ML20202D818
| ML20202D818 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/30/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-37192-EEVB, IEB-85-003, IEB-85-3, NUDOCS 8607140223 | |
| Download: ML20202D818 (28) | |
Text
~
e s
Arizona Nuclear Power Project PHOENIX. ARIZONA 85072-203i83 !!t' -3 Bi I: I?
P.O. Box 52034 e June 30,U 9$6;yng ANPP-37192-EEVB/JBK/98.05 s $- 51 S
~()j.9-9-g U. S. Nuclear Regulatory Commission Region V 1450 Maria Iane, Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. J. B. Martin Regional Administrator, Region V
Subject:
NRC IE Bulletin 85-03: Motor-operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings File: 86-055-026
Dear Mr. Martin:
This letter refers to the request for action and information, as identified in the subject bulletin, that was received by ANPP on December 2, 1985.
Attached please find the responses to those items directed to licensees and plants under construction.
Very truly yours, k
b O.
cur nal E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/JBK/ dim Attachments cc:
R. P. Zimmerman (all w/a)
E. A. Licitra A. C. Gehr U. S. Nuclear Regulatory Commission (Original)
Document Control Desk Washington, DC 20555 I[-ll
STATE OF ARIZONA )
) ss.
COUNTY OF MARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Executive Vice.
President, Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
I M
0 0.,
C L
Edwin E. Van Brunt, Jr.
Sworn to before me this
/, /,
day of O /, /r f
, 1986.
j l
M')ess[IT}enAd i
Notary Public My Commission Expires:
My Commission Expires April 6,1987
ATTACHMENT A For motor-operated valves in the high pressure coolant injection / core spray and emergency feedwater systems (RCIC for BWRs) that are required to be tested for operational readiness in acaordance with 10 CFR 50.55a(g), develop and implement a program to ensure that valve operator switches are selected, set and maintained properly. This should include the following components:
NRC Item a a.
Review and document the design basis for the operation of each valve.
This documentation should include the maximum differential pressure expected during both opening and closing the valve for both normal and abnormal events to the extent that these valve operations and events are included in the existing, approved design basis, (i.e., the design basis documented in pertinent license submittals such as FSAR analyses and fully-approved operating and emergency procedures, etc.).
When determining the maximum differential pressure, those single equipment failures and inadvertent equipment operations (such as inadvertent valve closures or openings) that are within the plant design basis should be assumed.
PVNGS Response ANPP has completed the design basis review for the operation of each motor-operated valve in the Auxiliary Feedwater (AN) and High Pressure Safety Injection (HPSI) systems for Palo Verde Units 1, 2, and 3.
The system valve data summary for each unit is presented in Attachment B.
f
NRC Item b b.
Using the results from item a above, establish the correct switch settings.
This shall include a program to review and revise, as necessary, the methods for selecting and setting all swite:>es (i.e.,
torque, torque bypass, position limit, overload) for each valve operation (opening and closing).
If the licensee determines that a valve is inoperable, the licensee shall also make an appropriate justification for continued operation in accordance with the applicable technical specification.
PVNGS Response ANPP's program to review and revise, as necessary, the methods for selecting and setting all switches for each valve operation (opening and/or closing, as appropriate) in the AFW and HPSI systems is expected to include:
1.
Review the design basis provided in Item a.
2.
Review the valve manufacturer design methodology that generated the valving requirements (i.e., type, actuator torques, thrust valves) which ensure proper valve operation without failure.
3.
Review the motor-operator manufacturer design methodology that generated the motor-operator requirements (i.e.,
size, nominal torque, maximum torque, torque bypass, torque limit, overload) which ensure proper motor-operator / valve operation without failure.
4.
Review any changes to the initial torque switch settings made by the manufacturer and any field resettings to accommodate actual operating conditions.
5.
Establish procedures to ensure motor-operator switch settings are properly reset e 5. maintained throughout the life of the plant (this is intended to be consistent with Item d).
6.
Establish the justification for continued operation for those valves which are determined to be inoperable.
The scheduled completion date of Item b is January 30, 1987.
I l
l
-_._ _ _-. _.__ _.._..---__ _.._.._ _ _ _ _... _ --_..,-..~,._._._,
NRC Item c c.
Individual valve settings shall be changed, as appropriate, to those established in item b, above.
Whether the valve setting is changed or not, the valve will be demonstrated to be operable by testing the valve at the maximum differential pressure determined in item a above with the exception that testing motor-operated valves under conditions simulating a break in the line containing the valve is not required.
Otherwise, justification should include the alternative to maximum differential pressure testing which will be used to verify the correct settings.
Note: This bulletin is not intended to establish a requirement for valve testing for the condition simulating a break in the line containing the valve.
