Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M80868 + (10:17:44, 8 January 2025)
- ML17289B259 + (10:17:44, 8 January 2025)
- ML17289B256 + (10:17:45, 8 January 2025)
- ML17289B255 + (10:17:46, 8 January 2025)
- ML17289B254 + (10:17:47, 8 January 2025)
- ML17289B253 + (10:17:48, 8 January 2025)
- ML17289B252 + (10:17:49, 8 January 2025)
- 05000397/LER-1991-009-01, Informs NRC That Seismic Monitor Will Remain at Present Location & Required 10 Day Rept Will Be Submitted Each Time Monitor Is Inoperable for More than 30 Days,Per Change Delineated in Ref Special Rept,Ler 91-09 & LER 91-09- + (10:17:50, 8 January 2025)
- GO2-93-260, Forwards Proposed Final Objectives & Limitations for 1993 NRC Graded Exercise,Scheduled for 930223.Objectives & Limitations Constitute Compendium from Various Participating Agencies,Including Util,State & County Agencies & DOE + (10:17:51, 8 January 2025)
- IR 05000397/1993003 + (10:17:53, 8 January 2025)
- ML17289B239 + (10:17:54, 8 January 2025)
- ML17289B238 + (10:17:55, 8 January 2025)
- ML17289B235 + (10:17:55, 8 January 2025)
- GO2-93-060, Application for Amend to License NPF-21,changing TS Section 5.3.2, Control Rod Assemblies to Provide Design Analysis of Duralife 215 Control Rod Intended to Be Used as Replacement Control Rods at Facility.Se Withheld + (10:17:56, 8 January 2025)
- 05000397/LER-1991-019, :on 910716,determined That Failure to Rept Five Periods in Excess of 30 Days of Inoperability of Rv Seismic Monitor in Violation of Ts.Caused by Inadequate Procedures. Procedures Revised + (10:17:59, 8 January 2025)
- GO2-93-051, Provides NRC W/Early Info Re Actions Taken by Util to Address Existence of Noncondensible Gases in Reactor Pressure Vessel Narrow Range Instrumentation.Condition Identified During Review of 930121 Reactor Scram + (10:17:59, 8 January 2025)
- GO2-93-059, Monthly Operating Rept for Feb 1993 for Washington Nuclear Plant 2.W/undated Ltr + (10:18:03, 8 January 2025)
- GO2-93-056, Application for Amend to License NPF-21 Consisting of TS 3/4.3.7.5,accident Monitoring Instrumentation Reactor Bldg post-LOCA Grab Sampler & Effluent Noble Gas Radiation Monitor + (10:18:08, 8 January 2025)
- ML17289B219 + (10:18:08, 8 January 2025)
- GO2-93-057, Submits Annual Rept of Level of Property & Liability Insurance Coverage in Force for Facility,As Evidence of Level of Financial Protection + (10:18:10, 8 January 2025)
- GO2-93-055, Forwards Response to Suppl 1 to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Required Replacement of Two Transmitters Will Be Accomplished During Refueling Outage 8,currently Scheduled for Spring 1993 + (10:18:11, 8 January 2025)
- 05000397/LER-1993-006, :on 930206,manual Reactor Scram Initiated Due to Reactor Recirculation Pump Trip While Operating in Area of Increased Awareness.Caused by Component Design Not within Parameter Limits.Procedures Changed + (10:18:13, 8 January 2025)
- ML17289B207 + (10:18:14, 8 January 2025)
- GO2-93-049, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-40.Corrective Actions:Training Will Be Performed to Ensure That Operations Personnel Participating in Initial Operator License Training Knowledgeable + (10:18:15, 8 January 2025)
- ML17289B205 + (10:18:16, 8 January 2025)
- ML17289B204 + (10:18:17, 8 January 2025)
