Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202J085 + (07:20:22, 8 December 2024)
- ML20202J083 + (07:20:22, 8 December 2024)
- 05000295/LER-1986-007-04, :on 860307,while in Normal Operation at 99% Power,Containment Isolation EIIS Sys Bd Valve LAOV-IA01A Closed,Isolating Instrument Air EIIS Sys Ld to Containment. Caused by Misadjusted Relay + (07:20:24, 8 December 2024)
- ML20202J081 + (07:20:25, 8 December 2024)
- ML20202J080 + (07:20:25, 8 December 2024)
- ML20202J079 + (07:20:26, 8 December 2024)
- ML20202J078 + (07:20:26, 8 December 2024)
- 05000321/LER-1986-013, :on 860305,w/unit in Refueling Mode & During Hydrostatic Test on RWCU Filter/Demineralizer B,Rwcu Sys Isolation Occurred.Cause Undetermined.No Corrective Actions Planned + (07:20:28, 8 December 2024)
- ML20202J073 + (07:20:30, 8 December 2024)
- ML20202J071 + (07:20:31, 8 December 2024)
- ML20202J072 + (07:20:31, 8 December 2024)
- ML20202J069 + (07:20:32, 8 December 2024)
- ML20202J068 + (07:20:33, 8 December 2024)
- 05000423/LER-1986-022, :on 860308,while Operating at 30% Power,Two Independent Channels of Steam Generator a Steam Line Pressure Found Failed High Due to Frozen Sensing Lines on Pressure Transmitters.Heat Tracing Reinstalled + (07:20:34, 8 December 2024)
- ML20202J066 + (07:20:35, 8 December 2024)
- ML20202J065 + (07:20:36, 8 December 2024)
- ML20202J060 + (07:20:42, 8 December 2024)
- ML20202J057 + (07:20:42, 8 December 2024)
- ML20202J055 + (07:20:43, 8 December 2024)
- ML20202J053 + (07:20:44, 8 December 2024)
- ML20202J049 + (07:20:45, 8 December 2024)
- ML20202J052 + (07:20:45, 8 December 2024)
- ML20202J040 + (07:20:47, 8 December 2024)
- ML20202J038 + (07:20:48, 8 December 2024)
- 05000389/LER-1986-005-02, :on 860310,discovered That Time Limit for Performance of Semiannual ESF Sys Relay Surveillance Exceeded.Caused by Failure to Assign Tracking Responsibility to Any Dept.Operations Dept Assigned Tracking + (07:20:54, 8 December 2024)
- ML20202J033 + (07:20:55, 8 December 2024)
- ML20202J032 + (07:20:56, 8 December 2024)
- ML20202J031 + (07:20:57, 8 December 2024)
- ML20202J026 + (07:20:58, 8 December 2024)
- ML20202J027 + (07:20:58, 8 December 2024)
- 05000482/LER-1986-014, :on 850731 & 860313,hourly Patrols of Fire Dampers Not Performed,Violating Tech Spec 3.7.11.Caused by Personnel Error.Patrols Reestablished & Rept Added to Reading List + (07:21:05, 8 December 2024)
- ML20202J023 + (07:21:06, 8 December 2024)
- ML20202J022 + (07:21:06, 8 December 2024)
- ML20202J021 + (07:21:07, 8 December 2024)
- ML20202J019 + (07:21:08, 8 December 2024)
- ML20202J018 + (07:21:08, 8 December 2024)
- ML20202J016 + (07:21:09, 8 December 2024)
- IR 05000312/1986008 + (07:21:11, 8 December 2024)
- ML20202J013 + (07:21:13, 8 December 2024)
- ML20202J012 + (07:21:13, 8 December 2024)
- ML20202J011 + (07:21:14, 8 December 2024)
- ML20202J008 + (07:21:15, 8 December 2024)
- ML20202J009 + (07:21:15, 8 December 2024)
- NPL-98-0099, Forwards Response to Violations Noted in Insp Repts 50-266/97-25 & 50-301/97-25.Corrective Actions:Remainder of Facade Freeze Protection Sys Evaluated & Preliminary Results Indicate That Several Addl Functions Should Be Added + (07:21:16, 8 December 2024)
- 05000457/LER-1997-005-08, :on 971106,relief Valve 2SI8851 Lifted & Failed to Reseat.Caused by Limited Margin Between Pump Start Pressure Transient & Valve Lift Setpoints.Replaced Failed Relief Valves W/New Valves & Performed Testing + (07:21:18, 8 December 2024)
- ML20202J004 + (07:21:19, 8 December 2024)
- ML20202J003 + (07:21:20, 8 December 2024)
- ML20202H999 + (07:21:20, 8 December 2024)
- 05000324/LER-1986-009, :on 860311,upscale Spike of Reactor Bldg Ventilation Exhaust Radiation Monitor Instrument Trip Unit Occurred.Cause Not Determined.Trip & Isolation Signals Reset & Sys Returned to Svc + (07:21:25, 8 December 2024)
- ML20202H995 + (07:21:30, 8 December 2024)
- TXX-4753, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305.Gibbs & Hill Directed to Determine Adequacy of Calculations + (07:21:31, 8 December 2024)