Forwards Insp Rept 50-397/94-02 on 940110-28 & Notice of Violation
ML17290B061
Person / Time
Site: Columbia 
Issue date: 03/15/1994
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290B062 List:
References
NUDOCS 9403310111
Download: ML17290B061 (6)


See also: IR 05000397/1994002

Text

FORD 1

REGULAT

INFORMATION DISTRIBUTION

STEM (RIDS)

ACCESSION NBR:9403310111

DOC.DATE: 94/03/15

NOTARIZED: NO

CZL:50-397

WPPSS Nuclear Project, Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

ICHARDS,S.A.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/94-02

on 940110-28

& notice of

violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCL

SIZE: 3

TI LE: General

(50 Dkt)-Insp Rept/Notice of Violation

esponse

DOCKET

05000397

R

NOTES:

RECZPIENT

ID CODE/NAME

PDV PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

CGC/HDS1

RES/H

B

ERNAL: EGGG/BRYCE,J.H.

NSZC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE DIR

ILE

RSN5

.,PI

02

01

NRC PDR

RECIPIENT

ID CODE/NAME

CLIFFORDPJ

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

S

F

0

R

D

D

NOTE TO ALL"RIDS" RECIPIENTS

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

f'

,C',I R REGll

c,"

4

0

!gal::i

+>>*+>>

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

Docket No.

50-397

License

No. NPF-21

Harch

15,

1994

Washington Public Power Supply System

ATTN:

Hr. J.

V. Parrish

Assistant

Hanaging Director for Operations

P. 0.

Box 968

Richland,

Washington

99352

SUBJECT:

NOTICE OF VIOLATION (NRC

INSPECTION

REPORT

NO. 50-397/94-02)

This refers to a special

team inspection

conducted

by Hr.

P. Narbut

and

a team

of NRC and contractor personnel

from January

10-14

and January

24-28,

1994, of

activities authorized

by

NRC Operating

License

No. NPF-21,

and to the

discussions

of findings held by the inspectors with you and other members of

the Supply System staff at the conclusion of the inspection.

Additionally,

the results of the inspection

conducted

by Hr. D. Kirsch from November

29

through

December

3 and December

13-17,

1993,

are included in the enclosed

inspection report.

The inspection

was

an examination of the effectiveness

of engineering

and

technical

support.

Areas

examined during this inspection

are described

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspectors.

We noted that you have recently

implemented

several

important improvement

initiatives which appear to be having positive results.

Examples of these

initiatives include your engineering

backlog reduction, your temporary

modification reduction,

and the improved interface

between

engineering

and

other organizations.

Although it is too early to assess

the long term

effectiveness

of your engineering initiatives,

we are encouraged

by your

efforts thus far.

The team also noted that your decision to install

new

metallic-seated

containment

purge

and supply isolation valves,

in order to end

a longstanding

problem with leaks in the rubber-seated

valves,

was

commendable.

Although the team found that engineering

support of plant operations

has

generally improved,

a recent

issue deviates

from that conclusion.

Engineering

appears

to not have

been timely in their review of fuel loading options for

cycle 10.

This issue is still under

NRC review and will be addressed

in a

later inspection report.

The team noted two significant unresolved

items

which warrant additional

management

attention.

The unresolved

items involve:

(1) the adequacy of your proposed modification and the

10 CFR 50.59 safety

evaluation for the

BWR level instrumentation backfill system,

and (2) the

9403310iii 9403i5

PDR

ADOCK 05000397

9

PDR

P ~

Additionally, based

on the results of this inspection, it appears

that

one of

your activities was not conducted

in full compliance with NRC requirements,

as

set forth in the enclosed

Notice of Violation (Notice).

The violation

involved the failure to periodically verify the position of manual

containment

isolation valves in accordance

with technical specification requirements.

The

involved valves were

115 manual

bypass

valves for the containment isolation

excess

flow check valves.

You are required to respond to this Tetter and should. follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and

any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosures,

and

your response will be placed in the

NRC Public Document

Room.

The response

directed

by this letter

and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Hanagement

and Budget

as

required

by the Paperwork Reduction Act of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-397/94-02

S. A. Richards,

Acting Director

Division of Reactor Safety

and Projects

cc w/enclosures:

P.

Bemis,

Hanager,

Regulatory

Programs,

WPPSS

Chairman,

Benton County Board of Commissioners

H. H. Phillips, Esq.,

Winston

5, Strawn

Warren A. Bishop,

Energy Facility Site Evaluation Council

J.

W. Swailes,

WNP-2 Plant Manager,

WPPSS

H.

E. Cook, Licensing Hanager,

WPPSS

G.

E.

Doupe,

Esq.,

WPPSS

bcc w/copy of enclosures

Docket File

K. Perkins

Resident

Inspector

J. Clifford, NRR

Project Inspector

M. Ang

G.

Cook

E. Imbro,

NRR

R. Cooper,

RI

E. Merschoff, RII

E.

Greenman,

RIII

A. Beach,

RIV

H. Kister

S. Traiforos

cc (electronically):

D. Sullivan,

ILPB,

NRR

bcc w/enclosure

I oily:

M. Smith

J. Bianchi

I and 2:

D. Clevenger

REGION

C Myers

2- /28~/9

A MacDougal

6/

1 /94

agner

0d

g /~/94

Narbut

Z /Z9/94

0 Kirsc

y/

4

YES

NO

NO

0

S

S

NO

YES

NO

YES

P J

$ /

9

R Huey

C Van

urgh

'Z/25'>4

j /$ />4

6 IZ(GHQ

5

~lis ~q

CO

P

YES

NO

YES

NO

YES

NO

S

ES

NO

CS

YES

NO

File Location:

g i hhr &P RPT'SXW~X~ <-~+-o2.. P<L

3000,