Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A7561995-04-25025 April 1995 Proposed Tech Specs,Adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A6541995-02-10010 February 1995 Proposed Tech Specs,Modifying Surveillance Acceptance Criteria from 10% to 20% for Individual Jet Pump diffuser- to-lower Plenum Differential Pressure Variations of Individual Jet Pump from Established Patterns ML17291A4811994-10-31031 October 1994 Proposed Tech Spec Relocating Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4781994-10-31031 October 1994 Proposed Tech Spec 3/4.1.3.1, Reactivity Control Sys. ML17291A4451994-10-12012 October 1994 Corrected Proposed TS Bases 3/4.2.6, Power/Flow Instability. ML17291A4221994-09-26026 September 1994 Proposed Tech Specs,Reflecting Use of Siemens Power Corp Staif Code for Stability Analysis,Per Ieb 88-007,Suppl 1 ML17291A3981994-09-18018 September 1994 Proposed TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3191994-08-0808 August 1994 Proposed Tech Specs 4.0.5 Re Guideliness for Inservice Insp & Testing Program ML17291A2171994-07-12012 July 1994 Proposed Tech Specs for Relocation of TS Tables for Instrument Response Time Limits ML17291A2221994-07-0808 July 1994 Proposed TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17291A1561994-06-23023 June 1994 Proposed Tech Specs Re Supporting Hydrostatic Testing 1999-07-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A8301997-03-31031 March 1997 Wppss WNP-2 RPV Surveillance Matls Testing & Analysis. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B1751995-12-31031 December 1995 Reactor Power Uprate Startup Test Rept, for WNP-2. W/951215 Ltr ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. 1999-08-27
[Table view] |
Text
W com~oLLED cope DESIGN FEATURES 5.3 REACTOR CORE FUEL ASSEMBLIES 5.3.1 The reactor core shall contain 764 fuel assemblies with each initial core fuel assembly containing 62 fuel rods and two water rods clad with Zircaloy-2. Each fuel rod shall have a nominal active fuel length of 150 inches.
The initial core loading shall have a maximum average enrichment of 1.90 weight percent U-235. Reload fuel shall be similar in physical design to the initial core loading except that the reload fuel may employ a 9 x 9 array of fuel rods.
Lead Fuel Assembly (LFA) designs with the same material constituents but different geometric configurations are allowed.
CONTROL ROD ASSEMBLIES 5.3.2 T4 consisting of of boron car a
core shall contain 185 control rod asse cruciform ar
+,MlTH
'h u es containing r surrounded by a cruciform s ap 143 inches
~
Kf PIC.l- I MSC.K7 5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:
- a. In accordance with the code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the applicable surveillance requirements,
- b. For a pressure of:
- 1. 1250 psig on the suction side of the recirculation pump.
- 2. 1650 psig from the recirculation pump discharge to the outlet side of the d'.scharge shutoff valve.
- 3. 1550 psig fro-. he discharge shutoff valve to the jet pumps.
- c. For a temperature oE'75 F.
VOLUME 5.4.2 The total water and steam volume of the reactor vessel and recirculation system is approximately 22,539 cubic feet at a nominal steam dome saturation temperature of 545 F.
I MASHIHGTOH NUCLEAR - UNIT 2 Amendment Ho. B4
'P3032204i5 9303i5 i PDR P
ADOCK 0500039'7
, PDR
INSERT A The reactor core shall contain 185 cruciform shaped control rod assemblies. The control materials shall be boron carbide, 84C, and hafnium.
~ ~
GENERAL ELECTRIC COMPANY AFFIDAVIT I, JAMES F. KLAPPROTH, being duly sworn, depose and state as follows:
(1) I am Fuel Licensing Manager, General Electric Company ("GE") and have been delegated the function of reviewing the information described in paragraph 2 which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in the document: GE Duralife 215 Control Rod Safety Evaluation, GENE-778-028-0790, Revision 2, July 1992. This information is delineated by underlined text and by vertical bars marked in the margin adjacent to the specific material.
(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec.
1905, and NRC regulations 10 CFR 9.17(a)(4), 2.790(a)(4), and 2.790(d)(1) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information", and some portions also qualify under the narrower definition of "trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Ener Pro'ect v. Nuclear Re ulato Commission 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Fld>>(DC i. P8).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; C. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of General Electric, its customers, or its suppliers; Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, of potential commercial value to General Electric;
Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld's being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in (6) and (7) following. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.
Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to" industry knowledge. Access to such documents within GE is limited on a "need to know" basis.
The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
The information identified in paragraph (2) is classified as proprietary because it contains design details that allow the nuclear lifetime to be determined. The nuclear lifetime of the control rod is used by the customer for evaluation in competitive bids. The nuclear lifetime is determined from the volume and distribution of absorber material. The inner diameter dimensions of the absorber tubes, as well as the number of absorber tubes and hafnium rods in the Duralife 215 control rod are used to determine the nuclear lifetime and hence considered proprietary to GE. These dimensions are the result of an optimization of mechanical and nuclear requirements. This information is considered to be proprietary for the reasons set forth in paragraph 4.b, above.
Public disclosure of the information sought to be withheld is likely to cause substantial harm to GE's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GE's comprehensive BWR technology base, and its commercial value extends beyond the original development cost.
The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
~
The research, development, engineering, analytical, and NRC review costs comprise a substantial investment of time and money by GE.
The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
The value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GE of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment.
STATE OF CALIFORNIA )
)SS:
COUNTY OF SANTA CLARA )
James F. Klapproth, being duly sworn, deposes and says:
That he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.
~Ca Executed at San Jose, California, this~ day of Q~~, 1+3 o+
James F. Klapproth General Electric Company Subscribed and sworn before me this+ day of 19+3 OFFICIALSEAL Notary P blic, State of California lAARYI. KENDALL Nosy Public-California SANTA ClARA COUNTY r
My Comm. Exp. Mar. 26, 1993
GE iVucfear Energy GENE-7784284790 Rt:vision 2 July 1992 GE Ouralife 216 Control Rod Safety Evaluation
ANO SUP FPAC PAGES AVAIL NET CODES PDR CF AA Rh oDKT TASK F2 DESCRIPTION:
~p PDR CF AA RPDKT TASK F2 DESCRIPTION:
PDR CF AA l4$ DKT TASK F2 DESCRIPTION:
PDR CF AA IS DKT TASK F2 DESCRIPTION:
PDR CF AA
~ 4 DKT TASK F2 DESCRIPTION:
AA If'KT TASK F2 IKIIII ggggg RESCRIPTION'ESCRIPTION PDR CF AA DKT TASK F2 PDR CF - AA DKT TASK F2 DESCRIPTION:
Pg PDR CF AA I DKT TASK F2 DESCRIPTION:
PRIMARY FILE LOCATION/LEVEL DSB $:
FCEN F1 F2 NOTES/SPECIAL INSTRUCTIONS gQR EXER QC DDC ~e Ace>
Sl +
Cy Generate New Label iienefa e i ew RiD EAR DOCUMENTS SYSTEM I
>>'heeL'ef NU o $"
Encl Contains Prop Info i R CF PROP ~
M 0 'e e 4 e Encl Contains Foldout Paae~ Do N R ilm RIDS:
I
',g *If l5+h,'RS+Ig r
J ggP'g ppg ]pal'QS-Wg'ER+]pip Pagpsgspgg g@~ge~~pg~p~
L C