ML17279B044

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/88-10 on 880311-0408.No Violations Noted
ML17279B044
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/05/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279B045 List:
References
NUDOCS 8805230088
Download: ML17279B044 (5)


See also: IR 05000397/1988010

Text

'C CEIZRATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8805230088

DOC.DATE: 88/05/05

NOTARIZED: NO

DOCKET

ACIL-50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

ZIMMERMAN,R.P.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SORENSEN,G.C.

Washington Public Power Supply System

SUBJECT:

Forwards Insp Rept 50-397/88-10

on 880311-0408.No violations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR Q ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation

esponse

NOTES

D

RECIPIENT

ID CODE/NAME

PD5

PD

G

RNAL: LPDR

NSIC

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

ERMAN,J

REG FIL

02

FILE

01

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

SAMWORTH,R

AEOD

NRR MORISSEAU P D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

j

A

8

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

%Ay g

iggg

Docket No.

50-397

Washington Public Power Supply System

P.

0.

Box 968

Richland,

Washington

99352

Attention:

Mr.

G.

C.

Sorensen

Manager of Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

C. J.

Bo'sted

and

R.

C.

Sorensen

of this office during the period March ll through April 8,

1988

of activities authorized

by

NRC Operating

License

No.

NPF-21,

and to the

discussion of findings held by the inspectors with Mr.

C.

Powers

and other

members of the Supply System staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

SiD~g~~~

R.

P.

1

erman,

Chief

Reactor Projects

Branch

Enclosure:

Inspection

Report

No. 50-397/88-10

CC:

A.

L.

G.

D.

C.

M.

P.

L.

G.

E.

N.

S.

State

Oxsen, Assistant

Managing Director, Operations

Bouchey, Director, Licensing

& Assurance

Powers,

WNP-2 Plant Manager

Powell,

WNP-2 Licensing Manager

Doupe,

Esq.

Reynolds,

Esq.,

BCP&R

of Washington

8805230088

880505

POR

ADOCK 05000397

9

ncn

MAY 5-

fggg

bcc w/enclosure:

docket file

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

D. Persinko,

NRR

bcc w/o enclosure:

M. Smith

J. Zollicoffer

REG

N

CBo

/dot

re

en

1

Po

on

gg

V$

RZimmerman

~l~c 8~

T COPY )

g

ST

COPY ]

qg

ST

COPY )

EST

COPY ]

ES

NO

YES /

NO

YES'

NO

YES

NO

ND TO

PDR

]

YES /

NO