Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-98-0043, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-13 & 50-325/97-13.Corrective Actions:Established Controls to Ensure safety-related Clearances Are Maintained as QA Records IAW Site Procedures & Counseled Personnel + (06:43:58, 8 December 2024)
- ML20203C701 + (06:43:58, 8 December 2024)
- ML20203C700 + (06:43:59, 8 December 2024)
- ML20203C696 + (06:44:00, 8 December 2024)
- ML20203C693 + (06:44:00, 8 December 2024)
- ML20203C690 + (06:44:01, 8 December 2024)
- ML20203C689 + (06:44:02, 8 December 2024)
- NOC-AE-000391, Requests NRC Authorization to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).STP Previously Requested Approval to Incorporate risk-informed Criteria in ISI & IST Programs.Relief Request RR-17 Encl + (06:44:02, 8 December 2024)
- 05000353/LER-1997-010-01, :on 971107,reactor Vessel Flux Wire Specimen Analysis Was Not Performed IAW TS SR 4.4.6.1.4.Caused by Incomplete Surveillance Tp.Engineering Evaluation Was Performed,Including 10CFR50.59 Review + (06:44:04, 8 December 2024)
- PY-CEI-NRR-0451, Forwards Weston Geophysical Seismological & Geological Investigations of 860131 Leroy,Oh Earthquake, Progress Rept,Per .Addl Repts of Results of Ongoing Programs Will Be Provided on Monthly Basis + (06:44:05, 8 December 2024)
- ML20203C682 + (06:44:07, 8 December 2024)
- ML20203C683 + (06:44:07, 8 December 2024)
- ML20203C679 + (06:44:11, 8 December 2024)
- RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear + (06:44:12, 8 December 2024)
- PNO-V-86-016, on 860407,State of Wa Informed Region That One Drum in 860403 Radwaste Shipment from Facility Had Hole in Side.Util Barred from Use of Burial Site.Burial Permit 2280 Suspended Effective on 860404 + (06:44:13, 8 December 2024)
- NOC-AE-000411, Confirms That Corrective Actions Addressing Use of Thermo- Lag Have Been Completed in Both Units,Per GL 92-08.Listed Corrective Actions Were Implemented as of End of 1998 + (06:44:13, 8 December 2024)
- 05000353/LER-1997-010, Forwards LER 97-010-00,which Describes Condition Prohibited by TS in That Reflex Wire Specimen from Unit 2 Was Not Examined to Determine RPV Fluence IAW TS Surveillance Requirement 4.4.6.1.4 + (06:44:14, 8 December 2024)
- ML20203C661 + (06:44:15, 8 December 2024)
- ML20203C657 + (06:44:16, 8 December 2024)
- ML20203C654 + (06:44:17, 8 December 2024)
- ML20203C656 + (06:44:17, 8 December 2024)
- ML20203C651 + (06:44:18, 8 December 2024)
- PNO-I-91-074, on 911030,radioactive Matl Spill Involved Tritium H-3.Licensee Continues to Perform Bioassays (Urinalysis) of Potentially Exposed Individuals.Currently Evaluating Results of bioassays.H-3 Intake Was Minimal + (06:44:18, 8 December 2024)
- ML20203C649 + (06:44:19, 8 December 2024)
- ML20203C648 + (06:44:20, 8 December 2024)
- ML20203C647 + (06:44:21, 8 December 2024)
- GO2-86-643, Application for Amend to License NPF-21,changing Safety/ Relief Valve Setpoint Capabilities from +/-1% to +1%/-3% Based on GE Reanalysis Using Odyn Code.List of Justifications Encl.Fee Paid + (06:44:25, 8 December 2024)
- ML20203C641 + (06:44:25, 8 December 2024)
- ML20203C637 + (06:44:26, 8 December 2024)
- 05000250/LER-1986-025, :on 860612,Tech Spec 3.6.d.1 for Charging Pump Operability Exceeded.Caused by Cracked Weld on Discharge Line Due to Sys Vibration.Charging Pump Overhauled in Accordance W/Maint Procedures + (06:44:28, 8 December 2024)
- PNO-V-91-031, on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed + (06:44:29, 8 December 2024)
- BECO-86-047, Submits Addl Info Re Second 10-yr Inservice Insp Program for Facility,In Response to NRC 860106 Request.Encl a Shows 21 full-penetration Nozzles for Which Relief Requested Located within Biological Shield + (06:44:30, 8 December 2024)
- ML20203C631 + (06:44:30, 8 December 2024)
- IR 05000213/1986005 + (06:44:32, 8 December 2024)
- RBG-23-991, Forwards Rev 1 to Description of Changes to Initial Test Program ST-30D Originally Submitted on 860528 + (06:44:32, 8 December 2024)
- ML20203C620 + (06:44:33, 8 December 2024)
- PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter + (06:44:33, 8 December 2024)
- ML20203C617 + (06:44:34, 8 December 2024)
- PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core + (06:44:36, 8 December 2024)
- ML20203C616 + (06:44:36, 8 December 2024)
- ML20203C611 + (06:44:37, 8 December 2024)
- ML20203C613 + (06:44:37, 8 December 2024)
- BSEP-86-0474, Responds to Violations Noted in Insp Repts 50-324/86-07, 50-325/86-07,50-324/86-08 & 50-325/86-08.Corrective Actions: Rev Issued to Plant Mod to Ensure That Proper Spec Ref + (06:44:38, 8 December 2024)
- ML20203C609 + (06:44:38, 8 December 2024)
- ML20203C607 + (06:44:39, 8 December 2024)
- ML20203C603 + (06:44:42, 8 December 2024)
- B16924, Notifies NRC That NNECO Has Projected Readiness for Performance of ICAVP CA Implementation Insp of Millstone Unit 3 to Be 980223 + (06:44:43, 8 December 2024)
- ML20203C601 + (06:44:43, 8 December 2024)
- PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg + (06:44:44, 8 December 2024)
- ML20203C598 + (06:44:47, 8 December 2024)
- ML20203C596 + (06:44:48, 8 December 2024)
- ML20203C593 + (06:44:49, 8 December 2024)