Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17305A404 + (07:30:05, 8 January 2025)
- ML17305A403 + (07:30:06, 8 January 2025)
- IR 05000528/1989045 + (07:30:09, 8 January 2025)
- ML17305A400 + (07:30:10, 8 January 2025)
- ML17305A399 + (07:30:11, 8 January 2025)
- ML17305A397 + (07:30:12, 8 January 2025)
- ML17305A395 + (07:30:13, 8 January 2025)
- ML17305A390 + (07:30:14, 8 January 2025)
- ML17305A393 + (07:30:14, 8 January 2025)
- IR 05000528/1989034 + (07:30:15, 8 January 2025)
- IR 05000528/1989030 + (07:30:17, 8 January 2025)
- ML17305A386 + (07:30:18, 8 January 2025)
- ML17305A385 + (07:30:19, 8 January 2025)
- ML17305A383 + (07:30:20, 8 January 2025)
- 05000528/LER-1989-015, :on 890901,phase B Shunt Reactor on Devers Transmission Line Failed,Causing Ground Fault on 500 Kv Line & Release of Large Vol of Oil & Fire.Caused by Failure of Winding to Bushing.Fire Extinguished + (07:30:21, 8 January 2025)
- IR 05000528/1989041 + (07:30:25, 8 January 2025)
- ML17305A378 + (07:30:27, 8 January 2025)
- IR 05000528/1989036 + (07:30:52, 8 January 2025)
- ML17305A376 + (07:30:53, 8 January 2025)
- ML17305A374 + (07:30:54, 8 January 2025)
- 05000528/LER-1989-006-01, :on 890731,containment Purge Isolation Actuation Signal Initiated Due to Loss of Power to Panel 1E-PNB-D26.Cause Not Identified.Power Restored & Radiation Monitor RU-38 Placed Back on Line + (07:30:56, 8 January 2025)
- ML17305A372 + (07:30:57, 8 January 2025)
- ML17305A371 + (07:30:58, 8 January 2025)
- IR 05000528/1989044 + (07:31:00, 8 January 2025)
- ML17305A367 + (07:31:01, 8 January 2025)
- ML17305A366 + (07:31:02, 8 January 2025)
- IR 05000528/1989046 + (07:31:03, 8 January 2025)
- ML17305A363 + (07:31:04, 8 January 2025)
- ML17305A360 + (07:31:05, 8 January 2025)
- PNO-V-89-065, on 891031,reactor Trip Occurred.Facility Was Holding Power in Attempt to Resolve Problems in Plant Protection Sys Encountered During Power Ascension.Trip Was Uncomplicated & Did Not Require Emergency Classification + (07:31:06, 8 January 2025)
- ML17305A358 + (07:31:10, 8 January 2025)
- ML17305A356 + (07:31:10, 8 January 2025)
- ML17305A354 + (07:31:11, 8 January 2025)
- ML17305A355 + (07:31:11, 8 January 2025)
- 05000528/LER-1989-019, :on 890929,Train B of Fuel Bldg Essential Ventilation Actuation Sys Spuriously Actuated.Caused by Loose Connection Between Radiation Monitor Remote Indication & Control Unit Instrument Drawer & Cabinet + (07:31:13, 8 January 2025)
- ML17305A352 + (07:31:14, 8 January 2025)
- ML17305A349 + (07:31:15, 8 January 2025)
- ML17305A341 + (07:31:16, 8 January 2025)
- ML17305A347 + (07:31:16, 8 January 2025)
- ML17305A338 + (07:31:17, 8 January 2025)
- ML17305A340 + (07:31:17, 8 January 2025)
- 05000530/LER-1989-013-01, :on 890926,control Room Operator Inadvertently Turned Wrong Handswitch During post-maint Testing Which Resulted in ESFAS Actuation.Caused by Personnel Error. Disciplinary Measures Taken + (07:31:19, 8 January 2025)
- ML17305A335 + (07:31:20, 8 January 2025)
- ML17305A333 + (07:31:20, 8 January 2025)
- PNO-V-89-062, on 891019,utils Senior Managers Met W/Natl Nuclear Accreditation Board to Discuss Accreditation Status of Plant Training Programs.Nine Programs Removed from Probation Status + (07:31:22, 8 January 2025)
- ML17305A329 + (07:31:23, 8 January 2025)
- ML17305A328 + (07:31:24, 8 January 2025)
- TAC:75160 + (07:31:24, 8 January 2025)
- ML17305A326 + (07:31:26, 8 January 2025)
- IR 05000528/1989047 + (07:31:28, 8 January 2025)
- ML17305A323 + (07:31:30, 8 January 2025)