Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17284A596 + (11:08:34, 8 January 2025)
- ML17284A595 + (11:08:35, 8 January 2025)
- ML17284A593 + (11:08:36, 8 January 2025)
- ML17284A592 + (11:08:37, 8 January 2025)
- ML17284A591 + (11:08:38, 8 January 2025)
- IR 05000397/1988029 + (11:08:41, 8 January 2025)
- ML17284A587 + (11:08:42, 8 January 2025)
- ML17284A586 + (11:08:43, 8 January 2025)
- GO2-88-229, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-33.Corrective Actions:On 881011,test Performed to Determine Dynamic Flow Control Characteriztics of Sample Rack REA-SR-37.Procedure Modified + (11:08:44, 8 January 2025)
- GO2-88-222, Submits Revised Response to Insp Rept 50-397/88-16 Re Fire Protection & Safe Shutdown Capability.Fire in Drywell Expansion Gap Has Very Low Probability of Starting + (11:08:46, 8 January 2025)
- ML17284A583 + (11:08:50, 8 January 2025)
- GO2-88-221, Application for Amend to License NPF-21,revising Tech Spec Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation to Reflect Mods in Sys Configuration & Operation.Fee Paid + (11:08:51, 8 January 2025)
- ML17284A582 + (11:08:51, 8 January 2025)
- ML17284A579 + (11:08:54, 8 January 2025)
- GO2-88-215, Forwards Addl Info Re Equipment Qualification to Help Clarify Util Position & Prevent Misunderstanding.Responses to Potential Enforcement/Unresolved Items Also Encl + (11:08:55, 8 January 2025)
- IR 05000397/1988020 + (11:08:58, 8 January 2025)
- GO2-88-220, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-27.Corrective Actions:Plant Procedure 4.12.4.5, Design Basis Ash Fallout, Revised to Better Define When & How Filters Should Be Replaced + (11:08:59, 8 January 2025)
- GO2-88-217, Responds to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Evaluation of Reactor Vessel Matls, Per Reg Guide 1.99,Rev 2 Underway.Pressure/Temp Curves Will Be Revised + (11:09:01, 8 January 2025)
- ML17284A571 + (11:09:03, 8 January 2025)
- ML17284A568 + (11:09:04, 8 January 2025)
- GO2-88-214, Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10 + (11:09:05, 8 January 2025)
- IR 05000397/1988038 + (11:09:08, 8 January 2025)
- ML17284A563 + (11:09:09, 8 January 2025)
- ML17284A562 + (11:09:11, 8 January 2025)
- ML17284A561 + (11:09:12, 8 January 2025)
- ML17284A559 + (11:09:13, 8 January 2025)
- GO2-88-216, Responds to IE Bulletin 88-007, Power Oscillations in Bwrs. Confirms That Shift Technical Advisors Also Received Training + (11:09:14, 8 January 2025)
- ML17284A558 + (11:09:14, 8 January 2025)
- IR 05000397/1988027 + (11:09:19, 8 January 2025)
- ML17284A555 + (11:09:21, 8 January 2025)
- ML17284A553 + (11:09:22, 8 January 2025)
- 05000397/LER-1988-032, :on 880905,inadvertent Containment Isolation of RCIC Sys Steam Supply Line Occurred While Reactor Pressure Held at 90 Psig.Caused by Personnel Error.Startup Halted & Excess Flow Check Valves Reopened + (11:09:24, 8 January 2025)
- 05000397/LER-1988-033, :on 880907,determined That Tech Spec Re Control Room Emergency Filtration Sys Verification Not Performed Since Startup in Dec 1983.Caused by Personnel Error. Temporary Procedure Will Be Initiated + (11:09:26, 8 January 2025)
- GO2-88-209, Submits Revised Response to SER Question 25 Re Fire Protection & Safe Shutdown Capability.Analysis Performed to Identify high-to-low Pressure Interface Valve Motor Power Feeder Requiring Protection Against Fire Related Reconnects + (11:09:27, 8 January 2025)
- GO2-88-213, Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 890106 + (11:09:29, 8 January 2025)
- 05000397/LER-1988-023, :on 880629,Tech Spec Violation of Secondary Containment to Outside Differential Pressure Occurred.Caused by Sys Configuration Error.Instrument Setpoint Change Request Initiated + (11:09:32, 8 January 2025)
- 05000397/LER-1988-017, :on 880615,problems W/Limitorque Models SMB-000 & SMB-00 Discovered W/Potential Defective Switches.Caused by Design Problem.Investigation & Evaluation of Switch Problems Immediately Initiated.Part 21 Related + (11:09:34, 8 January 2025)
- GO2-88-210, Provides Addl Response to Violations Noted in Insp Rept 50-397/88-02.Plant Mod Criteria List Issued on 880830 & Training Initiated as Committed to Original Response + (11:09:36, 8 January 2025)
- TAC:69992 + (11:09:37, 8 January 2025)
- GO2-88-208, Responds to IE Bulletin 88-004, Potential Safety-Related Pump Loss. Short Term Program Evaluation Yielded Listed Results.Need for Any 30 Day Reporting of Completion of Long Term Action Resolution Not Anticipated + (11:09:38, 8 January 2025)
- ML17284A542 + (11:09:39, 8 January 2025)
- GO2-88-140, Forwards WNP-2 Annual Emergency Exercise - 1988 Objectives & Limitations as First 75-day Submittal to Annual Exercise Program.Remaining 45-day Submittal Will Remain Detailed Description of Exercise Scenario & Actions + (11:09:40, 8 January 2025)
- ML17284A539 + (11:09:41, 8 January 2025)
- 05000397/LER-1988-028, :on 880823,determined That on 870220-21 & 0619,Tech Spec Heatup/Cooldown Limit of 100 F in Any 1 H Period Exceeded.Caused by Program Inadequacy.Heatup & Cooldown Trending Program Added + (11:09:43, 8 January 2025)
- 05000397/LER-1988-029, :on 880824,RCS Unidentified Leakage Noted to Be in Excess of 5 Gpm Tech Spec Limit & RCIC Steam Supply Inboard Isolation Valve Had Large Packing Leak.Caused by Maint Program Deficiency + (11:09:45, 8 January 2025)
- IR 05000397/1988025 + (11:09:47, 8 January 2025)
- GO2-88-205, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-21.Corrective Actions:Plant Heatup Immediately Terminated When Determined to Be Excessive,Engineering Evaluation Performed & Procedure 7.4.4.6.1.1 Revised + (11:09:49, 8 January 2025)
- ML17284A532 + (11:09:49, 8 January 2025)
- GO2-88-200, Forwards Inservice Insp (ISI) Summary Rept for Refueling Outage RF88A, Spring 1988 Per 10CFR55a(g) & IWA-6230 of ASME Section Xi.Includes NIS-1 Re Owner Data & NIS-2 Owner Repts on Repair/Replacement Since Last ISI Summary Rept + (11:09:53, 8 January 2025)
- ML17284A525 + (11:09:53, 8 January 2025)
- IR 05000397/1988028 + (11:10:00, 8 January 2025)
- ML17284A520 + (11:10:01, 8 January 2025)