ML17279B070

From kanterella
Jump to navigation Jump to search

Forwards Eg&G EGG-PHY-8032, Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual Through Amend 4. Nineteen Discrepancies Raised in Conclusion Requested to Be Addressed Through New Rev to Manual
ML17279B070
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/19/1988
From: Samworth R
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279B071 List:
References
TAC-67381, NUDOCS 8806020221
Download: ML17279B070 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 May 19, 1988 Docket No.:

50-397 Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.

Box 968 3COO George Washington Way

Richland, Washington 99352

Dear Mr. Sorensen:

SUBJECT'EFERENCE:

WASHINGTON NUCLEAR PROJECT NO.

2 (WNP-2) - ACCEPTANCE OF OFFSITE DOSE CALCULATION MANUAL, UPDATED THROUGH AMENDMENT NO.

4 (TAC NO. 67381)

(a)

October 17, 1983 letter from G.

C. Sorensen to Director of Nuclear Reactor Regulation (b)

November 3, 1983 letter from G.

C. Sorensen to Director of Nuclear Reactor Regulation (c)

August 16, 1984 letter from J.

D. Martin to J.

B. Martin d)

February 26, 1985 letter from J.

D. Martin to J.

B. Martin e)

February 20, 1986 letter from C.

M. Powers to J.

B. Martin (f)

August 20, 1986 letter from C.

M. Powers to J.

B. Martin With reference (a) Washington Public Power Supply System (WPPSS, licensee) provided an Offsite Dose Calculation Manual (ODCM) for WNP-2.

Several minor changes were provided in reference (b).

Accompanying references (c), (d), (e), and (f), you submitted Amendments I, 2, 3, and 4 respectively to the WNP-2 ODCM in accordance with WNP-2 Technical Specification 6.14.2.

No further revisions have been reported by the WPPSS through December 31, 1987.

The WNP-2 ODCM through the forth amendment has been reviewed although a number of pages in the resultant document have incorrect pagination.

The evaluation and comments on your ODCM are contained in the TER, EGG-PHY-8032 (enclosed).

We find that this ODCM uses methods that are, in general, consistent with the staff guidelines and is an acceptable reference for the interim.

880602022i 880519 PDR ADOCN, 05000397 P

-0

Mr. G.

C. Sorensen The TER lists a number of discrepancies, some typographical in nature, others dealing with technical issues.

Since these comments involve refinements to a basically sound document, there is no need for immediate attention.

However, we ask that you address the 19 points raised in the Conclusions section of the enclosed TER as well as the problem of inconsistent pagination within six months in a new revision to the ODCM.

Sincerely, original signed by Robert Samuorth Robert B. Samworth, Project Directorate Division of Reactor IV, V and Special Senior Project Manager V

Projects - III, pr ojects

Enclosure:

As stated L Cunn ng am JEWiggington RJBarrett to r ODLynch DBMattews DISTRIBUTION NRC 5 Loca'1 PDRs DMCrutchfield RBSamworth OGC EJordan JPartlow ACRS (10)

LJCunningham FAWenslawski, RV Central Files DISTRIBUTION w o enclosure:

AW NAME :RBSamworth:cw DATE:5 88:

5 ghton 88 W

~

W

~

WO WH

~

~

~

~

OFFICIAL RECORD COPY

.0

~ y

~

1 I

~t

~p,R REGS(

Wp0 A

I 0

I IA9 r

/y/p (N

+k*W+

t UNITED STATES t

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 19, 1988 Docket No.:

50-397 Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way

Richland, Washington 99352

Dear Mr. Sorensen:

SUBJECT:

WASHINGTON NUCLEAR PROJECT NO.

2 (WNP-2) - ACCEPTANCE OF OFFSITE DOSE CALCULATION MANUAL, UPDATED THROUGH AMENDMENT NO.

4 (TAC NO. 67381)

REFERENCE:

(a)

October 17, 1983 letter from G.

C. Sorensen to Director of Nuclear Reactor Regulation (b)

November 3, 1983 letter from G.

C. Sorensen to Director of Nuclear Reactor Regulation (c)

August 16, 1984 letter from J.

D. Martin to J.

B. Martin d)

February 26, 1985 letter from J.

D. Martin to J.

B. Martin e)

February 20, 1986 letter from C.

M. Powers to J.

B. Martin (f

August 20, 1986 letter from C.

M. Powers to J.

B. Hartin With reference (a) Washington Public Power Supply System (WPPSS, licensee) provided an Offsite Dose Calculation Manual (ODCH) for WNP-2.

Several minor changes were provided in reference (b).

Accompanying references (c), (d), (e), and (f), you submitted Amendments 1, 2, 3, and 4 respectively to the WNP-2 ODCH in accordance with WNP-2 Technical Specification 6.14.2.

No further revisions have been reported by the WPPSS through December 31, 1987.

The WNP-2 ODCM through the forth amendment has been reviewed although a number of pages in the resultant document have incorrect pagination.

The evaluation and coments on your ODCM are contained in the TER, EGG-PHY-8032 (enclosed).

We find that this ODCM uses methods that are, in general, consistent with the staff guidelines and is an acceptable reference for the interim.

I

Mr. G.

C. Sorensen The TER lists a

number of discrepancies, some typographical in nature, others dealing with technical issues.

Since these comments involve refinements to a basically sound

document, there is no need for immediate attention.
However, we ask that you address the 19 points raised in the Conclusions section of the enclosed TER as well as the problem of inconsistent pagination within six months in a new revision to the ODCM.

Sincerely,

/(~~SR Robert B. Samworth, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated

Mr. G.

C. Sorensen The TER lists a number of discrepancies, some typographical in nature, others dealing with technical issues.

Since these comments involve refinements to a basically sound document, there is no need for immediate attention.

However, we ask that you address the 19 points raised in the Conclusions section of the enclosed TER as well as the problem of inconsistent pagination within six months in a new revision to the ODCM.

Sincerely, original signed by Robert Samworth Robert B. Samworth, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated DISTRIBUTION w o enclosure:

to r ODLynch DBMattews unnsng am JEWiggington RJBarrett DISTRIBUTION NRC 5 Local PDRs DMCrutchfield RBSamworth OGC EJordan JPartlow ACRS (10)

LJCunningham FAWenslawski, RV Central Files I

NAME :RBSamworth:cw DATE :5 i 88 5

ghton 88

~

~

+we w

ww

~

~

~

~

W W ~

W

~

OFFICIAL RECORD COPY

Nr. G.

C. Sorensen, Nanager Washington Public Power Supply System MPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S. Reynolds, Esq.

Bishop, Cook, Purcell 5 Reynolds 1400 L Street NM Washington, D.C.

20005-3502 Nr.

G.

E.

Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3GOO George Washington May

Richland, Washington 99532 Nr. Curtis Eschels, Chairman Energy, Facility Site Evaluation Council Nail Stop PY-11 Olympia, Washington 98504 Nr.. P. L. Powell, Licensing Manager Mashington Public Power Supply System P. 0.

Box 968, ND 956B Richland, Mashington 99352 Nr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, ND 1023

Richland, WA 99352 Nr. R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, HD 280

Richland, Washington 99352 Nr. C. N. Powers WP-2 Plant Hanager Washington Public Power Supply System P. 0.

Box ND 927N Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350