- ML17289B202 + (10:18:18, 8 January 2025)
- IR 05000397/1992025 + (10:18:19, 8 January 2025)
- ML17289B200 + (10:18:20, 8 January 2025)
- ML17289B198 + (10:18:21, 8 January 2025)
- 05000397/LER-1993-005, :on 930202,inadequate Documentation & Review of Operability Status Results in Unavailability of Wetwell Purge Exhaust Valve.Caused by Technical Inadequacies.Wetwell Valves Adjusted & Returned to Operable Status + (10:18:22, 8 January 2025)
- GO2-93-052, Provides Suppl Response to Utils Ltr Re Violations Noted in Insp Rept 50-397/92-01.All Signoffs Completed & All Required Data Taken & Appropriately Documented + (10:18:23, 8 January 2025)
- ML17289B194 + (10:18:24, 8 January 2025)
- ML17289B193 + (10:18:25, 8 January 2025)
- GO2-93-050, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1992 & Offsite Dose Calculation Manual + (10:18:26, 8 January 2025)
- ML17289B192 + (10:18:26, 8 January 2025)
- ML17289B189 + (10:18:27, 8 January 2025)
- ML17289B187 + (10:18:28, 8 January 2025)
- GO2-93-048, Annual Operating Rept,1992 + (10:18:29, 8 January 2025)
- GO2-93-042, Forwards Fitness for Duty Semiannual Performance Data Rept for 920701-1231 + (10:18:30, 8 January 2025)
- 05000397/LER-1993-004, :on 930127,determined That Two Inadequately Installed Fuses Could Have Caused Loss of RHR Capability During Seismic Event.Caused by Improper Installation of Fuses.Fuse Deficiencies Will Be Evaluated + (10:18:32, 8 January 2025)
- 05000397/LER-1991-006-01, Corrected Forwarding Ltr for LER 91-006-01,superceding Which Contained Incorrect Rept Number + (10:18:34, 8 January 2025)
- ML17289B181 + (10:18:35, 8 January 2025)
- ML17289B180 + (10:18:36, 8 January 2025)
- 05000397/LER-1993-003, :on 930121,determined That Under Certain Ac Electrical Distribution Sys Alignments,Fault Could Result in Unavailability of Both Offsite Power Sources.Caused by Inadequate Sys Analysis.Delay Times Revised + (10:18:37, 8 January 2025)
- GO2-93-030, Responds to NRC 930112 Enforcement Conference Re Violations Noted in Insp Rept 50-397/92-41.Disputes Violation.Rw Personnel Did Not Enter 0 Values But Entered Positively Identified Nuclides & Allowed Computer Codes to Be Used + (10:18:39, 8 January 2025)
- 05000397/LER-1991-006, :on 910412,plant Shutdown Due to Inoperability of Div 1 Edg.Caused by Inadequately Cleaning DG 1 Lube Oil Sys & Oil Changes Recommended by Mfg Inadequate to Reduce Contamination.Addl Reservoir Installed + (10:18:40, 8 January 2025)
- 05000397/LER-1988-008, :on 880318,determined That 11 Plant TS Fire Penetration Seals Discovered Impaired.Caused by Inadequate Control of Fire Seal Penetrations.Maint Work Requests Written to Repair Penetrations + (10:18:43, 8 January 2025)
- 05000397/LER-1988-031, :on 880902,determined That Due to Single Failure CR HVAC Sys Could Operate in Recirculation Mode. Caused by Lack of Communication Between Ae Design Groups.Cr HVAC Recirculation Mode of Operation Analyzed + (10:18:45, 8 January 2025)
- 05000397/LER-1989-006, :on 890316,entry Into TS 3.0.3 Caused by Errors Discovered in Calculation for Dose Received by CR Operators During Loca.Cr Calculation Revised to Assume Zero Percent Mixing of Leakage from Containment + (10:18:48, 8 January 2025)
- GO2-93-027, Monthly Operating Rept for Jan 1993 for WNP-2 + (10:18:50, 8 January 2025)