Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204D249 + (01:27:42, 8 December 2024)
- ML20204D244 + (01:27:43, 8 December 2024)
- ML20204D238 + (01:27:44, 8 December 2024)
- IR 05000364/1978016 + (01:27:45, 8 December 2024)
- ML20204D231 + (01:27:45, 8 December 2024)
- ML20204D227 + (01:27:46, 8 December 2024)
- ML20204D226 + (01:27:47, 8 December 2024)
- ML20204D224 + (01:27:48, 8 December 2024)
- ML20204D220 + (01:27:48, 8 December 2024)
- ML20204D219 + (01:27:49, 8 December 2024)
- ML20204D213 + (01:27:50, 8 December 2024)
- ML20204D209 + (01:27:51, 8 December 2024)
- IR 05000352/1978007 + (01:27:52, 8 December 2024)
- ML20204D198 + (01:28:00, 8 December 2024)
- ML20204D197 + (01:28:01, 8 December 2024)
- ML20204D191 + (01:28:01, 8 December 2024)
- ML20204D190 + (01:28:02, 8 December 2024)
- ML20204D189 + (01:28:03, 8 December 2024)
- ML20204D183 + (01:28:07, 8 December 2024)
- 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With + (01:28:09, 8 December 2024)
- ML20204D171 + (01:28:10, 8 December 2024)
- HL-5757, Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 990127 + (01:28:11, 8 December 2024)
- ML20204D162 + (01:28:12, 8 December 2024)
- ML20204D160 + (01:28:12, 8 December 2024)
- ML20204D158 + (01:28:13, 8 December 2024)
- ML20204D147 + (01:28:14, 8 December 2024)
- ML20204D136 + (01:28:15, 8 December 2024)
- NOC-AE-000396, Supplemental Application for Amends to Licenses NPF-76 & NPF-80,relocating TS 3/4.7.9 for Snubbers to TRM + (01:28:16, 8 December 2024)
- ML20204D134 + (01:28:17, 8 December 2024)
- ML20204D129 + (01:28:18, 8 December 2024)
- 05000271/LER-1998-026, :on 981124,inadequate Equipment Control Resulted in Reduced HPCI Sys Reliability.Caused by Valve Being Out of Position.Completed Pressure Switch Calibration. with + (01:28:20, 8 December 2024)
- L-87-132, Recorded Annual Whole Body Exposure for CY86 + (01:28:22, 8 December 2024)
- ML20204D120 + (01:28:22, 8 December 2024)
- ML20204D095 + (01:28:24, 8 December 2024)
- ML20204D090 + (01:28:25, 8 December 2024)
- ML20204D087 + (01:28:26, 8 December 2024)
- ML20204D084 + (01:28:27, 8 December 2024)
- 05000352/LER-1999-001-02, :on 990217,old Rev of LGS PSP Was Discovered on Hard Drive of self-contained Computer in Security Ofc Area. Caused by Less than Adequate Ac.Security Force Was Placed on Heightened Awareness to Compensate for Compromise of SG + (01:28:29, 8 December 2024)
- ML20204D076 + (01:28:30, 8 December 2024)
- ML20204D081 + (01:28:30, 8 December 2024)
- ML20204D074 + (01:28:31, 8 December 2024)
- ML20204D070 + (01:28:32, 8 December 2024)
- 05000327/LER-1987-014, :on 870217,boron Injection Tank Heaters Found Not Verified Operable Every 31 Days.Caused by Procedural inadequacy.SI-16 Revised + (01:28:34, 8 December 2024)
- ML20204D067 + (01:28:36, 8 December 2024)
- ML20204D061 + (01:28:37, 8 December 2024)
- ML20204D053 + (01:28:38, 8 December 2024)
- ML20204D057 + (01:28:38, 8 December 2024)
- ML20204D047 + (01:28:39, 8 December 2024)
- ML20204D043 + (01:28:40, 8 December 2024)
- ML20204D036 + (01:28:41, 8 December 2024)
- NRC-99-0031, Forwards Monthly Operating Rept for Feb 1999 for Fermi 2,per Reg Guide 1.16 & Plant TS 6.9.1.6.Gross & Net MDC Values Were Revised as Result of Increase in Reactor Power,Per 990121 Authorized Power Ascension to 97% Reactor Power + (01:28:42, 8 December 2024)