However, to the extent that such valve operation is relied upon in the design basis, a break in the line containing the valve should be considered in the analyses prescribed in items a and b above.
The resulting switch settings for pipe break conditions should be verified, to the extent practical, by the same methods that would be used to verify other settings (if any) that are not tested at the maximum differential pressure.
Each valve shall be stroke tested, to the extent practical, to verify that the settings defined in item b above have been properly implemented even if testing with differential cannot be performed.
PVNGS Response Individual valve settings shall be changed, as appropriate, to those established in Item b.
Each motor-operated valve in the HPSI and AFW systems will be stroke tested (at maximum differential pressure or flow rate if practical) prior to any switch adjustments as a result of this bulletin, and after the switch adjustments to verify the switch settings from Item b have been properly implemented.
If a stroke test cannot be performed at maximum differential pressure or flow rate, the valves operability will be verified using an l
alternative method (to be determined).
I i
'Ihe testing will be conducted per the following schedule:
Unit 1 - First refueling outage Unit 2 - Surveillance test outage Unit 3 - Prior to November 15, 1987 NRC Item d d.
Prepare or revise procedures to ensure that correct switch settings are determined and maintained throughout the life of the plant.*
Ensure that applicable industry recommendations are considered in the preparation of these procedures.
PVNGS Response Procedures for correct motor-operator switch setting determination, and maintenance of this information throughout the life of the plant, will be established in conjunction with Item b.
The scheduled completion date of Item d is January 30, 1987.
- This item is intended to be completely consistent with action item 3.2,
" Post-Maintenance Testing ( All Other Safety-Related Components)," of Generic Letter 83-28, " Required Action Based on Generic Implications of Salem ATWS Events."
These procedures should include provisions to monitor valve performance to ensure the switch settings are correct.
This is particularly important if the torque or torque bypass switch setting has been significantly raised above that required.._.. _ - _. -
NRC Item e e.
Within 180 days of the date of this bulletin, submit a written report to the NRC that:
(1) reports the results of item a and (2) contains the program to accomplish items b through d above including a schedule for completion of these items.
1.
For plants with an OL, the schedule shall ensure that these items are completed as soon as practical and within two years from the date of this bulletin.
2.
For plants with a CP, this schedule shall ensure that these items are completed before the scheduled date for OL issuance or within two years from the date of this bulletin, whichever is later.
PVNGS Response (1) ANPP has completed the design basis review for the operation of each motor-operated valve in the AFW and HPSI systems.
(2) The scheduled completion dates of the programs to accomplish each Item are:
Item a: Completed Item b: January 30, 1987 Item c: Unit 1 - First Refueling Outage Unit 2 - Surveillance Test Outage Unit 3 - Prior to November 15, 1987 Item 4: January 30, 1987 NRC Item f f.
Provide a written report on completion of the above program. This report should provide (1) a verification of completion of the request program, (2) a summary of the findings as to valve operability prior to any adjustments as a result of this bulletin, and (3) a summary of data in accordance with Table 2, Suggested Data Summary Format.
The NRC staff intends to use this data to assist in the resolution of Generic Issue II.E.6.1.
This report shall be submitted to the NRC within 60 days of completion of the program.
Table 2 should be expanded, if appropriate, to include a summary of all data required to evaluate the response to this bulletin.
PVNGS Response ANPP plans to submit a formal report within 60 days of completion of Items a through d.
The formal report shall provide (1) a verification of completion of the requested program, (2) a summary of the findings as to valve operability prior to any adjustments as a result of this bulletin, and (3) a summary of data in accordance with the suggested format outlined in the bulletin.
NRC Question Although no specific request or requirement is intended, the time required to complete each action item above would be helpful to the NRC in evaluating the cost of this bulletin.
l PVNGS Response As of May 23, 1986, the estimated time expenditure on each action item is summarized below:
Item a:
- 375 man-hours Vendors - 500 man-hours Item b:
- 2000 man-hours
- Vendors - 100 man-hours Item c:
- 180 man-hours Vendors - Not Applicable Item d:
- 100 man-hours Vendors - Not Applicable l
- Includes time expenditure for NRC IE Module 35743 Motor-Operated Valve Maintenance Program begun in Fall of 1983.
1.
