ML17292A393
| ML17292A393 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/02/1996 |
| From: | Colburn T NRC (Affiliation Not Assigned) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| TAC-M94226, NUDOCS 9608070211 | |
| Download: ML17292A393 (5) | |
Text
pe REC0 (I
P
+
~s 0
A.o0
~O
+>>*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 2055&0001 August 2, 1996 Mr. J.
V. Parrish Chief Executive Officer Washington Public Power Supply System P.O.
Box 968 (Mail Drop 1023)
- Richland, Washington 99352-0968
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
NUCLEAR PROJECT NO.
2 (WNP-2)
Dear Mr. Parrish:
The purpose of this letter is to document a telephone conversation held on July 31,
- 1996, between Timothy G. Colburn and Om Chopra of the Nuclear Regulatory Commission and members of your staff (Marsha Eades, et.al.) to obtain additional information regarding your justification for appeal item No.
2 (enclosure to the staff's June 18, 1996, letter) related to the WPPSS application for conversion to the Improved Technical Specifications (ITS) for WNP-2.
Your staff indicated that grid voltages typically run higher than the output voltage of diesels being tested resulting in the need to increase field excitation to match generator output voltage with the grid.
Establishing the power factor would result in additional excitation which your staff postulates
. could result in exceeding field excitation current limits recommended by the manufacturer.
Your staff reiterated your appeal position that you wish to specify the power factor limits for TS Surveillance Requirements (SR) 3.8. 1.9, 3.8.1. 10 and 3.8. 1.14 in the Bases instead of the TS, with an explanatory note in the SR rather than have the limits contained in the TS.
Your staff committed to provide additional information to justify your request by August 9, 1996 (or sooner if available),
including the=results of the two previous tests conducted on the diesels during your recent
- outage, plus an explanation of how the excitation current limits or diesel voltage limits could be exceeded for postulated test conditions.
Additionally, you committed to provide additional information on =-the need for locating the power factor limits in the Bases rather than the TS, including your discussion on the current underloaded condition of the diesels and plans to control the power factor limits under the provisions of 10 CFR 50.59, rather than by the license amendment
- process, should you choose to additionally load the diesels in the future.
0't'0 04.l
,96080702ii 960802 PDR ADOCK 05000397 P
ÃCI'/.
gIIg ALECRT'
@~
Mr. J.
V. Parrish August 2, 1996 If you have any questions please contact me at 301-415-1341.
Sincerely, Docket No. 50-397 cc:
See next page Original Signed By Timothy G. Colburn, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation DISTRIBUTION:
QDocket FileQ PUBLIC PDIV-2 Reading JRoe WBateman TColburn EPeyton JCalvo-
- KPerkins, RIV/WCFO
- JDyer, RIV
- HWong, WCFO OChopra DOCUMENT NAME:
WNP94226. RAI OFC NAME DATE PD IV-2/LA.
Wey%on 8/
( /96 NRR:EELB JCalvo PD IV-2/PM TColburn:ye 8/ i/96 8/ (/96 OFFICIAL RECORD COPY PDIV-2/0 WBateman 8/
/96
l v"
Hr. J.
V. Parrish August 2, i996 CC:
Mr. Greg O. Smith (Mail Drop 927H)
WNP-2 Plant General Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Hr. Al E. Houncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Mr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympi a, Washington 98504-3172 Mr. David A. Swank (Hail Drop PE20)
- Manager, Regulatory Affairs Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Hr. Paul R.
Bemis (Hail Drop PE20)
Vice President, Nuclear Operations Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 5 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Hr. R. C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 69
- Richland, Washington 99352-0968 H. H. Philips, Jr.,
Esq.
Winston E Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. Rodney L. Webring (Hail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Ms. Lourdes C. Fernandez (Hail Drop PE20)
- Manager, Licensing Washington Public Power Supply System P. 0.
Box 958
- Richland, Washington 99352
0
~ ~
~
II I