Forwards Insp Repts 50-528/89-36,50-529/89-36 & 50-530/89-36 on 890807-0910 & Notice of Violation
ML17305A374
Person / Time
Site: Palo Verde  
Issue date: 10/25/1989
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17305A375 List:
References
NUDOCS 8911130103
Download: ML17305A374 (6)


See also: IR 05000528/1989036

Text

-

Docket Numbers

50-528

50-529

50-530

Arizona Nuclear

Power Project

P.

0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

W.

F.

Conway

Executive Vice President,

Nuclear

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and

3

This refers to the inspection

conducted

by Messrs.

D.

Coe,

T. Polich,

J.

Ringwald,

P.

squalls,

and

C.

Myers of this 'office from August

7 through

September

10,

1989, of activities authorized

by

NRC License

Nos.

NPF-41,

NPF-51 and NPF-74,

and to the discussion

of our findings held by the

inspectors with members of the Arizona Nuclear

Power Project staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that several

of your

activities were not conducted

in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

The enclosed

report and notice of violations discuss

several

concerns

which appear to warrant your attention.

These

concerns

are

summarized

as

fol 1 ows:

Paragraph

2.b describes

an issue involving the alignment of

Emergency Diesel Generator air start

system valves.

Our review has

concluded that the actual

system alignment

was not consistent with

the associated

calculational

assumptions,

and furthermore,

once this

was brought to the attention of your engineering organization,

the

interim action identified by engineering

was not performed at

Unit 3,

as subsequently

identified by

NRC personnel.

Paragraphs

2.f, 7,

and 21 discuss

three separate

instances

where

your reviews of NRC Information Notices were considered

weak.

In

two of the instances,

more comprehensive

reviews could have

potentially prevented plant events

which followed your reviews.

As

we have previously discussed

with you,

an important element of

nuclear

power plant operations

is learning from both your own

experience

and the experience

of others.

Therefore this issue is of

particular concern.

i

891ii30103 891025

PDR

ADOCk( 05000528

G

PNU

Paragraph

7 discusses

the-misalignment of 'valves associated

with the

Spent

Fuel

Pool at Unit 1.

This event is of concern

due to your

past problems with ensuring proper

valve alignments.

Me encourage

you to consider these

issues

and their underlying causes

while conducting your reviews in preparation for the startup of U t

1

and

3.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

En accordance

with 10 CFR 2.790(a),

a copy of this letter and the

enclosures will be placed in the

NRC Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedure

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of. 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

Sincerely,

A.

E. Chaffee,

Deputy Director

Division of Reactor Safety

and

projects

Enclosures:

l. Appendix

A - Notice of Violation

2. Inspection

Report

Numbers

50-528/89-36

50-529/89"36

50-530/89-36

cc w/enclosures:

J.

Levine, Vice President,

Nuclear

Production

M.

F. guinn,

Manager,

Licensing

T.

D. Shriver,

Manager,

Compliance

B. Ballard, Director, guality Assurance

R'. Fullmer,

Manager, guality Audits

8 Monitoring

A.

C. Gehr,

Esq.

Ms.

L. Bernabei,

GAP

J.

Brown, Arizona Corporation

Commission

"3-

bcc w/enclosures:

docket file

G.

Cook

B. Faulkenberry

J

~ Martin

Resident Inspector

Project Inspector

bcc w/o enclosures:

LFMB

M. Smith

REGION V/dot

DCoe

> /~/89

TPol i ch

/~P/89

JRingwal d

PQual

1 s

~/23/89

to /~7/89

CMyers

~ h~ /89

YES /

NO

3

ES /

I

SRichards

AJohnpon

g%y/g

t~!

REQUEST

COP

REQU

ST

YES /

NO

] YES /

NO

] YES /

NO

] YES /

NO

]YES /

NO

a acwarwsz.

iolaus ee

REQUEST

3

YES /

0

TO

PDR

YES /

NO

,