ATTACHMENT B AW AND HPSI VALVE DATA
SUMMARY
FOR PALO VERDE UNITS 1, 2 AND 3
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT # 1 l Valve Numberl Valve l
l l
lManufacturerl Operator:
l l
Maximum l
l Model l Manufacturer l
l Differential l
l Type / Size l Model l
Valve l
Pressure (PSID): l l Body Rating l Motor RPM l
Function l Opening / Closing l
l l
l l
l l1JAFBHV-0030l Limitorque lAux W Reg l
1740./1740.
l lCCI l
SMB-00-15 l Valve: PPB tol l
lEXG9-X3-X6P6l 3600 RPM lSG1 l
l l Globe /4" l
l l
l 1900 lb.
l l
l l
l l
l l
l l1JAFBHV-00311 Limitorque l Aux W Reg l
1740./1740.
l lCCI l
SMB-00-15 l Valve: PPB l l
lEXG9-X3-X6P6l 3600 RPM lto SG2 l
l l Globe /4" l
l l
l l900 lb.
l l
l l
l l
l l
l l1JAFAHV-0032l Limitorque l Aux. W Reg l 1810./1810.
l lCCI l
SMB-00-15 l Valve: PPA l l
lEXG9-X3-X6P61 3600 RPM lto SG1 l
l l Globe /4" l
l l
l l900 lb.
I l
l l
l l
l l
l l1JAFCHV-0033l Limitorque l Aux W Reg l
1810./1810.
l lCCI l
SMB-00-15 l Valve: PPA l l
lEXG9-X3-X6P6l 1900 RPM lto SG2 l
l l Globe /4" l
l l
l 1900 lb.
I l
l l
I l
l l1JAFAUV-0034l Limitorque l Aux W Isol l
1740./1740.
l lAnch/Dar l
SMB-00-25 l Valve: PPB l l
l5746 l 1800 RPM lto SG1 l
l l Gate /6-l l
l l
l900 lb.
I I
I l
l l
l l
l l1JAFBUV-0035l Limitorque l Aux W Isol l
1740./1740.
l lAnch-Der l
SMB-00-25 l Valve: PPB l
l 15746 l
1800 RPM lto SG2 l
l l Gate /6" l
l l
l l900 lb.
l l
l l
l l
l l
l l1JAFCUV-0036l Limitorque l Aux W Isol l
1810./1810.
l lAnch/Dar l
SMB-00-25 l Valve: PPA l l
l5746 l 1800 RPM lto SG1 l
l l Gate /6-l l
l l
l900 lb.
l l
l l
0813K/0029K
-B1-
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT # 1 l Valve Number l Valve l
l l
l Manufacturer l Operator:
l l
Maximum l
l Model l Manufacturer l
l Differential l
l Type / Size l Model l
Valve l
Pressure (PSID): l l Body Rating l Motor RPM l
Function l Opening / Closing l
l l
l l
l l1JAFDUV-0037l Limitorque l Aux FW Isol l
1810./1810.
l l Anch/Dar l SMB-00-25 l Valve: PPA l l
l5746 l 1800 RPM lto SG2 l
l l Gate /6" l
l l
l 1900 lb.
l l
l l
l l
l l
l l1JAFAHV-0054l Limitorque l Aux FW l
1355./NA l
lGimpel l
SMB l Turbine Trip l l
lGS-N l
1900 RPM l Valve l
l l Globe /4" l
l l
l l900 lb.
l l
l l
I
-B2-
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT # 2 l Valve Numberl Valve i
I l
l Manufacturer l Operator:
l l
Maximum l
l Model l Manufacturer l
l Differential l
l Type / Size l
Model l
Valve l
Pressure (PSID): l l Body Rating l Motor RPM l
Function l
Opening / Closing l l
l l
1 l
l 2JAFBHV-0030l Limitorque lAur W Reg l
1740./1740.
l lCCI l SMB-00-15 l Valve: PPB tol l
lEXG9-X3-X6P6l 3600 RPM lSG1 l
l l Globe /4" l
l l
l l900 lb.
l l
l l
l l
l l
l l2JAFBHV-0031l Limitorque l Aux W Reg l
1740./1740.
l lCCI l
SMB-00-15 l Valve: PPB l l
l EXG9-X3-X6P6 l 3600 RPM lto SG2 l
l l Globe /4" l
l l
l l900 lb.
l l
I l
l l
l l
l l2JAFAHV-00321 Limitorque l Aux. W Reg l 1810./1810.
l lCCI l
SMB-00-15 l Valve: PPA l l
lEXG9-X3-X6P61 3600 RPM lto SG1 l
l l Globe /4" l
l l
l 1900 lb.
l l
l l
l l
l l
l l2JAFCHV-0033l Limitorque l Aux W Reg l
1810./1810.
l lCCI l
SMB-00-15 l Valve: PPA l l
lEXG9-X3-X6P61 1900 RPM lto SG2 l
l l Globe /4" l
l l
l l900 lb.
l l
l l
1 I
I I
l 2JAFAUV-00341 Limitorque lAur N Isol l
1740./1740.
l lAnch/Dar l SMB-00-25 l Valve: PPB l l
l5746 l
1800 RPM lto SG1 l
l l Gate /6" l
l l
l l900 lb.
l l
l l
i l
I l
l2JAFBUV-0035l Limitorque l Aux W Isol l 1740./1740.
