Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-96-154, Responds to RAI Re Insp Rept 50-397/96-01.Plant Procedure PPM 1.3.42 Revised to Clarify Trouble Shooting Guidance & Restrictions + (09:26:20, 8 January 2025)
- ML17292A402 + (09:26:20, 8 January 2025)
- ML17292A396 + (09:26:22, 8 January 2025)
- TAC:M94580 + (09:26:23, 8 January 2025)
- ML17292A394 + (09:26:23, 8 January 2025)
- ML17292A393 + (09:26:24, 8 January 2025)
- ML17292A392 + (09:26:25, 8 January 2025)
- GO2-96-149, Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996 + (09:26:26, 8 January 2025)
- GO2-96-151, Responds to Spent Fuel Pool Survey Commitment.Informs That Fuel Movement Delay Time Assumptions Were Added as Prerequisites to Appropriate Plant Procedure on 960413 + (09:26:27, 8 January 2025)
- GO2-96-148, Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed + (09:26:29, 8 January 2025)
- ML17292A384 + (09:26:30, 8 January 2025)
- IR 05000397/1996002 + (09:26:31, 8 January 2025)
- ML17292A382 + (09:26:33, 8 January 2025)
- 05000397/LER-1996-004, :on 960624,plant Was Manually Scrammed by Control Room Personnel Due to Reactor Water Level Transient Experienced During Testing of Digital Feedwater Sys.Caused by Programming Error.Sys Was Corrected + (09:26:34, 8 January 2025)
- 05000397/LER-1996-005, :on 960624,determined Missed Surveillance Test Re Channel Check of Average Power Range Monitor.Caused by Inadequate Procedures.Revised Surveillance Procedure Re When APRM Checks Must Be Performed + (09:26:36, 8 January 2025)
- GO2-96-141, Forwards Response to RAI Re NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment + (09:26:36, 8 January 2025)
- IR 05000397/1996008 + (09:26:43, 8 January 2025)
- ML17292A373 + (09:26:44, 8 January 2025)
- ML17292A372 + (09:26:45, 8 January 2025)
- ML17292A371 + (09:26:46, 8 January 2025)
- ML17292A369 + (09:26:47, 8 January 2025)
- ML17292A368 + (09:26:47, 8 January 2025)
- IR 05000397/1996007 + (09:26:51, 8 January 2025)
- ML17292A365 + (09:26:52, 8 January 2025)
- 05000397/LER-1996-003, :on 960615,required Surveillance Test Not Performed When Required by TS 3.4.1.3.Caused by Inadequate Procedures.Implementing Surveillance Procedure & Reactor Plant Startup Procedures Revised + (09:26:53, 8 January 2025)
- GO2-96-140, Provides Final Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (09:26:54, 8 January 2025)
- GO2-96-137, Monthly Operating Rept for June 1996 for WNP-2 + (09:27:00, 8 January 2025)
- ML17292A362 + (09:27:00, 8 January 2025)
- ML17292A357 + (09:27:03, 8 January 2025)
- ML17292A356 + (09:27:04, 8 January 2025)
- GO2-96-132, Requests Amend to Ts,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of Nhsc or Environ Assessment Provided in Rev a + (09:27:06, 8 January 2025)
- ML17292A353 + (09:27:08, 8 January 2025)
- ML17292A351 + (09:27:10, 8 January 2025)
- ML17292A342 + (09:27:11, 8 January 2025)
- ML17292A339 + (09:27:12, 8 January 2025)
- ML17292A338 + (09:27:13, 8 January 2025)
- 05000397/LER-1996-002, :on 960504,critical Bus SM-8 Lost Power When Supply Breaker 3-8 Tripped.Caused by Personnel Error. Operators Counselled & Procedures Revised + (09:27:15, 8 January 2025)
- ML17292A335 + (09:27:16, 8 January 2025)
- GO2-96-121, Forwards Emergency Preparedness Exercise Objectives & Limitations for Exercise to Be Conducted 960925 + (09:27:17, 8 January 2025)
- ML17292A332 + (09:27:19, 8 January 2025)
- ML17292A331 + (09:27:20, 8 January 2025)
- IR 05000397/1996006 + (09:27:26, 8 January 2025)
- ML17292A325 + (09:27:28, 8 January 2025)
- ML17292A323 + (09:27:29, 8 January 2025)
- ML17292A322 + (09:27:30, 8 January 2025)
- GO2-96-118, Monthly Operating Rept for May 1996 for WNP-2 + (09:27:31, 8 January 2025)
- ML17292A321 + (09:27:31, 8 January 2025)
- GO2-96-116, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/96-03.Util Denies Violation a & No Corrective Actions Taken + (09:27:33, 8 January 2025)
- ML17292A316 + (09:27:35, 8 January 2025)
- ML17292A315 + (09:27:36, 8 January 2025)
- GO2-96-115, Forwards Rev 0 to WNP-2 Cycle 12 COLR, Per Requirements of TS 6.9.3.4.COLR Reviewed & Approved by WNP-2 Plant Operating Committee + (09:27:37, 8 January 2025)
- ML17292A311 + (09:27:37, 8 January 2025)