ML17292A394

From kanterella
Jump to navigation Jump to search

Forwards SE Accepting 941227 & 950512 Requests for Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements for WP-2 Second 10-yr ISI Program Plan Re Snubber Insps
ML17292A394
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/01/1996
From: Bateman W
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A395 List:
References
TAC-M94580, NUDOCS 9608070303
Download: ML17292A394 (4)


Text

August 1, 1996 Hr. J.

V. Parri sh (Hail Drop 1023)

Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O.

Box 968 Richland Washin ton 99352-0968 g

SUBJECT:

INSERVICE INSPECTION PROGRAM,RELIEF RE(UEST FOR SNUBBER INSPECTIONS FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

NUCLEAR PROJECT NO.

2 (WNP-2)

(TAC NO. M94580)

Dear Hr. Parrish:

By letter dated December 27,

1994, as supplemented by letter 'dated Hay 12,
1995, WPPSS submitted a request for relief (Relief Request 2ISI-ll Revision 0, dated December 1994) from the ASHE Boiler and Pressure Vessel
Code,Section XI, requirements for the WNP-2 Second Ten Year Interval Inservice Inspection (ISI) Program Plan, related to snubber inspections.

The staff has completed its review of your request.

Our safety evaluation is provided in the enclosure.

The staff has determined that the pr'oposed alternative inspection provides an acceptable level of quality and safety j~"i~

and authorizes its use pursuant to 10 CFR 50.55a(a)(3)(i).

If you have any questions, please contact the project manager, Timothy G.

Colburn at (301) 415-1341.

Sincerely, Original Signed By William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl:

See next page DISTRIBUTION:

CDocket Fi.l.e PUBLIC JRoe WBateman TColburn EPeyton RWessman GHill (2)

ACRS, TWFN PDIV-2 Reading
OGC, 015B18
KPerkins, WCFO
JDyer, RIV
HWong, WCFO FGrubelich JHitchell, EDO DOCUMENT NAME: WNP94580.REL
  • See revious concurrence OFC NAME PDIV-2 LA EPey n

PDIV-2 8 0Gc TColburn:ye EHoller*

PDIV-2 D

WBatema DATE 7i 96 7 $o96 7 23/96

/

96 OFFICIAL RECORD COPY

'F608070303 960802 PDR ADQCK 05000397 8

PDR

1I l

(

II f

l

Mr. J.

V. Parrish August 1, 1996 cc w/encl:

Hr. Greg 0. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352-0968 Hr. Al E. Mouncer (Hail Drop 396)

Chief Counsel Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.

Box 43172 Olympia, Washington 98504-3172 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Mr. Paul R.

Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower

& Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

Prosser, Washington 99350-0190 Mr. R.

C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69

Richland, Washington 99352-0968 H. H. Philips, Jr.,

Esq.

Winston

& Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Hr. Rodney L. Webring (Hail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 Hs.

Lourdes C. Fernandez (Hail Drop PE20)

Manager, Licensing Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352

J