l l Anch-Dar l
SMB-00-25 l Valve: PPB l l
15746 l 1800 RPM lto SG2 l
l l Gate /6" l
l l
l l900 lb.
l l
l l
l l
l I
l l2JAFCUV-00361 Limitorque l Aux W Isol l
1810./1810.
l lAnch/Dar l SMB-00-25 l Valve: PPA l l
l5746 l 1800 RPM lto SG1 l
l l Gate /6" l
l l
l l900 lb.
l l
l l
-B3-
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT # 2 l Valve Numberl Valve l
l l
lManufacturerl Operator:
l l
Maximum l
l Model l Manufacturer l
l Differential l
l Type / Size l
Model l
Valve l
Pressure (PSID): l l Body Rating l Motor RPM l
Function l
Opening / Closing l
l l
l l
l l2JAFDUV-0037l Limitorque lAux FW Isol l 1810./1810.
l l Anch/Dar l
15746 l
1800 RPM lto SG2 l
l l Gate /6" l
l l
l 1900 lb.
l l
l l
l l
l l
l l2JAFAHV-0054l Limitorque l Aux FW l
1355./NA l
lGimpel l
SMB l Turbine Trip l l
lGS-N l
1900 RPM l Valve l
l l Globe /4" l
l l
l 1900 lb.
l l
l l
-B4-
^
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT f 3 l Valve Numberl Valve l
I l
lManufacturerl Operator:
l l
Harimun l
l Model l Manufacturer l l
Differential l
l Type / Size l
Model l
Valve l
Pressure (PSID): l l Body Ratina l Motor RPM l
Function l
Opening / Closing l
l l
l 1
l l 3JAFBHV-0030l Limitorque l Aux FW Reg l
1740./1740.
l lCCI l SMB-00-15 l Valve: PPB tol l
lEXG9-X3-X6P6l 3600 RPM lSG1 l
l l Globe /4" l
l l
l l900 lb.
l l
l l
l l
l l
l 13JAFBHV-0031l Limitorque l Aux FW Reg l
1740./1740.
l lCCI l SMB-00-15 l Valve: PPB l
l lEXG9-X3-X6P6l 3600 RPM lto SG2 l
l l Globe /4" l
l l
l 1900 lb.
l l
l l
i 1
I I
i l
13JAFAHV-0032l Limitorque lAux. FW Reg l 1810./1810.
l lCCI l SMB-00-15 lValve: PPA l l
lEXG9-X3-X6P61 3600 RPM lto SG1 l
l l Globe /4" l
l l
l 1
1900 lb.
l l
l l
l l
l l
l l3JAFCHV-0033l Limitorque l Aux FW Reg l
1810./1810.
l i
lCCI l SMB-00-15 IValve: PPA l l
lEXG9-X3-X6P6l 1900 RPM lto SG2 l
l l
l Globe /4" l
l l
l l900 lb.
I l
l l
l l
l l
l3JAFAUV-00341 Limitorqiie l Aux FW Isol l 1740./1740.
l lAnch/Dar l
SMB-00-25 l Valve: PPB l l
l l5746 l 1800 RPM lto SG1 l
l l
l Gate /6" l
l l
l
}
1900 lb.
I l
l l
I l
13JAFBUV-0035l Limitorque l Aux FW Isol l
1740./1740.
l lAnch-Dar l
SMB-00-25 l Valve: PPB l l
l5746 l
1800 RPM lto SG2 l
l l Gate /6" l
l l
l l900 lb.
l l
l 1
I I
l 13JAFCUV-0036l Limitorque l Aux FW Isol l
1810./1810.
l lAnch/Dar l SMB-00-25 l Valve: PPA l l
15746 l 1800 RPM lto SG1 l
l l Gate /6" l
l l
l i
l900 lb.
l l
l l
t
-BS-
PVNGS AUXILIARY FEEDWATER SYSTEM VALVE DATA
SUMMARY
UNIT # 3 l Valve Numberl Valve l
l l
l Manufacturer l Operator:
l l
Maximum l
l Model l Manufacturer l
l Differential l
l Type / Size l
Model l
Valve l
Pressure (PSID): l l Body Rating l Motor RPM l
Function l Opening / Closing l
l l
l l
l 13JAFDUV-0037l Limitorque l Aux FW Isol l 1810./1810.
l l Anch/Dar l
SMB-00-25 l Valve: PPA l l
l5746 l
1800 RPM lto SG2 l
l l Gate /6" l
l l
l 1900 lb.
l l
l l
l l
l l
l 13JAFAHV-0054l Limitorque lAux FW l
1355./NA l
lGimpel l
SMB-0 0-l Turbine Trip l l
lGS-N l
1900 RPM l Valve l
l l Globe /4" l
l l
l l900 lb.
