ML17289B180

From kanterella
Jump to navigation Jump to search
Notification of Significant Open Meeting W/Util on 930304 to Discuss Recent Plant Events & Performance Issues
ML17289B180
Person / Time
Site: Columbia 
Issue date: 02/23/1993
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9303020065
Download: ML17289B180 (6)


Text

P/7(~

>gp i

iiRE0y' 00 I

cA O~

eo

+**++

UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CAUFQRNIA94596-5368 February 23, 1993 NOTICE OF SIGNIFICANT OPEN MEETING Name of Licensee:

Name of Facility:

Docket Number:

Washington Public Power Supply System Washington Nuclear Project No.

2 (WNP-2) 50-397 Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

March 4,

1993, 7:30 A.H. to Noon (Heeting previously scheduled for 1:00 P.M.)

Supply System Headquarters, 3000 George Washington

Way, Richland, Washington Meeting to Discuss Recent Plant Events and Performance Issues at WNP-2 K. E. Perkins, Director, Division of Reactor Safety and Projects M. J.

Virgilio, Assistant Director for Region IV and V

Reactors, NRR P.

H. Johnson, Chief, Reactor Projects Section 1

J.

W. Clifford, NRR Project Manager R.

C. Barr, Senior Resident Inspector D. L. Proulx, Resident Inspector W. L. Johnson, Resident Inspector A. L. Oxsen, Deputy Managing Director J.

V. Parrish, Assistant Managing Director for Oper ati ons J.

C. Gearhart, Director, guality Assurance J.

W. Baker, WNP-2 Plant Manager R. L. Koenigs,

Manager, Design Engineering G.

C. Sorensen, Regulatory Programs Manager Note:

Attendance at this meeting by individuals other than those listed above should be made known by March 1, 4:00 p.m. via a telephone call to Phil

Johnson, (510) 975-0300.

v 93030200b5 930223 PDR ADOCK 05000397 P

PDR Approved:

K. E. Perkins, Director Division of Reactor Safety and Projects

t

Distributi on:

J. Sniezek, EDO T. Murley, NRR W. Russell, NRR J.

Roe, NRR J. Partlow, NRR Regional Coordinator RV, OEDO M. Virgili o, NRR T. Quay, NRR G. Cook, RV D. Kunihiro, RV NRC Attendees Listed Above CC; A. L. Oxsen, WPPSS G.

C. Sorensen, WPPSS J.

C. Gearhart, WPPSS J.

W. Baker, WPPSS A. G. Hosier, WPPSS Winston 8 Strawn G. E. Doupe, Esq.

State of Washington

t

bcc:

Docket Files Project Inspector H. Smith J.

Bianchi J. Zollicoffer REG V

S anchez 2/z7/93 PJohnson 2Q/93 SRi chards KPerkins 2++93 2/

/93 REQUEST COPY YES NO EST COPY ST COPY'EQUEST COPY ES NO YES NO YES NO TO PDR YES NO

1' l

v

~

j l[

I,

(

l