ML17289B239
| ML17289B239 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/03/1993 |
| From: | Scarano R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Oxsen A WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17289B240 | List: |
| References | |
| EA-92-254, NUDOCS 9303230092 | |
| Download: ML17289B239 (4) | |
See also: IR 05000397/1993003
Text
LUAUl
p
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I
P
ACCESSION NBR:9303230092
DOC.DATE: 93/03/03
NOTARIZED: NO
DOCKET ¹
FACIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397.
AUTH.NAME
AUTHOR AFFILIATION
SCARANO,R.A.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
OXSENPA.L.
Washington Public Power Supply System
SUBJECT:
Forwards
enforcement
conference
rept 50-397/93-03
on
930112.Findings
of insp rept 50-397/92-41
on 921130-1221
discussed.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR /
ENCL /
SIZE:
+ 5
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
RES MORISSEAUPD
EXTERNAL: EG&G/BRYCEPJ.H.
COPIES
RECIPIENT
LTTR ENCL
ID CODE/NAME
1
1
CLIFFORDPJ
2
1
AEOD/DSP/TPAB
1
DEDRO
1
NRR/DRCH/HHFBPT
1
NRR/DRSS/PEPB
1
NRR/PMAS/ILPB2
1
0
IR
1
REG FILE
02
1
RGN
FILE
01
1
'
NRC PDR
1
1
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhk P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
~p,$l REQy
(4
fp0
Cy
n0
IIh
lg
o~~
+w*w+
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIAlANE
WALNUTCREEK, CAUFORNIA94596-5368
MAR 03
)gg3
Docket 50-397
License
EA 92-254
Washington Public Power Supply System
(WPPSS)
P.O.
Box 968
3000 George
Way
Richland,
99352
Attention:
Mr . A. L. Oxsen, Acting Managing Director
SUBJECT:
ENFORCEMENT CONFERENCE
REPORT 50-397/93-03
On January
12,
1993,
members of NRC Region
V management
and staff met with you
and
members of your staff for an open enforcement
conference
at the Region
V
office in Walnut Creek, California.
The topics discussed
are described
in the
enclosed report.
A copy of the handout
presented
by your staff at the meeting
is also enclosed.
During this enforcement
conference,
we discussed
the findings of our November
30 December
21,
1992, radiological controls inspection at Washington Nuclear
Project
2,
as reported in
NRC Inspection
Report 50-397/92-41.
Specific topics
discussed
included adherence
to radiation protection procedures
and the need
for improvements
in processing,
transportation,
and disposal. of radioactive
waste.
In accordance
with 10 CFR 2.790'of the
NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Thank you for your continued cooperation.
Sincerely,
Ross
A. Scarano,
Director
Division of Radiation Safety
and
Safeguards
Enclosure:
Enforcement
Conference
Report 50-397/93-03
9303230092
930303
ADOCK 05000397
Q
PDR,
cc w/enclosure:
J.
V. Parrish,
Assistant
Hanaging Director for Operations
J.
C. Gearhart,
guality Assurance Director
J.
W. Baker,
WNP-2 Plant Hanager
G.
C. Sorensen,
Hanager,
Regulatory
Programs
A.
G. Hosier,
WNP-2 Licensing Hanager
G.
E. Doupe,
Esq.;
State of Washington
Nicholas
S.
Reynolds,
Esq.
Winston L Strawn
bcc w/enclosure:
Docket File
Resident
Inspector
Project Inspector
G.
Cook
R.
Huey
B. Faulkenberry
J. Martin
bcc w/o enclosures:
M. Smith
J. Zollicoffer
LCoblentz
J
D/z/99
R
COPY
E
NO
E
NO
S
TO
S
0 TO
NO
NO
M
u
e/
CO
NO
RHu
y /g /)g
S
C
NO
RScarano
g /~/g
S
CO
YES
NO