Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202D885 + (08:08:48, 8 December 2024)
- ML20202D884 + (08:08:49, 8 December 2024)
- ML20202D881 + (08:08:50, 8 December 2024)
- ML20202D882 + (08:08:50, 8 December 2024)
- ML20202D878 + (08:08:51, 8 December 2024)
- ML20202D879 + (08:08:51, 8 December 2024)
- ML20202D876 + (08:08:52, 8 December 2024)
- ML20202D874 + (08:08:53, 8 December 2024)
- ML20202D870 + (08:08:54, 8 December 2024)
- ML20202D866 + (08:08:55, 8 December 2024)
- ML20202D868 + (08:08:55, 8 December 2024)
- BSEP-98-0017, Forwards Response to Telcon RAI Re 971106 Proposed License Amends Revising,For Limited Period of Time,Design Basis Qualification Requirements for CREVS & Crev Instrumentation. Calculations,Emergency Procedures & Plant Procedures Encl + (08:08:57, 8 December 2024)
- ML20202D864 + (08:08:57, 8 December 2024)
- ML20202D861 + (08:08:58, 8 December 2024)
- ML20202D859 + (08:08:59, 8 December 2024)
- ML20202D860 + (08:08:59, 8 December 2024)
- ML20202D858 + (08:09:00, 8 December 2024)
- ML20202D857 + (08:09:01, 8 December 2024)
- ML20202D854 + (08:09:02, 8 December 2024)
- ML20202D855 + (08:09:02, 8 December 2024)
- ML20202D852 + (08:09:03, 8 December 2024)
- ML20202D853 + (08:09:03, 8 December 2024)
- A05743, Advises That Automatic Purge/Vent Valve Closure on High Radiation Signal,Per NUREG-0737,Item II.E.4.2,unjustified Based on Low Probability of RCS Leak When Purge Valves Open, in Response to SER Open Item + (08:09:04, 8 December 2024)
- ML20202D850 + (08:09:05, 8 December 2024)
- ML20202D849 + (08:09:05, 8 December 2024)
- ML20202D847 + (08:09:06, 8 December 2024)
- ML20202D846 + (08:09:07, 8 December 2024)
- ML20202D845 + (08:09:07, 8 December 2024)
- ML20202D844 + (08:09:08, 8 December 2024)
- ML20202D841 + (08:09:12, 8 December 2024)
- ML20202D840 + (08:09:13, 8 December 2024)
- ML20202D837 + (08:09:14, 8 December 2024)
- ML20202D834 + (08:09:15, 8 December 2024)
- B12147, Forwards Implementation Ltr Providing Addl Info Re Inadequate Core Cooling Instrumentation Sys,Per 860604 Request Re Conformance w/NUREG-0737,Item II.F.2.Inventory Tracking Sys Procedures Implemented + (08:09:16, 8 December 2024)
- ML20202D825 + (08:09:19, 8 December 2024)
- ML20202D821 + (08:09:20, 8 December 2024)
- ML20202D820 + (08:09:21, 8 December 2024)
- ML20202D818 + (08:09:22, 8 December 2024)
- ML20202D817 + (08:09:22, 8 December 2024)
- PNO-V-86-038, on 860703,facility Experienced Reactor Trip & Safety Injection Due to Momentary High Steam Flow Coincident w/lo-lo Tavg Signal from solid-state Protection Sys.On 860706,second Turbine & Reactor Trip Experienced + (08:09:23, 8 December 2024)
- ML20202D813 + (08:09:24, 8 December 2024)
- ML20202D810 + (08:09:28, 8 December 2024)
- IR 05000397/1986020 + (08:09:29, 8 December 2024)
- ML20202D807 + (08:09:29, 8 December 2024)
- ML20202D802 + (08:09:30, 8 December 2024)
- ML20202D801 + (08:09:31, 8 December 2024)
- ML20202D800 + (08:09:31, 8 December 2024)
- ML20202D799 + (08:09:32, 8 December 2024)
- 05000336/LER-1998-026-01, :on 981223,discovered That Pressurizer Spray Line Fatigue Limits Were Exceeded.Caused by Insufficient Thermal Effects Analysis.Design Mods Will Be Implemented to Ensure Compliance with ASME Code Requirements + (08:09:34, 8 December 2024)
- IR 05000348/1996003 + (08:09:35, 8 December 2024)
- ML20202D795 + (08:09:35, 8 December 2024)