Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17292B331 + (09:15:10, 8 January 2025)
- 05000397/LER-1998-003, :on 980311,WNP-2 Experienced Scram Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting Scram Signal in Conditions.Changes in post-SCRAM Operational Strategy Implemented + (09:15:11, 8 January 2025)
- 05000397/LER-1998-002, :on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D + (09:15:13, 8 January 2025)
- ML17292B327 + (09:15:14, 8 January 2025)
- IR 05000397/1998004 + (09:15:17, 8 January 2025)
- ML17292B323 + (09:15:18, 8 January 2025)
- ML17292B321 + (09:15:19, 8 January 2025)
- GO2-98-065, Notifies That Sk Drinkard,License OP-42542,will No Longer Be Maintaining License in Accordance W/Util Licensed Operator Requalification Program + (09:15:20, 8 January 2025)
- IR 05000397/1996022 + (09:15:22, 8 January 2025)
- ML17292B318 + (09:15:23, 8 January 2025)
- IR 05000397/1997020 + (09:15:24, 8 January 2025)
- ML17292B315 + (09:15:25, 8 January 2025)
- ML17292B314 + (09:15:26, 8 January 2025)
- ML17292B312 + (09:15:27, 8 January 2025)
- IR 05000397/1997013 + (09:15:28, 8 January 2025)
- ML17292B307 + (09:15:29, 8 January 2025)
- ML17292B305 + (09:15:30, 8 January 2025)
- GO2-98-058, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-20.Corrective Actions:Three Sealed Bags Containing High Efficiency Particulate Air Filters Were Properly Labeled as Radioactive Material Immediately After Discovery + (09:15:31, 8 January 2025)
- GO2-98-059, Submits Response to Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Action Initiated to Communicate Mgt Expectations Re Extension Allowances for Corrective Action Due Dates + (09:15:32, 8 January 2025)
- GO2-98-060, Submits Response to Violations Noted in NRC Insp Rept 50-397/97-13.Corrective Actions:All Pertinent RCIC Components Have Been Upgraded as Necessary,W/Exception of Two Rupture Disks + (09:15:34, 8 January 2025)
- ML17292B295 + (09:15:35, 8 January 2025)
- ML17292B294 + (09:15:36, 8 January 2025)
- GO2-98-057, Responds to NRC Re NOV & Exercise of Enforcement Discretion in Insp Rept 50-397/96-22.Review of SEs & Associated Activities Was Completed on 980316 + (09:15:37, 8 January 2025)
- GO2-98-055, Monthly Operating Rept for Feb 1998 for WNP-2 + (09:15:38, 8 January 2025)
- ML17292B290 + (09:15:41, 8 January 2025)
- PNO-IV-98-012A, update to 980311 Occurrence of Reactor Scram as Result of Inadvertent Closure of One of Main Steam Isolation Valves.Regioniv Special Insp Team Is Completing Charter W/Preliminary Observations & Findings + (09:15:42, 8 January 2025)
- PNO-IV-98-012, on 980312,plant Experienced Reactor Trip as Result of Inadvertent Closure of One of Msivs.Caused by Loss of Instrument Air to Valves Actuator.Reactor Vessel Cooled Down to Facilitate Containment Entry for Investigation + (09:15:44, 8 January 2025)
- ML17292B283 + (09:15:44, 8 January 2025)
- GO2-98-049, Provides Mod to 971204 Request for Amend to Licnese NPF-21, Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only,As Identified by T Huang (NRR) During 980211 Site Visit + (09:15:45, 8 January 2025)
- GO2-98-051, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Performed Followup Assessment of Operability Which Determined RCIC Sys to Be Operable But Nonconforming & Upgraded RCIC Components + (09:15:46, 8 January 2025)
- ML17292B279 + (09:15:48, 8 January 2025)
- GO2-98-052, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-13 on 970715-0802.Corrective Actions:Per Was Initiated After Unplanned Start of Reactor Recirculation Pump + (09:15:49, 8 January 2025)
- GO2-98-048, Forwards Supplemental Evaluation of Effect of Revised Safety Limit on Cycle 8 Operations at WNP-2,in Response to Two Unresolved Issues Noted in Insp Rept 50-397/97-11 + (09:15:50, 8 January 2025)
- GO2-98-053, Submits Rept of Listed Property & Liability Insurance Coverage for WNP-2 in Force,Per 10CFR50.54(w)(3) + (09:15:52, 8 January 2025)
- IR 05000397/1997014 + (09:15:55, 8 January 2025)
- IR 05000397/1997018 + (09:15:56, 8 January 2025)
- GO2-98-042, Forwards Proprietary Response to 980212 RAI Re License Amend Request on Min Critical Power Ratio Safety Limits.Encl Withheld,Per 10CFR2.790 + (09:15:57, 8 January 2025)
- 05000397/LER-1998-001, :on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was Initiated + (09:15:59, 8 January 2025)
- GO2-98-045, Forwards Copy of Performance Self-Assessment,WNP-2, Documenting Results of Assessment,Which Was Conducted 971006-31,of Key Functional Areas + (09:16:01, 8 January 2025)
- ML17292B264 + (09:16:01, 8 January 2025)
- GO2-98-038, WNP-2 Annual Operating Rept for 1997 + (09:16:04, 8 January 2025)
- ML17292B260 + (09:16:06, 8 January 2025)
- ML17292B259 + (09:16:07, 8 January 2025)
- GO2-98-036, Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1997 Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released from WNP-2 During Reporting Period.Odcm,Encl + (09:16:08, 8 January 2025)
- ML17292B258 + (09:16:08, 8 January 2025)
- ML17292B255 + (09:16:10, 8 January 2025)
- ML17292B254 + (09:16:11, 8 January 2025)
- ML17292B252 + (09:16:12, 8 January 2025)
- ML17292B251 + (09:16:13, 8 January 2025)
- GO2-98-028, Monthly Operating Rept for Jan 1998 for WNP-2 + (09:16:14, 8 January 2025)
- ML17292B248 + (09:16:14, 8 January 2025)
- GO2-98-025, Informs That DW Coleman Now Acting as Manager,Regulatory Affairs for Facility.Std Distribution for Documents Sent to Util Should Be Modified + (09:16:16, 8 January 2025)