l l
l l
-B6-
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 1 IValve Number l l
l l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratina l
Model RPM l
Function l Opening / Closing l
l l
l l
l l1JCHBHV-0530 l Limitorque lRWT Suction l NA/44 l
lBorg-Warner l SB-1-60 l Isolation l
l 177890-1 1 3455 RPM l
l l
l Gate /20" l
l l
l 1300 lb.
l l
l l
l l
l l
l l1JCHAHV-0531 l Limitorque IRWT Suction l NA/44 l
lBorg-Warner l SB-1-60 l Isolation l
l l77890-1 1 3455 RPM l
l l
l Gate /20" l
l l
l 1300 lb.
l l
l l
l l
l l
l l1JSIAUV-0673 l Limitorque l Containment l
57/NA l
lPosi-Seal l
SMB-00-10 l Sump l
l l14336-3 l
1700 RPM l Suction l
l l Butterfly /24"l l Isolation l
l l150 lb.
l l
l l
l l
l l
l l1JSIAUV-0674 l Limitorque l Containment l
57/NA l
lPosi-Seal l SMB-000-5/
l Sump l
l14336-4 l
1700 RPM l Suction l
l Butterfly /24"l l Isolation l
l l150 lb.
l l
l l
l l
1 l
l l1JSIBUV-0675 l Limitorque l Containment l
57/NA l
lPosi-Seal l SMB-00-10 l Sump l
l l14336 l
1700 RPM l Suction l
l l Butterfly /24"l l Isolation l
l 1150 lb.
I l
l I
l l
l1JSIBUV-0676 l Limitorque l Containment l
57/NA l
lPosi-Seal l
SMB-000-5/
l Sump l
l l14336-4 l
1800 RPM l Suction l
l l Butterfly /24"l l Isolation l
l l150 lb.
l l
l l
1 l
l l1JSIAUV-0666 l Limitorque lHPSI Pump l
NA/1945 l
lBorg-Warner l SMC-04-7.5 lMiniflow l
l 177620-2 l
1800 RPM lRecire Line l
l lY-Globe /2" l
l Isolation l
l l1500 lb.
l l
l l
0827K/0030K
-B7-
i 1
PVNGS HIGN PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT I 1 1
l Valve Number l l
l l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator:
l l
Differential l
j l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Rating l
Model RPM l
Function l
Opening / Closing l
l l
l l
l 4
l1JSIBUV-0667 l Limitorque lHPSI Pump l
NA/1966 l
lBorg-Warner l SMC-00-7.5 lMiniflow l
l l77620-2 l
1800 RPM lRecire Line l
l 4
lY-Globe /2" l
l Isolation l
l l1500 lb.
l l
l l
l l
l l
l 11JSICHV-0321 l Limitorque l Hot Leg l
1924/NA l
lBorg-Warner l SMC-0-25 l Injection l
l l
179530 l 1900 RPM l Flow Control l l
lY-Globe /3" l
l l
l l1500 lb.
l l
l 2
l l
l l
l l1JSIDHV-0331 l Limitorque lHot Leg l
1924/NA l
i lBorg-Warner l SMB-0-25 l Injection l
l 2
J l79530 l 1900 RPM l Flow Control l l
lY-Globe /3" l
l l
l l1500 lb.
l l
i I
l 1
11JSIAHV-0604 l Limitorque l Hot Leg l
1945/NA l
i lBorg-Warner l SMB-00-10 l Injection l
l l77910 l
1800 RPM l Flow Control l l
l Gate /3" l
l l
l l
l1500 lb.
I I
l i
I l1JSIBHV-0609 l Limitorque IHot Leg l
1945/NA 3
lBorg-Warner l SMB-00-10 l Injection l
l 177910 l 1800 RPM l Flow Control l l
l Gate /3" l
l l
i l1500 lb.
l l
l l
l i
l1JSIAHV-0698 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner l SMB-0-10 l Isolation l
l 177740 l
1700 RPM l
l l
1 l Gate /4" l
l l
l1500 lb.
l l
l l
l l
l l
11JSIBHV-0699 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner l SMB-0-10 l Isolation l
l l77740 l
1700 RPM l
l l
J l Gate /4" l
l l
l l1500 lb.
l l
l l
i
-B8-
-.,.c-.
