) ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8811290352 DOC.DATE: 88/11/18 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFIEIATION KIRSCH,D.F.
Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION OXSEN,A.L.
Washington Public Power Supply System
SUBJECT:
Requests addi info re Special Rept LER 88-024 re temp in reactor containment in excess of Tech Spec limit of 150 f.
DISTRIBUTION CODE IE22D COPIES RECEIVED:LTR ENCL SIZE TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.
NOTES' I
DOCKET N'5000397,
~.
R I
RECIPIENT
)>>,',.;
ID CODE/NAME,;
PD5 LA SAMWORTH,R COPIES'-
LTTR ENCL 1
.1 RECIPIENT
,ID'ODE/NAME PD5 PD COPIES LTTR."ENCL INTERNAL:
EXTERNAL:
ACRS MICHELSON ACRS WYLIE AEOD/DSP/TPAB'EDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7
NRR/DEST/MTB 9H
.NRR/DEST/RSB 8E NRR/DLPQ/HFB 10
'NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES/DSIR/EIB RGN5 FILE 01 EG&G WILLIAMS',S H ST LOBBY WARD NRC PDR NSIC MAYS,G 1
1 1-1 1
1 1
1 1
2 1
1 1
.4 1
(1 1
ACRS MOELLER AEOD/DOA ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10'RR/DREP/RAB10 NRR DRIS/SIB 9A 02 RES/DSR/PRAB FORD BLDG HOY,A LPDR NSIC HARRIS,J I
V
~
D'8'OIR K) ALL RIDS" RECIPIEPIS:
EKZASE.HELP US IO REDUCE %ASTE!
COtGRCT IHE DOCUMEPI'ONTROL DESK RXM P1-37 (EXZ. 20079) m EIZHZNATE KR3R MNE FRQH DIG'X%MRTIGN IZSTS HZL DOCUMEMIS YOU DON~T,NEEDf A
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 42 ENCL
0
HGV 18 1988 Docket No.
50-397 Washington Public Power Supply System P. 0.
Box 968 Richland, Washington 99352 Attention:
Mr. A. L. Oxsen Assistant Managing Director for Operations Gentlemen:
Subject:
Special Report LER 88-024 This refers to the Special Report LER 88-024, forwarded to our office on August 2, 1988, which reported temperatures in the reactor containment in excess of the Technical Specification limit of 150F.
Our review of this repor t has raised several questions about the event which we would like you to address in a supplemental report.
These questions are as follows:
1.
The "Immediate Corrective Action" section stated that "In an effort to increase cooling to the drywell, reactor closed cooling water system (RCC) valve lineup and flow paths were verified, non critical RCC loads were shed and a third RCC pump was started."
This apparently did not
'correct the problem because the condition lasted for approximately 20 days.
What happened after July 20, 1988 to reduce these temperatures?
2.
3.
Under the "Equipment" section you stated that acoustic monitors associated with relief valves 1B and 1C failed to operate properly due to degraded signal conditions.
Were these failures, and the later failure (on September 7, 1988, which was after LER 88-24) of the monitor for relief valve 4D, related to the higher than expected temperatures?
If there is a relationship between the higher temperatures and the failures, please explain the relationship.
In the "Environmental gualification of Electrical Equipment" section, the report states that the main steam relief valve (MSRV) solenoid valves have a qualified life of 6.4 years at 150F, and that two years at 100F is equivalent to 0.2 years at 150F.
These solenoids were said to have 3.2 years of life remaining at temperatures of 150F or less.
At what temperatures do the solenoids
- operate, and what is the decrease in life expectancy for operation at the higher temperatures?
4.
The same section of your report discussed the acoustic monitors and.their associated electric cables.
Both the monitors and the cables were evaluated at 150F, and the acoustic monitors were mounted directly on the MSRV tailpipes which have had observed temperatures as high as approxi-mately 240F for extended periods of time.
Your report does not document how these temperatures affect the acoustic monitors or the cable.
Your report stated that "Evaluation of the qualified life of the acoustical gggj.290~~
pgg()0397 88i118 pgOCK 8
monitors and associated cables indicates that adequate qualified 'life exists to reach the next scheduled refueling outage, even if the acousti-cal monitor cables experience 210F for the entire period of actual opera-tion from initial fuel load (1983) until the next scheduled refueling."
Your'eport did not address how the 240F tailpipe temperatures were related to the temperatures at the acoustic monitor or the associated cables.
Please explain how the acoustic monitors and the associated cables are affected by the actual temperatures seen by this equipment.
The justification statements in your report do not appear to support the conclusions reached.
5.
Under the "Further Corrective Action" section, a statement was made that "Repeated periods when the area temperatures limit for containment will be exceeded may occur in the coming period of high makeup water tempera-ture and high ambient air temperatures.
Subsequent Special Reports will be issued at 30 day intervals, if required, in compliance with the Technical Specification requirements."
The report does not contain any indication that corrective actions. to reduce the recurrence of this condition are planned.
Since the environmental conditions for the equipment in the drywell are expected to be less than 150F it is prudent to expect that either these conditions be satisfied or that additional design evaluation be undertaken to satisfy the license requirements.
Pursuant to 10 CFR 50.73.c, you are hereby requested to submit, within 30 days from the date of this letter; a supplement to this Special Report which provides the supplemental information requested above.
If all requested information cannot be provided at that time, please indicate a date by which an additional su'pplemental report can be provided.
Should you have any questions concerning this request, we will be pleased to discuss them with you.
C Sincerely, bcc:
Resident Inspector l
Project Inspector Dennis
. Kirsch, Director docket file Division of Reactor Safety B. Faulkenberry and proinctc G. Cook; J. Martin; M. Smith; J. ZollicoA'er; T; Foley, NRR cc:
G.
D. Bouchey, WPPSS Director, Licensing 5 Assurance C. M. Powers, WNP-2 Plant Manager A. G. Hosier, WNP-2 Licensing Manager G.
C. Sorensen, WNP-2 Regulatory Programs Manager G.
E. Doupe, Esq.
N. S. Reynolds,
- Debevois, Cook, Purcell 5 Reynolds State of Washington 11/I 88 g8 P
n n
G,~R, an AChaffee DKirsch 11/ If 88 1
ll/'f4 88 11/ l$/88 11/$8/88 S
C P
PY S
C R
QU S
S YES NO YES /
NO ES /
.NO YES /
NO Y
/
NO YES DR NO
0 0
r I