Forwards Updated Listing of Items of Correspondence W/Nrc to Which Written Response Expected.Nrc Efforts to Complete Licensing Action on Submittals Re Fire Detectors,Reactor Vessel Matl Surveillance & Generic Ltr 83-28 Ack
ML20203C603
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/09/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
GL-83-28, SL-975, NUDOCS 8607210037
Download: ML20203C603 (4)


Text

_

Georeia Fower Company 333 Piedmont Avenue Atlanta, Gearg:a 30308 Telephone 404 526-6526 Mailing Address:

Fbet Office Box 4545 Atlanta, Georgia 303C2 Georgia Power L. T. Gucwa tre souttwm deanc sprom Manager Nuclear Safety and Licensing 0411C July 9,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST i

Gentlemen:

Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response is expected.

The enclosure is tabulated chronologically by Georgia Power Company's submittal date.

Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you might have 1

regarding these licensing issues.

Georgia Power Company acknowledges and appreciates the recent NRC J

efforts to complete licensing action on our submittals related to:

fire detectors, reactor vessel material surveillance, generic letter 83-28, ADS logic, and reactor water level instrumentation.

If you have further questions, please contact this office at any time.

Sincerely, e607210037 e607 g DR ADOCK 0000 L. T. Gucwa MJBlackwood/lc Enclosure c: Georria Power Company Nuclear Regulatory Commission Mr.t. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.

Senior Resident Inspector f (I Mr. H. C. Nix, Jr.

GO-NORMS

]

5 I

Pcga No.

1 07/09/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT i

DATE-1 O APPROVAL.OF ITEM REQUIRED FOR UPCOMING OUTAGE i

C ITEM CLOSED SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 01/26/77 321 PROPOSED CHANGES TO INTEGRATED LEAK RATE TESTING 08/30/77 321 PROPOSED TECHNICAL SPECIFICATIONS - ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CASK 10/03/78 321 PROPOSED TECHNICAL SPECIFICATIONS - CHANGE PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS OF D/G 1B j

03/05/79 321 PROPOSED TECHNICAL SPECIFICATIONS - REMOVE REFERENCE TO i

OUTDATED VERSION OF APPENDIX J l

09/27/82 366 PROPOSED TECHNICAL SPECIFICATIONS - BUILDING SETTLEMENT SURVEILLANCE - SUBMIT UPDATED TABLE 04/15/83 321,366 GENERIC LETTER 82 REQUIREMENTS FOR EMERGENCY RESPONSE CAPABILITY 04/23/84 366 PROPOSED TECHNICAL SPECIFICATIONS - ATWS RPT LCO CLARIFICATIONS i

09/05/84 366 PROPOSED TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION OF PURGE AND VENT ON HI RAD 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 1

i 09/19/84 366 FRACTURE MECHANICS ANALYSIS PER GENERIC LETTER 81 1 FEEDWATER NOZZLE J

11/09/84 321,366 DIESEL GENERATOR TECHNICAL SPECIFICATIONS i

01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT l

SYSTEM. STAINLESS STEEL PIPE 01/17/85 321 C PROPOSED FIRE PROTECTION TECHNICAL SPECIFICATIONS -

MODIFICATION TO THE NUMBER AND LOCATION OF' FIRE DETECTORS -

CONTROL ROOM, LPCI INVERTER ROOM i

05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING

]

06/03/85 321,366 C REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 l SALEM EVENT - SCRAM BREAKER FAILURE - SECTION 2.1 PART 1 k

--a

.a-.,+

--a..

a a

s<

a-x-.

-x s

a a._-

-4

)

i f.

Pega No.

2 07/09/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC f

LETTER UNIT SUBJECT DATE j

06/25/85 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 1

)

07/26/85 321 REQUEST TO REVISE TECHNICAL SPECIFICATIONS -' ADD j

SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS i

08/20/85 321 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR HIGH RADIATION ISOLATION OF PURGE AND VENT VALVES - DOCR 85-20 09/13/85 321,366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SCRAM DISCHARGE j

VOLUME VENT AND DRAIN VALVE CLOSURE TIME i

01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE CONTROL i

BUILDING CO2 FIRE SUPPRESSION SYSTEM - DOCR 85-16 01/06/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE FIRE I

HOSE STATIONS FROM TABLE DOCR 85-14 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON J

SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSUKE TIME

)

}

01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS i

01/07/86 321 C APPENDIX G AND H TECHNICAL SPECIFICATIONS - REACTOR PRESSURE i

VESSEL MATERIAL SURVEILLANCE CAPSULES AND FRACTURE TOUGHNESS ANALYSIS 01/07/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF. PURGE AND VENT ON HIGH RADIATION SIGNAL 1

l 01/27/86 321,366 REVISION TO GASEOUS EFFLUENT TECHNICAL SPECIFICATIONS -

SAMPLING REQUIREMENTS AFTER A POWER LEVEL CHANGE, TRITIUM 01/31/86 321,366 C GENERIC LETTER 83 SALEM ATWS - CLOSURE OF ITEMS 3.1.3 AND 3.2.3 i

l 02/07/86 321,366 RFAI INSERVICE INSPECTION PROGRAM l

l

-02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION l

- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, j

ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, l

QA RECORDS,, DELETE EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366 C SCHEDULE FOR ADS LOGIC MODIFICATIONS - MANUAL INHIBIT SWITCH j

AND HIGH DRYWELL PRESSURE PERMISIVE l

i i

I Paga No.

3 07/09/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT q

i 03/03/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION SYSTEM LISTING CORRECTIONS 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83-08 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 04/04/86 366 REITERATION OF PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 04/15/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - FUEL STORAGE REQUIREMENTS, FUEL ASSEMBLY DESIGN, MAPLHGR LIMITS, ROD WORTH MINIMIZER, ROD SEQUENCE CONTROL, BANKED POSITION WITHDRAWAL SEQUENCE, EDITORIAL CHANGES 05/14/86 321,366 IE BULLETIN 85 MOTOR OPERATED VALVE COMMON MODE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS 05/15/86 321,366 C CHANGE OF SCHEDULE - REACTOR WATER LEVEL INSTRUMENTATION -

GENERIC LETTER 84-23 05/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS 05/16/86 321,366 EXEMPTION REQUESTS - APPENDIX R 06/20/86 321,366 N CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE I

.