November 30, 1988 Docket No. 50-397 Nr. G.
C. Sorensen, ttanager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352 DISTRIBUTION
'RC 5 LPDRs PD5 Reading MVirgilio JLee RBSamworth OGC (f/info only)
EJordan BGrimes ACRS (10)
Dear Nr. Sorensen:
SUBJECT:
PROPOSED At1ENDljENT OF TECHNICAL SPECIFICATION TABLE 3.3.7.1-1 (TAC NO. 71128)
Your application of October 24, 1988 (GO-2-88-221) to amend technical specifications related to radiation monitoring of control room ventilation air focused on removing the requirement for an automated trip of air intakes upon a high radiation signal.
Arguments were presented to support this action.
In the same application you requested several other changes to the affected section for which you provided no support.
We understand the need for removal of the trip requirement from the technical specification and are proceeding with our review of that portion of your application.
We are not able to review the footnote which you proposed to add to page 3/4 3-58 or to review the proposed changes to ACTION statement 70 on page 3/4 3-59 specifying times to restore the monitors to operable status because (1) you failed to indicate any need for these
- changes, (2) you presented no safety analysis, instead arguing that the proposed wording would be consistent with wording used in unrelated sections of the technical specifications, and (3) you did not provide a "no significant hazards consideration analysis" addressing these changes.
If you wish to pursue these changes we will process them as a totally separate licensing action upon receipt of the supporting information.
Sincerely, original signed by cc:
See next page 5 SP/PD5 DR P/D:PD5 RBSamworth:dr GWKnighton 11/go/88 11/q+88 OFFICIAL RECORD COPY Robert B. Samworth, Project Directorate Division of Reactor IV, V and Special Senior Project Manager V
Projects - III, Projects 3312060i20 SSii30 PDR ADOCK 05000397 P
~,ge
~
1 f
S I
I
-1 I
I
~ g 0'
~,
~ r v'8 REG(p
~
Cy~
nO IIA 4~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 30, 1988 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Hr. Sorensen:
SUBJECT:
PROPOSED AMEt<DhENT OF TECHNICAL SPECIFICATION TABLE 3.3.7.1-1 (TAC NO. 71128)
Your application of October 24, 1988 (GO-2-88-221) to amend technical sp'ecifications related to radiation monitoring of control room ventilation air focused on removing the requirement for an automated trip of air intakes upon a high radiation signal.
Arguments were presented to support this action.
In the same application you requested several other changes to the affected section for which you provided no support.
We understand the need for removal of the trip requirement from the technical specification and are proceeding with our review of that portion of your application.
We are not able to review the footnote which you proposed to add to page 3/4 3-58 or to review the proposed changes to ACTIOt< statement 70 on page 3/4 3-59 specifying times to restore the monitors to operable status because (1) you failed to indicate any need for these changes',
(2) you presented no safety analysis, instead arguing that the proposed wording would be consistent with wording used in unrelated sections of the technical specifications, and (3) you did not provide a "no significant hazards consideration analysis" addressing these changes.
If you wish to pursue these changes we will process them as a totally separate licensing action upon receipt of the supporting information.
Sincerely, cc:
See next page Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
4 f
Mr. G.
C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell I% Reynolds 1400 L Street NW Washington, D.C.
20005-3502 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P.. 0.
Box 968, MD 956B Richland, Washington 99352 Hr. A. Lee Oxsen Assistant Hanaging Director for Operations Washington Public Power Supply System P. 0.
Box 968, HD 1023
- Richland, WA 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968,'D 280
- Richland, Washington 99352 Mr. C. H. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box HD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350 Hr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.
Box 69
- Richland, Washington 99352
~
)