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 1 IValve Number l l
l l
l Manufacturer l Valve l
l Mariaua l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratina Model RPM l
Function l Opening / Closing l
l 1
l l
l l1JSIBUV-0616 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l SMC-00-7.5 l Isolation andl l
177620-2 l
1800 RMP lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l I
l l
l 1
l l
l1JSIBUV-0617 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM lhrottling l
l 1
lY-Globe /2" l
l l
l l
l1500 lb.
l l
l l
l l
I l
l1JSIBUV-0626 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l
SMC-00-7.5 l Isolation andl l
177620-2 l
1800 RPM lBrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
l l
l l1JSIAUV-0627 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7. 5 l Isolation andl l
177620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
l l1JSIBUV-0636 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l SMC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
1 l1JSIAUV-0637 l Limitorque lHPSI Header l
1924/NA lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM lBrottling l
l lY-Globe /2" l
l l
l1500 lb.
l l
l l
l l
l1JSIBUV-0646 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l SMC-00-7.5 l Isolation andl l
177620-2 l
1800 RPM l Throttling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
-B9-
I PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT i 1 l
l Valve Number l l
l l
l Manufacturer l Valve l
l Maximum l
l
.Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PS1D): l l Body Rating l
Model RPM l
Function l
Opening / Closing l
l l
l l
l l1JSIAUV-0647 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S NC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM l Throttling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
-B10-
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 2 Valve Number l l
l l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratina l
Model RPM l
Function l
Openina/ Closing l
l l
l l
l l2JCHBHV-0530 l Limitorque lRWT Suction l NA/44 l
lBorg-Warner l S B-1-60 l Isolation l
l 177890-1 l
3455 RPM l
l l
l Gate /20" l
l l
l l300 lb.
l l
l l
l l
l l
l2JCHAHV-0531 l Limitorque IRWT Suction l NA/44 l
lBorg-Warner l S B-1-60 l Isolation l
l l77890-1 l
3455 RPM l
l l
l Gate /20" l
l l
l l300 lb.
l l
l l
l l
l l
l2JSIAUV-0673 l Limitorque l Containment l
57/NA l
lPosi-Seal l
SMB-00-10 l Sump l
l 114336-3 l
1700 RPM l Suction l
l l Butterfly /24"l l Isolation l
l l150 lb.
l l
l l
l l
l l
l2JSIAUV-0674 l Limitorque l Containment l
57/NA l
lPosi-Seal l
SMB-000-5/
l Sump l
l l14336-4 l
1700 RPM l Suction l
l l Butterfly /24"l l Isolation l
l l150 lb.
l l
I l
l l
l l
l l2JSIBUV-0675 l Limitorque l Containment l
57/NA l
lPosi-Seal l SMB-00-10 l Sump l
l l14336 l
1700 RPM l Suction l
l l Butterfly /24"l l Isolation l
l l
l150 lb.
l l
l l
l l
l2JSIBUV-0676 l Limitorque l Containment l
57/NA l
lPosi-Seal l
SMB-000-5/
l Sump l
l l14336-4 l
1800 RPM l Suction l
l l Butterfly /24"l l Isolation l
l
.l l150 lb.
l l
l l
l l
l l
l2JSIAUV-0666 l Limitorque lHPSI Pump l
NA/1945 l
l lBorg-Warner l SMC-04-7.5 lMiniflow l
l l77620-2 l
1800 RPM lRecirc Line l
l lY-Globe /2" l
l Isolation l
l l
]
l1500 lb.
l l
l l
-Bil-I
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 2 l Valve Number I I
I l
l Manufacturer l Valve
.l l
Maximum l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Rating l
Model RPM l
Function l Opening / Closing l
l l
l l
l l
l2JSIBUV-0667 l Limitorque lHPSI Pump l
NA/1966 l
lBorg-Warner l SMC-00-7.5 lMiniflow l
l 177620-2 l
1800 RPM lRectre Line l
l lY-Globe /2" l
l Isolation l
l l1500 lb.
l l
l l
l l
l l
l2JSICHV-0321 l Limitorque l Hot Leg l
1924/NA l
lBorg-Warner l SMC-0-25 l Injection l
l l79530 l 1900 RPM l Flow Control l l
lY-Globe /3" l
l l
l l1500 lb.
l l
l l
l l
l l
l l2JSIDHV-0331 l Limitorque l Hot Leg l
1924/NA l
lBorg-Warner l
SMB-0-25 l Injection l
l l79530 l 1900 RPM l Flow Control l l
lY-Globe /3" l
l l
l l1500 lb.
l l
l l
l l
l l
l l2JSIAHV-0604 l Limitorque l Hot Leg l
1945/NA l
lBorg-Warner l SMB-00-10 l Injection l
l l77910 l
1800 RPM l Flow Control l l
i l Gate /3" l
l l
l l1500 lb.
l l
l l
1 l
l I
l2JSIBHV-0609 l Limitorque l Hot Leg l
1945/NA l
lBorg-Warner l SMB-00-10 l Injection l
l l77910 l
1800 RPM l Flow Control l l
l Gate /3" l
l l
l l1500 lb.
l l
I l
l l
l l
i 12JSIAHV-0698 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner l SMB-0-10 l Isolation l
l l77740 l
1700 RPM l
l l
l Gate /4" l
l l
l l1500 lb.
