Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204F170 + (01:16:19, 8 December 2024)
- ML20204F169 + (01:16:19, 8 December 2024)
- ML20204F167 + (01:16:20, 8 December 2024)
- ML20204F168 + (01:16:20, 8 December 2024)
- ML20204F166 + (01:16:21, 8 December 2024)
- ML20204F163 + (01:16:22, 8 December 2024)
- ML20204F165 + (01:16:22, 8 December 2024)
- IR 05000412/1987012 + (01:16:24, 8 December 2024)
- ML20204F157 + (01:16:25, 8 December 2024)
- ML20204F158 + (01:16:25, 8 December 2024)
- ML20204F154 + (01:16:27, 8 December 2024)
- ML20204F153 + (01:16:27, 8 December 2024)
- ML20204F151 + (01:16:28, 8 December 2024)
- ML20204F149 + (01:16:28, 8 December 2024)
- ML20204F148 + (01:16:31, 8 December 2024)
- ML20204F147 + (01:16:32, 8 December 2024)
- PNO-I-80-156, on 801021,plant Superintendent Issued Court Summons to Respond to Concerns of Rowe Nuclear Conversion Campaign.Util Also Notified That Application for Preliminary Injunction & Temporary Restraining Order Had Been Filed + (01:16:33, 8 December 2024)
- ML20204F146 + (01:16:33, 8 December 2024)
- ML20204F144 + (01:16:34, 8 December 2024)
- ML20204F140 + (01:16:36, 8 December 2024)
- ML20204F141 + (01:16:36, 8 December 2024)
- PNO-I-80-095, on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny + (01:16:37, 8 December 2024)
- PNO-I-80-157, on 801023,well Logging Source Containing 1500 Mci Cs-137 Lost at Depth of 3,700 Ft in Franklin Township, Pa.Retrieval Unsuccessful.Hole Will Be Sealed & Placarded If Addl Recovery Attempts Fail + (01:16:37, 8 December 2024)
- ML20204F136 + (01:16:38, 8 December 2024)
- PNO-I-80-135, on 800924,both Containment Spray Pumps Discovered in pull-to-lock Position After Tagging by Operators Per Containment Entry Procedure.Switches Returned to Automatic Position & Change to Procedure Initiated + (01:16:39, 8 December 2024)
- ML20204F130 + (01:17:01, 8 December 2024)
- ML20204F129 + (01:17:02, 8 December 2024)
- PNO-IV-82-026, on 820702,worker Unloading Injection Tool Containing 1.15 Mci I-131 Accidentally Released Liquid Onto Clothing & Body.Possibility of Significant Uptake Minimal. Thyroid Scan Scheduled for 820707 + (01:17:02, 8 December 2024)
- ML20204F125 + (01:17:03, 8 December 2024)
- PNO-V-80-081, on 801222,while Installing Gas Monitor at 100% Power,Auxiliary Bldg Stack,Control Room & Condenser Air Ejector Radiation Monitoring Sys Alarmed & Pegged High. Caused by Wide Swings in Movement of Common Ac Power Lead + (01:17:04, 8 December 2024)
- ML20204F123 + (01:17:04, 8 December 2024)
- PNO-IV-82-022, on 820528,licensee Reported Theft of Moisture Gauge Containing 50 Mci Cs-137 & 50 Mci Am-241 from Facility.Local Police,Fbi & UT Health Dept Notified + (01:17:09, 8 December 2024)
- PNO-II-80-150, on 801013,during Routine Check of Unit 2 Containment Purge Valve 5,purge Path Opened to Environ for 46 S.Caused by Failure to Follow Procedures in Proper Sequence.No Tech Spec Limits Exceeded.State of Sc Informed + (01:17:10, 8 December 2024)
- ML20204F116 + (01:17:11, 8 December 2024)
- ML20204F114 + (01:17:14, 8 December 2024)
- PNO-IV-82-035, on 821004,radiographer & Assistant Received Estimated Whole Body Exposure of 10 Rem After Failure to Detect That 60 Ci Ir-192 Source Had Not Been Returned to Shielded Position After Assignment Near Michican City,Mi + (01:17:14, 8 December 2024)
- ML20204F111 + (01:17:18, 8 December 2024)
- ML20204F110 + (01:17:18, 8 December 2024)
- ML20204F106 + (01:17:19, 8 December 2024)
- ML20204F109 + (01:17:19, 8 December 2024)
- PNO-V-80-038, during 800525-27,series of Major Earthquakes Centered in Mammoth Lakes Region of Central CA Occurred. No Effect on Operations or Structures Occurred & No Seismic Instrumentation Triggered.Diablo Canyon Not Affected + (01:17:20, 8 December 2024)
- ML20204F103 + (01:17:20, 8 December 2024)
- IR 05000338/1987002 + (01:17:21, 8 December 2024)
- ML20204F101 + (01:17:22, 8 December 2024)
- PNO-II-80-164, on 801123,unanticipated Safety Injection Occurred During Testing Involving Loss of Offsite Power. Safeguards Actuation Signal Reset Locally.Caused by Inverter Failure + (01:17:22, 8 December 2024)
- ML20204F097 + (01:17:23, 8 December 2024)
- PNO-IV-82-036, results Received from TLD Vendor Re 821004 Overexposure Event,Indicating Exposures of 5.3 Rem & 6.5 Rem.One Radiographer Experienced Slight Heart Attack on 821005.Ref PNO-IV-82-035 + (01:17:23, 8 December 2024)
- PNO-V-82-046, on 821117,steam Generator Water Chemistry Analyses Identified Chloride Levels Near 250 Ppm.Caused by One or More Tubes Rupturing in Main Condenser.Power Level Ramped Down.Ruptured Tubes Plugged within 4 H + (01:17:24, 8 December 2024)
- PNO-II-80-157, insp Indicated Questionable Fire Damper Installation Integrity in HVAC Sys for Control Room & Other safety-related Areas.Welding Instructions Inadequate.Item Generic.Stop Work Order Issued + (01:17:24, 8 December 2024)
- ML20204F090 + (01:17:25, 8 December 2024)
- PNO-III-81-022, on 810218,package W/One Therapeutic Capsule Shipped to Pharmatopes,Inc.Package Not Received on 810220. Receipt,Transfer,Inventory Records & Bill of Lading Being Checked.Delivery Route Backtracked + (01:17:26, 8 December 2024)