17279B111 | List: |
| References | |
| NUDOCS 8806220082 | |
| Download: ML17279B110 (5) | |
See also: IR 05000397/1988018
Text
ACCELERATZD
DISCI'RIBUTION
DEMONSTRATION
SYSTEM
'3
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8806220082
DOC.DATE: 88/06/06
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
PATE,R.J.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
SUBJECT:
Forwards Insp Rept 50-397/88-18
on 880509-27.No violations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR 3
ENCLl SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE~IEBERNAN, J
KEG FIL@
02
RCHSFILE
01
TERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
~ 1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
NRR MORISSEAUFD
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DRPS
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
j
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
~I
'JUN -6
]ggg
Docket No. 50-397
Washington Public Power Supply System
P.O.
Box 968 3000 George Washington
Way
Richland,
99352
Attention:
Mr.
G.
C.
Sorenson,
Manager
Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection of Nuclear Plant
No.
2
This refers to the routine inspection
conducted
by Mr.
C. Clark of this office
on May 9-27,
1988, of activities authorized
by
NRC License
No.
NPF-21 and to
the discussion of our findings held with members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
On'g i'n a. I
5i'g iied
Robert J.
Pate,
Chief
Reactor Safety Branch
Enclosure:
Inspection
Report
No. 50-397/88-18
cc: w/enclosure:
C.
M. Powers,-WNP-2 Plant Manager
P.
L. Powell,
WNP-2 Licensing Manager
G.
D. Bouchey, Director, Assurance
& Licensing
G.
E.
Doupe,
Esq.,
A.
Lee Oxsen, Assistant
Managing Director for Operations,
MD/1023
State of Washington
N.
S.
Reynolds,
Esq.
Bishop,
Cook, Purcell
8 Reynolds
1200 Seventeenth
Street,
N.W.
Suite
700
20036
C, >, P'~9~, ESq,
<t:I'PSS
bcc w/enclosure:
Docket File
Project Inspector
Resident
Inspector
G.
Cook,
RV
j
B.
Faul kenberry,
RV
J. Martin,
RV
T. Foley,
bcc w/o enclosure:
M. Smith
J. Zollicoffer
REGION V
CC 1 ar k/Joan
6/ W/88
PA L>
SRichards
6
88
spy
RJPat&Jf~
6/$ /88
R
UEST
COPY j
RE
EST
COPY j
COPY j
ES /
NO
S /
NO
YES /
NO
S
D TO
PDR j
YS /
NO