0
(~
FORD I
REGULATORY INFORMATION DISTRlBUTION SYSTEM (RIDS)
ACCESSiON NBR:9403310062
DOC.DATE: 94/03/18
NOTARIZED: NO
DOCKET ¹
"ACIL:50-397 WPPSS Nuclear Project,
Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
VANDENBURGH,C.P
Region
5 (Post
820201)
RECZP.NAME
RECIPIENT AFFILIATION
ARRISHgJ.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/94-04
on 940111-0221
& notice of
violation.
DlSTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
ITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
'R
RECIPIENT
ZD CODE/NAME
PDV PD
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDSl
R S/H."B
. iERNAL: EG&G/BRYCEgJ.H.
NSZC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
EG FIJE
02
GN5
FILE
Ol
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
E
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhk Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
~ gp'8 RKgltt
~o
Cy I) ~
I
oo
Yg
~
(4
+~*~4
Docket:
50-397
License:
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CALIFORNIA94596-5368
March 18,
1994
Washington Public Power Supply System
ATTN:
Hr. J.
V. Parrish
Assistant
Managing Director for Operationq
P.
O.
Box 968
Richland,
99352,
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-397/94-04)
This refers to the inspection
conducted
by Hr.
R.
C. Barr,
and the inspectors
identified in the enclosed report, of this office on January ll through
February
21,
1994.
This inspection
included
a review of activities authorized
for your Washington Nuclear Project
No. 2.
At the conclusion of the
inspection,
the findings were discussed
with you and those
members of your
staff identified in the enclosed report.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
Attachment
2 to the enclosed report also
addresses
the management
meeting held in our office on February 4,
1994.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
These violations concerned
your failure (1) to implement
and maintain
an alarm response
procedure prescribing
adequate
immediate
and
long-range actions,
(2) to declare
Average
Power
Range Monitor (APRM)
Channel
when performing maintenance
that rendered it incapable of
performing its safety functions,
and (3) to perform required time response
testing for certain relays
and contacts
in low pressure
emergency
core cooling
system actuation circuitry.
The inspection
also noted
a non-cited, violation
(NCV) involving the failure to test actuation logic relays
and contacts for
certain safety-related
pumps
and valves.
The inspection
also identified several
examples of weaknesses
in operator
alertness,
shift turnover,
and the control of work.
We are concerned
about
these
weaknesses
because
they indicate
a need for continued strengthening
of
management
oversight to sustain
performance
improvements
in these
areas.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
9403310062
940318
ADOCK 05000397
Q
4
-2-
Washington Public Power Supply System
inspection,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In view of
the proactive actions taken
by your staff to identify and correct violation
C
of the enclosed
Notice,
a written reply for this violation is not required.
In accordance
with 10 CFR 2.790(a) of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
The response
directed
by this letter,and
the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork Reduction Act of 1980,
Pub.
L.96-511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
C. A. VanDenburgh
Acting Deputy Director
Division of Reactor Safety
and Projects
Enclosures:
l.
Appendix A Notice of Violation
2.
Appendix
B - NRC Inspection
Report 50-397/94-04
cc w/enclosures:
P.
R. Bemis,
Manager,
Regulatory
Programs,
Chairman,
Benton County Board of Commissioners
M. H. Phillips, Esq.,
Winston 5 Strawn
Warren A. Bishop,
Energy Facility Site Evaluation Council
J.
W. Swailes,
WNP-2 Plant Manager,
H.
E. Kook, Jr., Licensing Manager,
G.
E. Doupe,
Esq.,
-3-
bcc w/copy of enclosures
I and 2:
Docket File
K. Perkins
Resident
Inspector
-J. Clifford, NRR
Project Inspector
S. Richards
R.
Huey (copy of NOV and Paragraph
2.3
P. Johnson
D. Kirsch
G.
Cook
bcc w/enclosure I only:
N. Smith
J. Bianchi
D. Clevenger
REGION V
to
NOED File)
n
0 o
orandy
" DKir ch
3/> /94
3/f /94
NO
YES
NO
NO
NO
YES
NO
PJh
0
3/LR
4
RHue
3/Q'/94
CVanDenb
3/iC/94
NO
NO
YE
NO
YES
NO
YE
C
NO
File Location:
6 Xld>PPPSXAZX WAR)-Q, PwL.