Requests Confirmation of Commitment Re Modifying Plant Refueling Procedures to Document Fuel Movement Delay Time Assumptions in Spent Fuel Pool Analysis
ML17292A353
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/28/1996
From: Colburn T
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
TAC-M88094, NUDOCS 9607050061
Download: ML17292A353 (3)


Text

June 28, 1996 Hr. J.

V. Parrish Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O.

Box 968 (Hail Drop 1023)

Richland, Washington 99352-0968

SUBJECT:

SPENT FUEL SURVEY COMMITMENTS FOR WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

NUCLEAR PLANT NO.

2 (WNP-2)

(TAC NO. H88094)

Dear Hr. Parrish:

On March 4-8, 1996, Hr. James Clifford visited the WNP-2 plant in Richland, Washington to conduct a survey on the spent fuel practices and spent fuel pool cooling system design and current licensing basis for WNP-2.

During the survey, your staff made a statement that WPPSS would be modifying the appropriate plant refueling procedures to document the fuel movement delay time assumptions in the spent fuel pool cooling analysis as plant operating restrictions.

However, a formal procedure change request had not yet been issued by the end of the on-site portion of the audit.

Accordingly, I am requesting that you provide a letter within 30 days of receipt of this letter that confirms this commitment and indicates the projected completion date for this action.

This commitment will then be included in a future inspection report and will be tracked by the regional office until completion.

If you have any questions concerning these

items, please contact me on 301-415-1341.

Sincerely, Original Signed By Timothy G. Colburn, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects - III)IV Office of Nuclear Reactor Regulation Docket No. 50-397 cc:

See next page Q~JO3 DOCUMENT NAME: WNPSFP.LT2 DISTRIBUTION:

'ocket File i PUBLIC JRoe EAdensam WBateman TColburn EPeyton CPoslusny JStolz

ACRS, TWFN PDIV-2 Reading
OGC, 015B18
KPerkins, WCFO
JDyer, RIV
HWong, WCFO JMitchell JShea OFC PDIV-2 PDIV-2~

NAME E~oy n

TColburn DATE 96 6 cd/96 OFFICIAL RECORD COPY 96070500bl 960628 PDR ADQCK 05000397 P

PDR

~

P f

I I,

L' 0

Hr. J.

V. Parrish Dune 28, 1996 cc w/encl:

Mr. Greg 0. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352-0968 Mr. Al E. Mouncer (Hail Drop 396)

Chief Counsel Washington Public Power Supply System P.O.

Box 968

, Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.

Box 43172 Olympia, Washington 98504-3172 Hr. David A. Swank (Hail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Mr. Paul R.

Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower E Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

,Prosser, Washington 99350-0190 Mr. R.

C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69

Richland, Washington 99352-0968 H. H. Philips, Jr.,

Esq.

Winston

& Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Hr. Rodney L. Webring (Hail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 Hs.

Lourdes C. Fernandez (Hail Drop PE20)

Manager, Licensing Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352