Forwards Insp Rept 50-397/98-03 on 980201-0314 & Nov.Four Violations & 1 Noncited Violation Identified,Indicating Performance Lapses in Operations,Engineering & Fire Protection
ML17292B312
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B313 List:
References
50-397-98-03, 50-397-98-3, NUDOCS 9804080239
Download: ML17292B312 (11)


See also: IR 05000397/1998003

Text

CATEGORY 2

REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9804080239

DOC.DATE: 98/03/31

NOTARIZED: NO

~

~

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

AUTH.NAME

AUTHOR AFFILIATION

WONG,H.J.

Region

4 (Post

820201)

RECXP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT: Forwards insp rept 50-397/98-03

on 980201-0314

6 NOV.Four

violations

& 1 noncited violation identified, indicating

performance

lapses in operations, engineering

&, fire

protection.

DISTRIBUTION CODE: IE01F

COPXES

RECEIVED:LTRj ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vi&o ation Response

I

NOTES:

DOCKET

05000397

E

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

'LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

COPIES

LTTR ENCL"'

1

INTERNAL: ACRS

OD7'VER

LE CENTE

NRR D PM PECB

NUDOCS-ABSTRACT

OGC/HDS3

XTERNAL

LITCO BRYCEi Z H

NRC PDR

2

. 2

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

1

1

NOAC

1

1

NUDOCS FULLTEXT

1

1

1

1

1

1

1

1

1

1

1

1

1

" 1

1

1

D

E

KG('QNVR

RON

88C PCO. P

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD1

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

Q REQuC

~c+

"o

+

Cy

I j

++*<<+

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-'0968

March 31,

1998

SUBJECT: NRC INSPECTION REPORT 50-39?/98-03 AND NOTICE OF VIOLATION.

Dear Mr. Parrish:

From February

1 to March 14, 1998, a routine resident inspection was conducted at your

Washington Nuclear Project-2 reactor facility. The enclosed report presents the scope and

results of that inspection.

During the inspection period, the conduct of licensed activities at your WNP-2 facilitywas

characterized by generally safety-conscious operations and maintenance, with appropriate

support from plant engineering.

However, four violations and one noncited violation of NRC

requirements were identified, indicating performance lapses in operations, engineering, and fire

protection. The first two violations involved an organizational knowledge deficiency on the use

and applicability of the grace period allowed for Technical Specification surveillance testing.

The third violation involved your program to monitor primary coolant sources outside

containment.

The fourth violation involved inadequate control of transient combustibles and

indicates that actions taken in response to a recent similar violation were ineffective.

These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detail in the enclosed report. The NRC has

concluded that information regarding the*reasons for Violations A and B, the corrective actions

taken and planned to correct the violations and prevent recurrence are already adequately

addressed

on the docket in the enclosed report. Therefore, you are not required to respond to

this letter concerning those two violations unless the description therein does not accurately

reflect your corrective actions or your position.

In that case,'or ifyou choose to provide

additional information, you should followthe instructions specified in the enclosed Notice.

Please note that you are required to respond to this letter and should followthe instructions

specified in the enclosed Notice when preparing your response to Violations C and D. The

NRC will use your response,

in part, to determine whether further enforcement action is

necessary

to ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.?90 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room.

9804080239

980331

PDR

ADOCK 05000397

8

PDR

~t

Washington Public Power Supply System

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Docket No.:

50-397

License No.:

NPF-21

H. J. Wong, Chief

Reactor Projects Branch E

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-397/98-03

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Douglas W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Washington Public Power Supply System

-3-

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

r

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:i WN2iWN803RP.SAB

To receive copy of document, indicate in box: "C" = Copy without enctosures

"E" = Copy with enctosures "N"= No copy

RIV:SRI:DRP/E

SPE:DRP/E

C:DRP/E

SABoynton ~~

GWJohnsto

HJWong

03/)ff98

P~ W+>vv

IVpy

03

98

03/A/98

OFFICIALRECORD COPY

Washington Public Power Supply System

-4-

E-Mail report to,T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

,bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:h WN2$WN803RP.SAB

" = Cop

with enctosures "N"= No cop

To receive cop

of document, Indicate in box: "C" = Copy without enciosures

"E

RIV:SRI:DRP/E

SABoynton ~M

03/Sfr98

SPE:DRP/E

GWJohnsto

03

98

C:DRP/E

HJWong

03/gj98

p~~ ra~

'IV+y

OFFICIALRECORD COPY