- ML17290B096 + (10:03:48, 8 January 2025)
- ML17290B092 + (10:03:49, 8 January 2025)
- ML17290B091 + (10:03:50, 8 January 2025)
- ML17290B090 + (10:03:51, 8 January 2025)
- 05000397/LER-1994-004, :on 940307,two in-series Containment Isolation Valves MS-V-16 & MS-V-19 Inoperable Since 931217.Caused by Ambiguous Wording in Dec 1993 Operability Assessment. Procedures Modified & Training Provided + (10:03:52, 8 January 2025)
- GO2-94-077, Monthly Operating Rept for Mar 1994 for WNP-2 + (10:03:53, 8 January 2025)
- GO2-94-068, Provides Addl Info in Support of 940208 Request to Change Stroke Time of RCIC-V-8 as Shown in TS Table 3.6.3-1 + (10:03:54, 8 January 2025)
- 05000397/LER-1994-001, :on 931230,untested Fuel Transfer to EDG Fuel Oil Storage Tanks Occurred.Caused by Inadequate Design Change Documentation & Operating Procedure.Procedures Revised + (10:03:56, 8 January 2025)
- ML17290B085 + (10:03:57, 8 January 2025)
- ML17290B083 + (10:03:58, 8 January 2025)
- GO2-94-073, Informs of Change of Address for Licensed Operator + (10:03:59, 8 January 2025)
- GO2-94-072, Reports Property & Liability Insurance Coverage for WNP-2, Per 10CFR50.54(w)(3) + (10:04:00, 8 January 2025)
- ML17290B079 + (10:04:01, 8 January 2025)
- GO2-94-069, Requests Inclusion of Addl Administrative Change in Util Request for Amend to TS 3/4.6.1.8 for Containment Purge Supply & Exhaust Valves.Forwards Change to TS 3/4.6.1.2 Not Submitted in Original Submittal + (10:04:02, 8 January 2025)
- ML17290B075 + (10:04:03, 8 January 2025)
- GO2-94-070, Requests Exemption from Provision of 10CFR50 Appendix J in Order to Allow Type C Testing of Containment Purge Supply & Exhaust Valves W/Metallic Seats + (10:04:04, 8 January 2025)
- GO2-94-063, Requests Withdrawal of Items 2 Through 5 & Change of Setpoint Values for Existing NF400 Values in Item 1 of 930729 Application for Amend to License NPF-21 Re Refueling Platform Load Limits + (10:04:05, 8 January 2025)
- ML17290B070 + (10:04:05, 8 January 2025)
- ML17290B066 + (10:04:07, 8 January 2025)
- ML17290B064 + (10:04:09, 8 January 2025)
- ML17290B063 + (10:04:10, 8 January 2025)
- ML17290B061 + (10:04:11, 8 January 2025)
- ML17290B060 + (10:04:12, 8 January 2025)
- ML17290B058 + (10:04:13, 8 January 2025)
- IR 05000397/1994010 + (10:04:16, 8 January 2025)
- ML17290B054 + (10:04:17, 8 January 2025)
- IR 05000397/1994004 + (10:04:39, 8 January 2025)
- ML17290B052 + (10:04:40, 8 January 2025)
- ML17290B049 + (10:04:41, 8 January 2025)
- ML17290B048 + (10:04:42, 8 January 2025)
- 05000397/LER-1994-003, :on 940222,inadequate Motor Operator Capability RCIC Sys Steam Supply Bypass Valve Failed to Automatically Close Following Helb.Caused by Inaccurate Vendor Info.Rcic Valve Deactivated in Normal Position + (10:04:44, 8 January 2025)
- ML17290B046 + (10:04:45, 8 January 2025)
- ML17290B040 + (10:04:46, 8 January 2025)
- GO2-94-062, Forwards Suppl 1 to ISI Summary Rept for Refueling Outage RF93A 920719-930621 + (10:04:47, 8 January 2025)
- 05000397/LER-1993-010-07, Forwards LER 93-010-07 Re Two Addl Reportable Findings of TS Surveillance Improvement Project.Rept Provides Updated Status of Corrective Actions + (10:04:49, 8 January 2025)
- GO2-94-060, Provides Response to Request for Addl Info Re Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis + (10:04:51, 8 January 2025)
- GO2-94-059, Forwards Addl Info to Assist NRC in Review & Approval of 930729 Request for TS Change Allowing Replacement of Facility Refueling Mast + (10:04:53, 8 January 2025)
- GO2-94-058, Responds to Violations Noted in Insp Rept 50-397/93-50. Corrective Actions:Memo Issued to Employees Covering Lessons Learned by 940413 & Gas Cylinder Restrained Until Job Completed & Returned to Svc + (10:04:54, 8 January 2025)
- GO2-94-055, Notifies of Completion of Corrective Action Committed to in 931129 Response to NOV Resulting from Insp Rept 50-397/93-23 to Revise MOV Program Plan by 940115.Plan Approved on 940217 & Provided to NRC Inspector During Insp 50-397/94-10 + (10:04:56, 8 January 2025)
- IR 05000397/1994008 + (10:04:59, 8 January 2025)
- GO2-94-057, Monthly Operating Rept for Feb 1994 for WNP-2 + (10:05:01, 8 January 2025)
- ML17290B017 + (10:05:01, 8 January 2025)
- ML17290B014 + (10:05:03, 8 January 2025)
- ML17290B013 + (10:05:04, 8 January 2025)
- IR 05000397/1993045 + (10:05:05, 8 January 2025)
- ML17290B011 + (10:05:06, 8 January 2025)
- ML17290B009 + (10:05:07, 8 January 2025)
- GO2-94-048, 1993 Annual Environ Operating Rept, Including Summary of Effluent Data Reported to State of Washington on Monthly Discharge Monitoring Reports.No Nonradiological Repts within Context of EPP Section 5.4.2 Required for 1993 + (10:05:10, 8 January 2025)
- ML17290B001 + (10:05:10, 8 January 2025)
- GO2-94-049, Provides Update & Addl Detail Re Plans to Perform Stress Improvement of Nozzle to safe-end Welds During Refueling Outage R-9 in Spring of 1994,as Described in 921016 Response to GL 88-01 & 930326 Submittal Re IGSCC Insps + (10:05:12, 8 January 2025)
- ML17290A997 + (10:05:13, 8 January 2025)