ML17290B092
| ML17290B092 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/11/1994 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9404150082 | |
| Download: ML17290B092 (2) | |
Text
~gR REGS('Ip0 Cy qO
++*+"
1 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 APR l
I 19M Name of Licensee:
Name of Facility:
Docket No.:
NOTICE OF LICENSEE MEETING Washington Public Power Supply System Washington Nuclear Project 2
(WNP-2) 50-397 Date and Time of Meeting:
April 22, 1994 8 a.m. to 10:30 a.m.
.Location of Meeting:
Region IV office, Ai lington, Texas Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
Management meeting to discuss supply system organizations and key issues L. Callan, Regional Administrator J.
Montgomery, Deputy Regional Administrator A. Beach, Director, Division of Reactor Projects T. Gwynn, Director, Division of Reactor Safety S. Collins, Director, Division of Radiation Safety and Safeguards K ~ Perkins,
- Director, Region. IV Field Office D. Kirsch, Chief, Project Branch E
G. Johnston, Senior Project Inspector W. Counsil, Hanaging Director J. Parrish, Assistant Managing Director, Operations J. Swailes, WNP-2 Plant Manager M. Flasch, Director, Engineering J. Gearhart, Director, guality Assurance P.
- Bemis, Manager, Regulatory Programs NOTE:
(1)
Attendance by other NRC personnel at this meeting should be made
'nown by COB on April 18 via telephone call to Dennis Kirsch (510/975-0290).
(2)
This meeting is open to attendance by members of the general public.
Approved By:
eac erector Division of Reactor Projects 9404i50082 9404ii eDR ADOCK 05000397 e
eDR
Washington Public Power Supply System Distribution:
DMB (IE 45)
L. Milhoan, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
W. T. Russell, D/NRR (MS 12D1)
A. C. Thadani, ADT/NRR (MS 12G18)
L. A. Reyes, ADP/NRR (MS 12D9)
J.
Lieberman, D/OE (MS 7H5)
L. J. Chandler, OGC (MS 15B18)
J. Clifford, Project Manager, NRR (MS 13E16)
OEDO RIV Coordinator (MS 17G21)
G.
F. Sanborn, EO C. A. Hackney, RSLO J. Gilliland, PAO, RIV G. Cook, WCFO (E-mail only to GNC)
D. Kunihiro, WCFO (E-mail only to DMKl)
NRC Attendees (E-mail only)
RA Secretary DRA Secretary Carol Gordon (E-mail also)
Division Secretary (DRP,
- DRS, DRSS)
L. S. Ousley RIV Fi 1 e Senior Resident Inspector Energy Facility Site Evaluation Council ATTN:
Warren Bishop, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:
H. K. Kook, WNP-2 Licensing Manager P.O.
Box 968, MD PE20
- Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190
- Prosser, Washington 99350-0190 Winston 5 Strawn ATTN:
M. H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 RIV:C:DRP/E*
PAO*
RSLO*
DFKirsch;df JTGilliland CAHackney 4/
/94 4/11/94 4/11/94 "previously concurred D:DRP*
ABBeach 4/11/94