l l
l l
l l
l l2JSIBHV-0699 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner l SMB-0-10 l Isolation l
l l77740 l
1700 RPM l
l l
l Gate /4" l
l l
l l1500 lb.
l l
l l
-B12-
V PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 2 l Valve Number i l
l l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Rating l Model RPM l
Function l
Opening / Closing l
l l
l l
l l2JSIBUV-0616 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l
1800 RMP lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
1 l
l l2JSIBUV-0617 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l SMC-00-7.5 l Isolation andl l
177620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l 1
1 I
l l2JSIBUV-0626 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l 1800 RPM l Throttling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
l l
l2JSIAUV-0627 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7. 5 l Isolation andl l
l77620-2 l 1800 RPM lBrottling l
l lY-Globe /2" l
l l
l l1500 lb.
I l
l l
l l
l l2JSIBUV-0636 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l1500 lb.
l l
l l
l l
l l2JSIAUV-0637 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
l77620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
l l
l l2JSIBUV-0646 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner ~l S MC-00-7. 5 l Isolation andl l
l77620-2 l 1800 RPM lBrottling l
l lY-Globe /2" l
l l
l l1500 lb.
l l
l l
l l
-B13-
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTDI VALVE DATA
SUMMARY
UNIT # 2 l Valve Number l I
I l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator l
l Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Rating l
Model RPM l
Punction l
Opening / Closing l
l 1
1 I
l l2JSIAUV-0647 l Limitorque lHPSI Header l
1924/NA l
l Borg-Warner l S MC-00-7. 5 l Isolation andl l
l77620-2 l
1800 RPM l Throttling l
l lY-Globe /2" l
l l
l 11500 lb.
l l
l l
4 i
?
-B 14 -
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTEM VALVE DATA
SUMMARY
UNIT # 3 IValve Nisaber I l
l l
l Manufacturer l Valve l
l Mariaua l
l Model I
Operator:
l l
Differential l
l Type / Size l Macufacturer, l Valve l
Pressure (PSID): l l Body Ratina l
Model RPM l
Function l Openina/ Closing l
I I
I I
i 13JCHBHV-0530 l Limitorque IRWT Suction l NA/44 l
lBorg-Warner l S B-1-60 l Isola tion l
l 177890-1 l
3455 RPM l
l l
Icate/20" l
I I
I 1300 lb.
I l
l l
l 1
I i
l 13JCHAHV-0531 l Limitorque IRWT Suction l
NA/44 l
u lBorg-Warner i S B-1-60 l Isolation l
l 177890-1 l
3455 RPM i
l l
Icate/20" i
I I
i 1300 lb.
l I
l l
l l
l 1
1 13JSIAW-0673 i Limitorque IContainment l
57/NA I
lPosi-Seal l SMB-00-10 ISusp l
l 114336-3 l
1700 RPM l Suction l
l l Butte rfly/24"l l Isolation l
l 1150 lb.
I l
l i
I I
I I
l 13JSIAW-0674 l Limitorque l Containment l
57/NA l
lPos1-Seal i SMB-000-5/
ISump l
l 114336-4 l 1700 RPM ISuetion l
l l Butterfly /24"l l Isolation l
l 1150 lb.
l l
l l
l I
I I
i 13JSIBW-0675 l Limitorque Icontainment l 57/NA l
lPosi-Seal l SM B-00-10 ISusp l
l 114336 l
1700 RPM l Suction l
l l Butterfly /24"l l Isola tion l
l 1150 lb.
l l
l l
l 1
I I
I 13JSIBW-0676 l Limitorque Icontainment l
57/NA l
lPosi-Seal l SMB-000-5/
lSusp l
l 114336-4 l
1800 RPM lSuetion l
l l Butte rfly/24"l l Isolation l
l l150 lb.
l l
l l
l 1
1 I
i 13JSI AW-0666 l Limitorque lHPSI Pump l
NA/1945 l
lBorg-Warner i S MC-04-7.5 lMiniflow l
l 177620-2 l
1800 RPM lRectre Line l
l lY-Clobe/2" l
l Isola tion l
l 11500 lb.
l l
l l
-815-
PVNGS HIGH PRESSURE SAFEfY INJECTION SYSTDi VALVE DATA
SUMMARY
UNIT # 3 J
l Valve Number l l
l l
l Manufacturer i Valve l
l Maximum l
l Model l
Operator:
l l
Differectial l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratina l Model RPM l
Function i
Opening / Closing i
l l
I I
l 13JSIBUV-0667 l Limitorque lHPSI Pump l
NA/1966 l
lBorg-Warner i S MC-00-7.5 lMiniflow l
l 177620-2 l
1800 RPM lRecire Line l l
lY-Globe /2-l l Isolation l
l 11500 lb.
