Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1987019 + (11:01:00, 8 January 2025)
- ML17285A124 + (11:01:02, 8 January 2025)
- ML17285A121 + (11:01:03, 8 January 2025)
- ML17285A118 + (11:01:04, 8 January 2025)
- GO2-88-261, Provides Description of Decision Process Used to Determine Channel Functional Test Boundaries for Second Level Undervoltage Protection Utilized at Facility + (11:01:05, 8 January 2025)
- IR 05000397/1988039 + (11:01:09, 8 January 2025)
- ML17285A110 + (11:01:11, 8 January 2025)
- GO2-88-256, Provides Status Rept Update on Tasks 6 & 8 Re Facility Fire Protection Reevaluation Rept.W/Exception of Remaining Actions Necessary to Complete Task 8 Subsequent to NRC Approval of Amend 37,improvement Initiatives Completed + (11:01:12, 8 January 2025)
- ML17285A109 + (11:01:12, 8 January 2025)
- GO2-88-250, Clarifies Min Staffing Needed for Safe Shutdown Re Insp Rept 50-397/88-16 Dtd 880725.Util Understands That Any Combination of Personnel Meeting 10CFR50,App R Requirements Acceptable + (11:01:13, 8 January 2025)
- ML17285A106 + (11:01:16, 8 January 2025)
- ML17285A105 + (11:01:17, 8 January 2025)
- ML17285A103 + (11:01:18, 8 January 2025)
- 05000397/LER-1988-035, :on 881101,determined That Control Rod Block Intermediate Range Monitor Quarterly Channel Calibr Surveillances Not Performed.Caused by Lack of Review of Testing Required for Changes in Conditions + (11:01:19, 8 January 2025)
- ML17285A096 + (11:01:20, 8 January 2025)
- ML17285A094 + (11:01:21, 8 January 2025)
- GO2-88-255, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-36.Corrective Action Taken:Posting Immediately Restored to Correct Position & Indepth Training on Testing to Verify Restoration of Radiation Area Posting Provided + (11:01:23, 8 January 2025)
- PNO-V-88-064, on 881130,unusual Event Declared & Reactor Shutdown Initiated Due to Determination That Leakage from Suppression Pool Vacuum Breaker Valve CSP-V9 in Excess of Tech Spec Limit.Valve Will Be Repaired + (11:01:23, 8 January 2025)
- GO2-88-239, Forwards Executive Summary for Impaired Function Testing of Limitorque Gearbox Relief Valves,Per Agreement During Exit Meeting Re Insp Rept 50-397/86-12 + (11:01:25, 8 January 2025)
- IR 05000397/1988033 + (11:01:26, 8 January 2025)
- TAC:71128 + (11:01:27, 8 January 2025)
- ML17285A089 + (11:01:28, 8 January 2025)
- GO2-88-218, Advises That All Facility Comments Resolved During 881004 post-exam Review W/T Meadows.No Formal Comments Will Be Submitted + (11:01:29, 8 January 2025)
- ML17285A087 + (11:01:30, 8 January 2025)
- ML17285A083 + (11:01:31, 8 January 2025)
- GO2-88-249, Responds to NRC Re Violations & Deviations Noted in Insp Rept 50-397/88-32.Corrective Actions:Missing Lock Washers Replaced & All Hydraulic Control Unit hold-down Bolts Torqued Checked + (11:01:32, 8 January 2025)
- GO2-88-244, Requests Discretionary Enforcement Re Tech Spec 3/4.3.3 Re ECCS Actuation Instrumentation & Applicability Spec 3.0.3 for 24 H Period Beginning 881121 + (11:01:33, 8 January 2025)
- GO2-88-247, Submits Guarantee of Payment of Deferred Premium,Per 10CFR140.21 Requirements + (11:01:35, 8 January 2025)
- ML17285A078 + (11:01:37, 8 January 2025)
- PNO-V-88-063, on 881121,licensee Declared Unusual Event as Result of Entry Into Tech Spec 3.0.3 & Pending Reactor Shutdown.Action Occurred Due to Inoperable Relays.Relay Testing Completed & Unit Returned to Power + (11:01:38, 8 January 2025)
- ML17285A076 + (11:01:39, 8 January 2025)
- ML17285A075 + (11:01:40, 8 January 2025)
- ML17285A057 + (11:01:41, 8 January 2025)
- RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules + (11:01:42, 8 January 2025)
- 05000416/LER-1917-006, Regarding Completion of Grand Gulf Nuclear Station Shutdown Required by Technical Specifications Because of an Inoperable a Residual Heat Removal Pump + (11:01:46, 8 January 2025)
- CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement + (11:01:47, 8 January 2025)
- ONS-2017-070, Emergency Plan Implementing Procedures, Volume 2, Revision 2017-002 + (11:01:48, 8 January 2025)
- ML17285A032 + (11:01:48, 8 January 2025)
- ML17285A030 + (11:01:49, 8 January 2025)
- ML17285A031 + (11:01:49, 8 January 2025)
- IR 05000293/2017403 + (11:01:50, 8 January 2025)
- PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes + (11:01:51, 8 January 2025)
- ML17284A912 + (11:01:52, 8 January 2025)
- ML17285A000 + (11:01:52, 8 January 2025)
- ML17285A005 + (11:01:52, 8 January 2025)
- GO2-99-181, Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes + (11:01:53, 8 January 2025)
- ML17284A909 + (11:01:55, 8 January 2025)
- ML17284A908 + (11:01:56, 8 January 2025)
- ML17284A906 + (11:01:56, 8 January 2025)
- ML17284A904 + (11:01:57, 8 January 2025)
- IR 05000397/1999011 + (11:01:59, 8 January 2025)