ML20202D868

From kanterella
Jump to navigation Jump to search
Forwards non-proprietary & Proprietary Responses to 971112 RAI Re Amend Application.Proprietary Responses Withheld
ML20202D868
Person / Time
Site: Framatome ANP Richland
Issue date: 11/21/1997
From: Edgar J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19317C740 List:
References
JBE:97:169, NUDOCS 9712050174
Download: ML20202D868 (3)


Text

- -.-

~ SIEMENS

\\

i November 21,1997 i

JBE:97:169 U.S. Nuclear Regulatory Commission 3

Attn: Mr. M.F. Weber, Chief i

j Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Washington, DC 20555 i;

4M ~ &

y p

Dear Mr. Weber:

Tgge 0%$

l

Subject:

Response to LUR/SPF RAI Qi}q

.~.

'y Ref:

Letter, K. J. Hardin to L. J. Maas, " Request for Additienal Information, j

Amendment Application dated July 30,1996 and Request for Additional,

pfQ s

N ijg_

l Information Responses dated January 28,1997 (TAC No. L30929)", dated

p6pl, November 12,1997.

Attached are Siemens Power Corporation's (SPC's) responses to the referenced R,M. You will note that pages 2 through 7 of the attachment contain process information proprietary to SPC.

An affidavit to that effect is enclosed.

I If you have questions or require additionalinformation, please call me on 509-375-86C3.

Very truly yo;rs, l

T s B. Edgar l

Staf f Engineer, Licensing r

I

/*'\\&

i l

l

/pg

\\

Enclosures 4

j cc:

NRC Region IV Walnut Creek Field Office 3

l j

NRC - Region IV j

Arlington, TX s-

(((((({h' {)kh,,k l!! 97120S0174 971121 ~ PDR ADOCK 07001257 i l C PDR siemens 7 ower corporation i Nuclear Division 21o1 Horn Rapeds Road Te!; (509)375 8100 f Enginoenng & Manuf actunng P.o. Box 13o Fax: (509) 375 84o2 1, RicNand, W A 99352 013o AR1 I I s'*.3f h bY ,h .l ~.

~ L. l' Affid:vit cf R.ymond E. Vaughan 'I, Raymond E. Vaughan, being first duly sworn, depose and says:

1. = 1 am Manager, Safety, Security & Licensing of Siemens Power Corporation -

Nuclear Division, a corporation duly organized and existing under and by virtue of the laws of the State of Deleware, with offices at 2101 Horn Rapids Road, City - of Richland, County of Benton, State of Washington, and on whose behalf I make this affidavit. l

2. I am familiar with the contents of pages 2 through 7 of the attachment to the November 21,1997 letter, " Response to LUR/SPF RAl" from Siemens Power

. Corporation Nuclear Division to the U.S. Nuclear Regulatory Commission. This information: (i) har been held in confidence by Siemens Pcwer Corporation - Nuclear Division pursuo :t to its ir.ternal pohcies, (ii) is presented to the U.S. Nuclear Regulatory ' Commission in confideace, (iii) is not available from public sources, (iv) is of a type normally held in confidence by Siemens Power Corporation - Nuclear Division;'and (v) if publicly disclosed would likely cause substantial harm to Siemens Power Corporation Nuclear Division's competitive position. I am authorized to make the statements that are set forth herein and in the above-mentioned letter on behalf of Siemens Power Corporation - Muclear Division and tFe statements made in this affidavit and said document are, to the best of my knowledge, information and belief, truthful cnd complete. / Siemens Power Corporation - Nucloar Division f 1 By: w k, -ud Raym n .Vaughan Man

r.. afety, Sect' ity & LiceIiUna Title o b, lm

'Dat.1 State of Washington SS County of Benton C ~ - Raymond E. Vaughan personally appeared before me known or proved to me to be. the same person who executed the foregoing it'strument and to be the Manager, ,3 Safety, Security & Licensing of Siemens Power Corporation - Nuclear Division and ~ _ - . acknowledged to me that he executed the same as bis free act and deed and the free act and deed of Siemens Power Corporation - Nuclear Division. Subscribed and sworn to before me this // day of 7hd/Ahtd)1997. lJa 177au/wiL ~ (/ Jackib J. Marshall I Notary Public 1/01/9y My Corfimission Expires

i Siemens Response to NRC RAI Dated 11/12/97 NBC ReayAs 1a) - According to material safety data sheets, sodium hydrosulfite is a flammab% solid and is reactive with small amounts of water. What safety measures are taken when handling - or using sodium hydrosulfite to protect the worker and prevent any undesired reactions? SPC Response la) -While handling the dry sodium hydrosulfite the operator will wear respiratory protection, gloves, and goggles as specified per the material safety data sheet. Many other. protective measures are taken when using this chemical. Sodium hydrosulfite is packaged 'in plastic lined water-tight 220 lb cans, stored in a weather proof chemical storage building equipped with a heat detector, kcpt away from water sources and incompatible chemicals, .and handled in areas having good obtdoor ventilation. A safety shower and cye wash station are provided at the SPF building 30 feet away if needed. To avoid the reaction between dry sodium hydrosulfite and small. amounts of water, the solution is made up by i edding dry sodium hydrosulfite to a large amount of water instead of vice versa. . NRC Reauest 2a) The lagoon uranium recovery (LUR) pr* cessing equipment building enclosure is - described in this section. Will fumes or offgas be generated when using sodium hydrosulfite? If so, how are fumes handled? L SPC Resoonse - 2a) Sulfur dioxide' odors may be detected during aqueous make-up of the sodium _ hydrosulfite solution. This is done in a separate non radioactive chemical make-up room which has good outdoor ventilation through large roll up doors. Dry sodium hydrosulfite is added to 50 gallons of water. The batch of solution is then pumped into a 6000 gallon LUR tank located in the radioactive area at about 1 volume percent. The LUR tanks and building are HEPA filter ventilated with a 2000 cfm building exhauster and 10,000_cfm air recirculation system. Tc date, no sulfur dioxide or odors have been detected at the LUR tankt.due to the low concentration of sodium hydrosulfite.' Industrial hygiene (IH) personnel monitor levels of toxic gases generated during each chemical handling step to establish the appropriate level of protective equipment needed consistent with the MSDS. Any changes to an operation requires an lH evaluation and sampling. NRC Regg.n

2b) What is the concentration of sodium hydrosulfite used and stored onsite? Are any

~ -other chemicals used in the LUR process? 'If so, list where they are used, the concentration the method of storage, and whether or not the chemicals come in contact with uranir.1.- [ .}}