l l
l l
1 1
I I
i 13JSICHV-0321 l Limitorque lHot Leg l
1924/NA l
lBorg-Warner i SMC-0-25 l Injection l
l 179530 l
1900 RPM l Flow Control l I
lY-Globe /3" l
l l
l 11500 lb.
l l
l l
l l
l l
l 13JSIDHV-0331 l Limitorque lHot Leg l
1924/NA l
lBorg-Warner l
SM B-0-25 IInjection l
l 179530 1
1900 RPM lFlow Control I l
lY-Globe /3-l l
1 l
11500 lb.
l l
l l
1 1
I I
i 13JSIAHV-0604 l Limitorque lHot leg i
1945/NA l
lBorg-Warner l SM B-00-10 l Injection l
l 177910 l
1800 RPM l Flow Control l l
Ica te/3-1 I
I l
l1500 lb.
l l
l l
l l
l l
l 13JSIBHV-0609 l Limitorque IHot 14g l
1945/NA l
l Bo rg-Wa rne r l
SM B-00-10 IInjection l
l 177910 l
1800 RPM l Flow Control l i
Icate/3-1 I
I I
11500 lb.
l l
l l
l l
l l
l 13JSI AHV-0698 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner l SMB-0-10 l Isolation l
l 177740 1
1700 RPM i
l l
lcate/4-1 I
I I
l1500 lb.
l l
l l
l 1
I I
i 13JSIBHV-0699 l Limitorque lHPSI Train l
1100/NA l
lBorg-Warner I SMB-0-10 l Isolation I
l.
177740 l
1700 RPM l
l l
Icate/4-1 I
I I
l1500 lb.
l l
l 1
-B16-
c PVNGS HIGH PRESSUk2 SAFETY INJECTION SYSTD( VALVE DATA
SUMMARY
UNIT # 3 l Valve Number l l
l l
l Manufacturer l
'laive l
l Maximum l
l Model l
Operator:
l I
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratina l Model RPM l
Function l Openina/Closina l
l I
I I
l 13JSIBUV-0616 l Limitorque lHPSI Header l 1924/NA l
lBorg-Warner I S MC-00-7. 5 IIsolation andl l
177620-2 l
1800 RMP lhrottling i
l lY-Globe /2" l
l l
l 11500 lb l
l l
l l
l l
l l
13JSIBUV-0617 l Limitcrque lHPSI Header l 1924/NA l
lBorg-Warner l S NC-00-7.5 l Isolation andl 1
177620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l 11500 lb.
l l
l l
l 1
I I
i 13JSIBUV-0626 l Limitorque lHPSI Header l 1924/NA l
lBorg-Warner l SMC-00-7.5 lIsolatio'n andl l
177620-2 l
1800 RPM lhrottling l
l lY-Clobe/2" l
l l
l 11500 lb.
l l
l l
l l
I I
i 13JSI AW-0627 l Limitorque lHPSI Header l 1924/NA l
lBorg-Warner l S MC-00-7.5 l Isolation andl l
177620-2 l
1800 RPM lBrottling l
l lY-Globe /2" l
l l
l 11500 lb.
l l
l l
l I
I I
(2JSIBUV-0636 l Limitorque lHPSI Header l
1924/NA l
lBorg-Warner l
SMC-00-7,5 l Isolation andl l
177620-2 l
1800 RPM lhrottling l
l lY-Clobe/2" l
l l
l 11500 lb.
l l
l l
j l
13JSIAUV-0637 l Limitorque
'HPSI Hender ll 1924/NA IBorg-Warner l S MC-00-7.5 IIsolation andl l
177620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
I l1500 lb.
l l
I I
I I
i l
13JSIBUV-0646 l Limitorque lHPSI Header l 1924/NA l...
IBorg-Warner l SMC-00-7.5 IIsolation andl l1 177620-2 l
1800 RPM lhrottling l
l lY-Globe /2" l
l l
l 11500 lb.
l I
l l
-B17-
PVNGS HIGH PRESSURE SAFETY INJECTION SYSTDI VALVE DATA
SUMMARY
UNIT f 3 l Valve Number i l
l l
l Manufacturer l Valve l
l Maximum l
l Model l
Operator:
l l
Differential l
l Type / Size l Manufacturer, l Valve l
Pressure (PSID): l l Body Ratima l
Model RPM l
Punction l
Opening / Closing l
l 1
1 I
I l3JSIAUV-0647 l Limitorque lHPSI Header l 1924/NA l
l Borg-Warner l
SNC-00-7.5 IIsolation andl l
177620-2 l
1800 RPM l Throttling l
l lY-Globe /2" l
l l
l 11500 lb.
l l
l l
I 1
-B18-