ML17292A373

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/96-08 on 960512-0622.No Violations Noted
ML17292A373
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/23/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A374 List:
References
NUDOCS 9607250201
Download: ML17292A373 (6)


See also: IR 05000397/1996008

Text

c

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9607250201

DOC.DATE: 96/07/23

NOTARIZED: NO

DOCKET

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

0500039

UTH.NAME

AUTHOR AFFILIATION

~

~

~

~

r.R,J.E.

Region

4 (Post

820 '01)

ECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/96-08

on 960512-0622.No violations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

!

ENCL [

SIZE:

'ITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E

INTERNAL:

REClPIENT

ID CODE/NAME

PD4-2

PD

ACRS

AEONSf~-

ZLE CENTER

NR

RC

HHFB

NRR/DRPM/PERB

OE DIR

RGN4

r ILE

Ol

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1,1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

COLBURN,T

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL: LZTCO BRYCEPJ

H

ttP

I

NRC PDR

1

1

1

NOAC

1

1

D

0

U

E

N

NOTE TO ALL "RIDS" RECIPIENTS

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

f

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

)

~

E

ri

~

0

I )'-

O~ +~

+ y**+

ulvt I CIJ 5 I HI tb

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

JUL 23 t996

J.

V. Parrish,

Chief Executive Officer

Washington Public Power Supply System

3000 George

Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION REPORT 50-397/96-08

Dear Hr. Parrish:

On June

22,

1996,

the

NRC completed

an inspection at your Washington Nuclear

Project-2 facility.

The enclosed

report presents

the results of that

inspection.

During the 6-week period covered

by this inspection period,

outage activities

at the Washington

Nuclear Project-2 facility appeared

to be effectively

controlled.

The reactor

was refueled safely

and for the second

consecutive

year

no fuel mispositioning errors occurred,

which was particularly noteworthy

since this year', refueling involved

a full core offload.

Shift supervision

effectively controlled the reactor startup

from Refueling Outage Rll.

We did

note,

however, that due to weakness

in planning

and utilization of resources,

overtime

usage

during the last

2 weeks of the outage

was considered

high for

the instrument

and controls craftsmen.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Sincerely,

Docket:

50-397

License:

NPF-21

J.

E. Dyer, Director

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

50-397/96-08

cc w/enclosures:

Frederick

S. Adair, Chairman

Energy Facility Site Evaluation Council

P.O.

Box 43172

Olympia, Washington

98504-3172

9b0725020i

9b0723

PDR

ADOCK 05000397

8

PDR

~ 4

J.

V. Parrish

~

~

Chairman

Benton County Board of Commissioners

P.O.

Box 190

Prosser,

Washington

99350-0190

Mr. Paul

R.

Bemis (Hail Drop PE20)

Vice President,

Nuclear Operations

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Mr. Rodney L. Webring (Hail Drop PE08)

Vice President,

Operations

Support/PIO

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr. Greg 0. Smith (Hail Drop 927M)

WNP-2 Plant General

Manager

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr, David A. Swank (Mail Drop PE20)

Manager,

Regulatory Affairs

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr. Al

ED Mouncer (Hail Drop 396)

Chief Counsel

Washington Public Power Supply System

PRO.

Box 968

Richland,

Washington

99352-0968

Ms. Lourdes

C.

Fernandez

(Hail Drop PE20)

Manager,

Licensing

Washington Public

Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Hr. Halcolm H. Phillips, Jr.,

Esq.

Winston 5 Strawn

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

0

JUL 23 I996

E-Hail report to D. Nelson

(DJN)

~

E-Mail report to. NRR Event Tracking System

(IPAS)

E-Hail report to Michael Davis

(MJD1)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

HIS System

RIV File

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R: It WN2iWN608RP. RCB

To receive copy of docuneet, indicate in box "C

~ Copy without enclosures

E

~ Copy with enclosures "ri ~ No copy

RIV:SR I/DRP: E

Barr

07/Q/96

<5'lA t5

C:DRP/E

JWon

07/25/96

D:DRP

JEDyer

07/z5/96

0

CO