ML17279B096
| ML17279B096 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/02/1988 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8806150307 | |
| Download: ML17279B096 (7) | |
Text
REGULATOR" INFORMATION DISTRIBUTION
~ TEM (RIDS)
(~-'CCESSiON NSR:8805150307 DOC. DATE: 88/05/08 NOTARIZED:
NO DOCKET F'ACIL: 50-397 WPPSS Nuclear Pro Jecti Unit 2i Washington Public PoUje 05000397 AUTH. NAME AUTHOR AFFILIATION KIRSCHz D. F.
Region 5i Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION SORENSEN> G. C.
Washington Public Power Supply System
SUBJECT:
Confirms 880524 L Oxsen telcon e/P Johnson re mgt meeting UJ/util on 880607 in Region V. List of agenda items 8c internal not 1 c e of meeting encl.
DISTRIBUTION CODE:
IE45D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Summary of Significant Meeting with Licensee (Part 50)
RECIPIENT ID CODE/NAME PD5 LA INTERNAL: AEOD/DO*
DEDRO NRR/DREP/EPB 10 NU OCS-ABSTRACT 02 RGN5 FILE 01 EXTERNAL:
LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 REC IP IENT ID CODE/NAME SAMWORTHi R AEOD/DSP/TPAB NRR/DLPG/GAB 10 NRR/PMAS/ILRB12 OGC/ROED RES/DE/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 15
June 2,
1988 Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968 Richland, Washington 99352 Attention:
Mr. G. C. Sorensen Manager of Regulatory Programs Gentlemen:
Subject:
Management Meeting This will confirm Mr. L. Oxsen's telephone discussion with Mr. P. Johnson of this office on May 24, 1988 concerning a management meeting to be held between NRC and Supply System representatives in the Region V conference room at 10:00 a.m.
on June 7, 1988.
Enclosure 1 lists the agenda items to be discussed during this meeting.
Also included is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.
Sincerely,
Enclosures:
Meeting Agenda Notice of Significant Meeting cc:
See next page cc:
D. F. Kirsch, Director Division of Reactor Safety and Projects 8806150307 880602 PDR ADQCK 05000397 P
Mr. Nicholas S. Reynolds, Esq.
Bishop, Cook, Purcell 8 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, DC 20036 Mr. G. E. Doupe, Esq.
Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 99504 Dr. G.
D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD280 Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968, MD 927M Richland, Washington 99352 CCa well PJ on 6/~/88 6/Z/88 RZikoerman DKixsch 6/ 2 /88 6/ 4/88 RE ST COPY E
EST C
PY RE~VEST C
PY YES /
NO YES /
NO (YES) /
NO VEST C
P E
/
NO R
YES /
NO
Enclosure I MANAGEMENT MEETING WASHINGTON PUBLIC POWER SUPPLY SYSTEM June 7, 1988 AGENOA 1.
Opening
- Remarks, Purpose of Conference J.
B. Martin, Regional Administrator, and D.
W. Mazur, Supply System Managing Director 2.
Issues of Current NRC Interest Personnel Performance/Involvement in Recent Plant Problems Engineering/Design Control Documentation/Reporting of Plant Problems 3.
Presentations by Supply System Organizational Initiatives Personnel Performance Issues Design Issues gA/QC Initiatives Balance-of-Plant System Survey Refueling Outage Status/Restart Program SALP Conclusions 4.
Other topics of interest 5.
Closing remarks
NOTICE OF SIGNIFICANT LICENSEE MEETING Name of licensee:
Washington Public Power Supply System Name of Facility:
WNP-2 Docket Number:
Date and Time of Meeting:
Location of Meeting:
%RC Attendees:
Licensee:
50-397 June 7, 1988, 10:00 a.m.
Region V Conference Room, Walnut Creek, California J.
B. Martin, Regional Administrator D. F. Kirsch, Director, Division of Reactor Safety and Projects R. A. Scarano, Director, Division of Radiation Safety and Safeguards R.
P.
Zimmerman, Chief, Reactor Projects Branch P.,H. Johnson, Chief, Reactor Projects Section 3
C. J. Bosted, Senior Resident Inspector, WNP-2 C.
W. Caldwell, Project Inspector D.
W. Mazur, Managing Director G.
D. Bouchey, Director, Licensing and Assurance A. L. Oxsen, Assistant Managing Director - Operations J.
P. Burn, Director, Engineering C.
H. McGilton, Manager, Operational Assurance Programs C.
M. Powers, Plant Manager L. T. Harrold, Manager, Generation Engineering Washington State C. Eschels, Chairman Energy Facility W. Fitch, Executive Secretary Site Evaluation Council:
NOTE:
Attendance at this meeting by NRC personnel other than those listed above should be made known by June 6, 1988 via telephone call to P. Johnson, FTS 463-3745.
cc (w/copy of licensee letter and agenda):
NRC Participants Listed Above D. Crutchfield, NRR G. Holahan, NRR B. Faulkenberry, RV G. Cook, RV S. Richards, RV L. Chandler, OGC G. Knighton, NRR
p.P~
CCa wel 1 PJ on RZimmerman DKirsch 6/ W/88 6/5 8
6/~ /88 6/2 /88 STCP YES NO U
S P
RE/
S C
P g
S ES /
NO
/
NO E
/
NO END TO R
YES NO