Forwards Insp Rept 50-397/96-06 on 960331-0511 & Notice of Violation.Violations Demonstrate Need for Continued Attention W/Control of Maint Activities
ML17292A323
Person / Time
Site: Columbia 
Issue date: 06/20/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292A324 List:
References
NUDOCS 9606240210
Download: ML17292A323 (6)


See also: IR 05000397/1996006

Text

CATEGORY

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

.~J

'CCESSION NBR:9606240210

DOC.DATE: 96/06/20

NOTARIZED: NO

i FACIL:50-397 WPPSS Nuclear Project,

Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

DYER,J.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards

insp rept 50-397/96-06

om 960331-0511

s notice of

violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET ¹

05000397

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

Ee~

FILE CE T

RjCIRC~

B

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

XTERNAL'ITCO BRYCEiJ

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

COLBURN,T

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US

TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

~pR REG(g(~r0

<<~re+

UNITE0 STAT ES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

JUN 20 l996

J.

V. Parrish,

Chief Executive Officer

Washington Public

Power Supply System

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/96-06

AND NOTICE OF VIOLATION

Dear Mr. Parrish:

On May 11,

1996,

the

NRC completed

an inspection

at your Washington Nuclear

Project-2 facility.

The enclosed

report presents

the results of that

inspection.

During the 6-week period covered

by this inspection period, your conduct of

activities at the Washington Nuclear Project-2 facility was generally

characterized

by effective

command

and control

by operations,

sound

engineering

and maintenance

practices,

and careful radiological

work controls.

We are concerned,

however,

about

one violation with two examples of NRC

requirements

that were identified concerning ineffective corrective actions.

This violation is cited in the enclosed

Notice of Violation, and the

circumstances

surrounding it are described

in detail

in the enclosed

report.

No response

for the violation is required.

The violation involved two instances

where planned corrective actions

from a

previous violation and licensee

event report were not effectively implemented,

resulting

in repeat

occurrences

of the initial problems.

In the first

instance,

you failed to properly verify that all the moisture separator

shroud

hold down bolts were

removed before attempting

to lift the shroud.

In the

second

instance,

you failed to adequately

monitor standby service water room

cooler fouling and allowed degradation

below established

limits.

We also

noted

two further examples of a violation cited in

NRC Inspection

Report 50-

397/96-02 involving weaknesses

in instructions

and procedures

for work on the

diesel

generator

heating, ventilation,

and air conditioning dampers.

We note

that these further examples

were identified at the

same

time as the violation

in

NRC Inspection

Report 50-397/96-02

and that you have initiated actions to

address

these

examples.

Nevertheless,

these

examples

demonstrate

the

need for

your continued attention with the control of maintenance activities.

96062402i0

960620

PDR

ADQCK 05000397

8

PDR

Washington Public

Power

Supply System

In accordance

with 10

CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed

in the

NRC Public Document

Room (PDR).

Sincerely,

Docket:

50-397

License:

NPF-21

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-397/96-06

J.

E.

er, Director

Division of Reactor Projects

cc w/enclosures:

Hr. Frederick

S. Adair, Chairman

Energy Facility Site Evaluation Council

P.O.

Box 43172

Olympia, Washington

98504-3172

Chairman

Benton County Board of Commissioners

P.O.

Box 69

Prosser,

Washington

99350-0190

Mr. Paul

R.

Bemis (Hail Drop PE20)

Vice President,

Nuclear Operations

Washington Public

Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Hr. Rodney

L. Webring (Hail Drop PE08)

Vice President,

Operations

Support/PIO

Wshington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Hr. Greg

O. Smith (Hail Drop 927M)

WNP-2 Plant General

Manager

Washington

Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Washington Public

Power

Supply System

Mr. David A.

Swank (Hail Drop PE20)

Manager,

Regulatory Affairs

Washington

Public

Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Hr. Al E. Mouncer (Mail Drop 396)

Chief Counsel

Washington

Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Hs.

Lourdes

C.

Fernandez

(Mail Drop PE20)

Manager,

Licensing

Washington Public

Power Supply System

P.O.

Box 968

Richland,

Washington

99352

Mr. Malcolm H. Phillips, Jr.,

Esq.

Winston 5 Strawn

1400

L Street,

N.W.

Washington,

DC 20005-3502

Washington Public Power

Supply System

JUN 20 l996

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

E-Mail report to Hike Davis,

NRR (HJDI)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

MIS System

RIV File

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:i WN2iWN606RP.RCB

To roceilre copy ot docrxnent, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" a No copy

RIV:SRI

HCBarr*

5/24/96

C:DRP/E

HJWong*

6/5/96

0:DRP

JEDyer

6j2P/96

  • prev>ous y concurre

OFFICIAL RECORD

COPY

Washington

Public

Power

Supply System

JUN 20 l996

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

E-Mail report to Mike Davis,

NRR (MJD1)

bcc to

DMB ( IEOI )

bcc distrib.

by RIV:

L. J. Callan

DRP Director

Branch Chief (DRP/E,

WCFO)

Senior Project

Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

DRS-PSB

MIS System

RIV File

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:~t WN2ttWN606RP.RCB

To receive copy oi dccrananr, indicate inborn "C

~ Copy without enclosures

"E

~ Copy with enclosures

rt

~ No copy

RIV:SRI

HCBarr*

5/24/96

  • previous y concurre

C:DRP/E

HJWon *

6/5/96

D:DRP

JEDyer

6/2P/96

OFFICIAL RECORD

COPY